Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 14, 2022 SAM #7470
SOURCES SOUGHT

Y -- UT FLAP 73(2) La Sal Mountain Loop Road

Notice Date
5/12/2022 6:06:26 AM
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22SS0022
 
Response Due
5/26/2022 1:00:00 PM
 
Point of Contact
Ryan Phillips
 
E-Mail Address
cflacquisitions@dot.gov
(cflacquisitions@dot.gov)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT� INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs.� Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:� Ryan Phillips) for receipt by close of business (2 p.m. local Denver time) on May 26, 2022:� (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firm�s capability to bond for a single project of $30 million, and your firm�s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the UT FLAP 73(2) La Sal Mountain Loop Road project in which you performed heavy civil highway construction of similar size, scope, and in mountain terrain. �DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc.� Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.� All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT NUMBER:� UT FLAP 73(2) PROJECT NAME: �La Sal Mountain Loop Road PROJECT DESCRIPTION:� The UT FLAP 73(2), La Sal Mountain Loop Road Project is located approximately 8 miles southeast of Moab, UT in Eastern Utah. The project crosses through Utah State School and Institutional Trust Lands (SITLA), Bureau of Land Management (BLM), private, and United States Forest Service (USFS) lands, providing access to the Manti � La Sal National Forest and Bureau of Land Management lands. The route is categorized as a major rural collector in mountainous terrain and is maintained by San Juan County. This project rehabilitates and reconstructs the existing road with minor superelevation correction, profile adjustments, curve widening, ditch reconstruction, culvert replacements, asphalt surfacing, erosion control, signing, and pavement markings. The existing pavement is in poor condition with significant rutting, cracking, and potholing apparent along the route. To complete the proposed widening and realignment, rock and soil cuts and fills are expected. Due to the mountainous terrain, significant boulders and areas with noted seepage or soft subgrade will be encountered.� The project consists of two segments, broken into Schedule A and Option X. Segment 1 (Option X) � Segment 1 goes from the intersection of Old Airport Road 11+62 to 147+00 at the intersection of Pack Creek Cutoff. Rehabilitation and widening consists of pulverizing the existing pavement, widening the road to 30 feet from the beginning to 45+00 and 26 feet for the remainder of the road, placing aggregate base and asphalt concrete pavement, and drainage improvements. Segment 2 (Schedule A) � Segment 2 goes from 147+00 at the intersection of Pack Creek Cutoff, and goes to 650+91, the boundary with the previous project UT PFH 46-1(2) and UT FLAP 73(1).� Rehabilitation consists of pulverizing the existing pavement, placing new aggregate base leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet. Five locations will be reconstructed requiring raising or lowering profile, placing aggregate base, asphalt concrete pavement, and drainage improvements to widen the roadway width to 26 feet. PRINCIPAL WORK ITEMS (Schedule A): 20401-0000 Roadway Excavation: 75,000 CUYD 30101-0000 Aggregate Base: 55,000 TON 30401-5500 Full Depth Reclamation: 9.45 Miles 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 31,000 TON 60201-1000 Culverts: 4000 LNFT 63501-1000 Temporary Traffic Control: LPSM � PRINCIPAL WORK ITEMS (Option X): 20401-0000 Roadway Excavation: 16,000 CUYD 30101-0000 Aggregate Base: 25,000 TON 30401-5500 Full Depth Reclamation: 2.56 Miles 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 9,600 TON 63501-1000 Temporary Traffic Control: LPSM� ANTICIPATED SCHEDULE: Advertisement � October 2022 Award � December 2022 NTP � January 2023 Winter Shutdown - December 2023 and January 2024 Contract Completion � October 2024 ESTIMATED COST RANGE: Total estimated cost is between $20,000,000 and $30,000,000 MISCELLANEOUS: Construction will take two construction seasons to complete.� The project ranges in elevation from 4870 feet at Station 11+62 to a maximum elevation of 7,960 near Station 616+00.� Construction along the entire alignment may not be always favorable during the construction duration, generally limiting operations sensitive to snow and seasonal cold temperatures at higher elevations during autumn, winter, and spring months (October to April). ��� Due to environmental considerations, Station 545+00 to 651+00 must be completed between May 2023 and October 2023. ��
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/338d098f8556452ca3434a82e11cb46a/view)
 
Place of Performance
Address: UT, USA
Country: USA
 
Record
SN06326162-F 20220514/220512230110 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.