Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 06, 2022 SAM #7462
SOLICITATION NOTICE

H -- Hood Inspections & Maintenance

Notice Date
5/4/2022 9:08:21 AM
 
Notice Type
Solicitation
 
NAICS
811219 — Other Electronic and Precision Equipment Repair and Maintenance
 
Contracting Office
241-NETWORK CONTRACT OFFICE 01 (36C241) TOGUS ME 04330 USA
 
ZIP Code
04330
 
Solicitation Number
36C24122Q0499
 
Response Due
5/6/2022 2:00:00 PM
 
Archive Date
06/05/2022
 
Point of Contact
Issa J Shawki, Contract Specialist
 
E-Mail Address
Issa.Shawki@va.gov
(Issa.Shawki@va.gov)
 
Awardee
null
 
Description
The following has been removed from the Performance Work Statement: 3.3.2 USP 797 TESTING FOR PHARMACY CLEAN ROOMS 3.3.2.1 Primary Engineering Controls (PECs) - All primary engineering controls (PECs) including BSCs, LAFWs, CAIs and CACIs shall be tested to NSF 49 (BSCs), CETA CAG-002-2006 (isolators) specifications and/or manufacturer specifications. 3.3.2.2 HEPA Filter Leak Test - The contractor shall perform a proper HEPA filter leak test of the room air supply HEPA filters. 3.3.2.3 Air Changes per Hour - The contractor shall calculate the total room volume for each buffer and ante room. A sketch of the room with dimensions, exhaust/supply diffuser locations and equipment locations shall be included in the report. The contractor shall calculate air changes per hour (ACPH) for each buffer and ante room and include their findings in the report. In the event that a room does not meet USP 797 requirements for ACPH COR. 3.3.2.4 Pressure Requirements - The contractor shall include in their report differential pressure reading from each buffer/ante room to all surrounding areas. The report shall indicate whether the room is required to be a negative or positive pressure room per USP 797. The contractor shall report all pressures to an accuracy of 0.0001. 3.3.3 Report Requirements - All of the following information should be included in the report for clean room certification. Pass/Fail notifications should be included on a per test basis where applicable. - Room number and/or location - Room type (e.g. oncology prep room) - Date of testing - Date of next required certification - Standards used to test room - Notes - Room sketch (location of supply/exhaust diffusers, equipment, room dimensions) - Total room area and volume - Room humidity and temp - Air changes per hour - Pressure differential 5. Clean Room Test Reports for IV Room, Clean Room, and Ante Room shall include: a. List of equipment used to include manufacturer make, model, serial number, and date calibrated. b. Particle Counts c. Room Air Changes per Hour d. Room pressurization test e. Temperature f. Humidity g. Differential pressure between all rooms Updated Attachment A Base Year Hood /Type Certification Frequency Quantity Unit Unit Cost Amount Biological Safety Cabinets (BSC-A2) USP 797 Semi-Annual 4 PMS   Biological Safety Cabinets (BSC-B2) USP 797 Semi-Annual 2 PMS   Biological Safety Cabinets (BSC-A1) USP 797 Semi-Annual 4 PMS     Chemical Fume Hoods Annual 70 PMS Biological Safety Cabinets (BSC-A2) Annual 50 PMS Laminar Air Flow Workstations (USP 797) Semi-Annual 4 PMS Isolator (USP 797) Semi-Annual 6 PMS   Hazardous Clean Rooms (USP 797) Semi-Annual 4 PMS Non-Hazardous Clean Rooms (USP 797) Semi-Annual 4 PMS Ante Rooms (USP 797) Semi-Annual 16 PMS Miscellaneous Ductless Enclosure Annual 40 PMS Miscellaneous Local Exhaust Ventilation Annual 20 PMS Filter Replacement (est) as needed 25 EA     Repair (est) as needed 15 EA     Option Year 1 Hood /Type Certification Frequency Quantity Unit Unit Cost Amount Biological Safety Cabinets (BSC-A2) USP 797 Semi-Annual 4 PMS   Biological Safety Cabinets (BSC-B2) USP 797 Semi-Annual 2 PMS   Biological Safety Cabinets (BSC-A1) USP 797 Semi-Annual 4 PMS     Chemical Fume Hoods Annual 70 PMS Biological Safety Cabinets (BSC-A2) Annual 50 PMS Laminar Air Flow Workstations (USP 797) Semi-Annual 4 PMS Isolator (USP 797) Semi-Annual 6 PMS   Hazardous Clean Rooms (USP 797) Semi-Annual 4 PMS Non-Hazardous Clean Rooms (USP 797) Semi-Annual 4 PMS     Ante Rooms (USP 797) Semi-Annual 16 PMS     Miscellaneous Ductless Enclosure Annual 40 PMS Miscellaneous Local Exhaust Ventilation Annual 20 PMS Filter Replacement (est) as needed 25 EA Repair (est) as needed 15 EA Option Year 2 Hood /Type Certification Frequency Quantity Unit Unit Cost Amount Biological Safety Cabinets (BSC-A2) USP 797 Semi-Annual 4 PMS   Biological Safety Cabinets (BSC-B2) USP 797 Semi-Annual 2 PMS   Biological Safety Cabinets (BSC-A1) USP 797 Semi-Annual 4 PMS     Chemical Fume Hoods Annual 70 PMS Biological Safety Cabinets (BSC-A2) Annual 50 PMS Laminar Air Flow Workstations (USP 797) Semi-Annual 4 PMS Isolator (USP 797) Semi-Annual 6 PMS   Hazardous Clean Rooms (USP 797) Semi-Annual 4 PMS Non-Hazardous Clean Rooms (USP 797) Semi-Annual 4 PMS     Ante Rooms (USP 797) Semi-Annual 16 PMS     Miscellaneous Ductless Enclosure Annual 40 PMS Miscellaneous Local Exhaust Ventilation Annual 20 PMS Filter Replacement (est) as needed 25 EA Repair (est) as needed 15 EA Option Year 3 Hood /Type Certification Frequency Quantity Unit Unit Cost Amount Biological Safety Cabinets (BSC-A2) USP 797 Semi-Annual 4 PMS   Biological Safety Cabinets (BSC-B2) USP 797 Semi-Annual 2 PMS   Biological Safety Cabinets (BSC-A1) USP 797 Semi-Annual 4 PMS     Chemical Fume Hoods Annual 70 PMS Biological Safety Cabinets (BSC-A2) Annual 50 PMS Laminar Air Flow Workstations (USP 797) Semi-Annual 4 PMS Isolator (USP 797) Semi-Annual 6 PMS   Hazardous Clean Rooms (USP 797) Semi-Annual 4 PMS Non-Hazardous Clean Rooms (USP 797) Semi-Annual 4 PMS     Ante Rooms (USP 797) Semi-Annual 16 PMS     Miscellaneous Ductless Enclosure Annual 40 PMS Miscellaneous Local Exhaust Ventilation Annual 20 PMS Filter Replacement (est) as needed 25 EA Repair (est) as needed 15 EA Option Year Hood /Type Certification Frequency Quantity Unit Unit Cost Amount Biological Safety Cabinets (BSC-A2) USP 797 Semi-Annual 4 PMS   Biological Safety Cabinets (BSC-B2) USP 797 Semi-Annual 2 PMS   Biological Safety Cabinets (BSC-A1) USP 797 Semi-Annual 4 PMS     Chemical Fume Hoods Annual 70 PMS Biological Safety Cabinets (BSC-A2) Annual 50 PMS Laminar Air Flow Workstations (USP 797) Semi-Annual 4 PMS Isolator (USP 797) Semi-Annual 6 PMS   Hazardous Clean Rooms (USP 797) Semi-Annual 4 PMS Non-Hazardous Clean Rooms (USP 797) Semi-Annual 4 PMS     Ante Rooms (USP 797) Semi-Annual 16 PMS     Miscellaneous Ductless Enclosure Annual 40 PMS Miscellaneous Local Exhaust Ventilation Annual 20 PMS Filter Replacement (est) as needed 25 EA Repair (est) as needed 15 EA
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/4db238031b384d179ef483b98e35ddcf/view)
 
Record
SN06316812-F 20220506/220504230108 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.