SOLICITATION NOTICE
Y -- Al Qassim Simulator, Kingdom of Saudi Arabia
- Notice Date
- 4/29/2022 11:34:39 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- W31R ENDIS MIDDLE EAST WINCHESTER VA 22604-1450 USA
- ZIP Code
- 22604-1450
- Solicitation Number
- W912ER22R0028
- Response Due
- 5/13/2022 7:00:00 AM
- Archive Date
- 05/28/2022
- Point of Contact
- MAJ Jonathan Space, Ms. Carla Echols
- E-Mail Address
-
jonathan.m.space@usace.army.mil, Carloso.a.Echols@usace.army.mil
(jonathan.m.space@usace.army.mil, Carloso.a.Echols@usace.army.mil)
- Description
- Amendment 0003, 29 April 2022: The purpose of this amendment is to accomplish the following: 1. Section 00 01 10: Adjust solicitation page numbers accordingly to account for Amendment 0003 changes. 2. Section 00 01 10: Incorporate specifications 497449 RSLFAC DP8 PKG 5 Specifications - Al Qassim and drawings 2022-04-6_AM03_DP08_SA-457449-10_Al Qassim Facilities as a result of bidder inquiry communications. 3. Section 00 01 10: Incorporate 2021-09-23_RSLFAC Phase 2A_Revised Final Geotech Report_Al Qassim as Attachment 8 and 2022-01-31_RSLFAC Phase 2A_Supplementary Geotechnical Report_Al Qassim as Attachment 9. 4. Section 00 01 10: Incorporate Topographic Survey Report Rev01 - Al Qassim as Attachment 10. 5. Section 00 01 10: Incorporate Proposed Field Office and Laydown Area_RSLFAC Al Qassim Simulator as Attachment 11. 6. SF 1442 Block 13A: Extend the proposal due date and time from 6 May 2022, 10:00 AM Eastern Daylight Time (EDT) to 13 May 2022, 10:00 AM Eastern Daylight Time (EDT). 7. Section 00 72 00: Revise drawings and specifications listing under DFARS 252.236-7001 to include 497449 RSLFAC DP8 PKG 5 Specifications - Al Qassim and drawings 2022-04-26_AM03_DP08_SA-457449-10_Al Qassim Facilities. 8. Section 00 73 00: Remove exemption language for VAT from Section O. under Special Contract Requirements. 9. All other terms and conditions remain unchanged. Amendment 0002, 25 April 2022: The purpose of this amendment is to accomplish the following: 1. Section 00 01 10: Adjust solicitation page numbers accordingly to account for Amendment 0002 changes. 2. Section 00 01 10: Incorporate Attachment 3 � Project Overview Sheet Rev 1 under Appendix A, adding recency language �or is currently under construction and is at least 80% complete as of the solicitation issuance date.� 3. SF1442 Block 13A: Extend the proposal due date and time from 29 April 2022, 10:00 AM Eastern Daylight Time (EDT) to 6 May 2022, 10:00AM Eastern Daylight Time (EDT). 4. Section 00 21 00: Incorporate Provision 252.215-7016, Notification to Offerors � Postward Debriefings 5. Section 00 21 16: Increase the page length from six (6) pages to ten (10) pages under subsection 5.2 for Factor 1: Corporate Capability. 6. Section 00 21 16: Change �recency� timeframe language to �within six (6) years of the RFP issuance date� from �within seven (7) years of the RFP issuance date"" under subsection 5.8.1.i, subsection 5.9.1, and subsection 5.9.2 for Factor 4: Past Performance. 7. Section 00 21 16: Remove subcontractor language from subsection 9.1.c, requesting offerors to submit name, address, and DUNS number for any and all A-E subcontractors as A-E subcontractors are not required for this project. 8. All other terms and conditions remain unchanged. Amendment 0001, 30 March 2022: The purpose of this amendment is to accomplish the following: 1. SF1442, Block 13A: Extend the proposal due date and time from 22 April 2022, 10:00 AM Eastern Daylight Time (EST) to 29 April 2022, 10:00 AM Eastern Daylight Time (EST). 2. Section 00 21 00: Incoporate Site Visit information into provision 52.236-27 Alt I. 3. Section 00 21 16: Remove the ""$3.5M requirement for Irrevocable Letter of Credit"" from Tab D, Section 8.1.b. 4. Section 00 21 16: Clarify the Financial Questionnaire as a section of ""Enclosure B"" under Tab E, Section 9.1.d.iv. 5. Section 00 72 00: Change the bonding requirement under clause 52.228-15 for Payment Bonds from 10% to 20% and dollar amount from $1,000,000 to $2,000,000. 6. Section 00 73 00: Remove Bank Letter Guarantee language from Section N. ""Requirements for Issuance of Notice to Proceed"" of the Special Contract Requirements as Bank Letter Guarantees w ill not be accepted for this requirement. 7. All other terms and conditions remain unchanged. This is a Design-Bid-Build project requiring the contractor to construct a Simulator Building�along with all supporting facilities including electric services, water, sewer, gas, paving, walks, curbs, gutters, drainage, site improvements, demolition, and information systems at the�Royal Saudi Land Forces Air Command (RSLFAC) Aviation Institute at Al Qassim, Kingdom of Saudi Arabia. Magnitude of Construction: More than $10,000,000. (a) �The Government reserves the right to incorporate the awardee proposal into the contract and distribute the proposal as deemed necessary. �Any deviations from the proposal must be approved by the Contracting Officer; (b) �The Contractor is required to provide all documentation requested in this solicitation (tender) to include Defense Base Act (DBA) Insurance after contract award and prior to Notice to Proceed. (c) �Performance and Payment Bonds (20%) are required for this acquisition. �
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/d0c4a9178ef64cc1a8f7810a3a9c6f2c/view)
- Place of Performance
- Address: SAU
- Country: SAU
- Country: SAU
- Record
- SN06312717-F 20220501/220429230058 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |