Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 30, 2022 SAM #7425
SOURCES SOUGHT

Y -- AZ FLAP SR181(1), Chiricahua Access Road

Notice Date
3/28/2022 1:24:42 PM
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22SS0014
 
Response Due
3/29/2022 1:00:00 PM
 
Archive Date
04/29/2022
 
Point of Contact
Eric Grosskreuz, Sheri Walsh
 
E-Mail Address
cflacquisitions@dot.gov, cflacquisitions@dot.gov
(cflacquisitions@dot.gov, cflacquisitions@dot.gov)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT� INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:� Eric Grosskreuz) for receipt by close of business (2 p.m. local Denver time) on March 29, 2022:� (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program.� In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration).� This information must be provided in order to determine eligibility � DO NOT SEND COPIES OF YOUR SAM PROFILE; (3) Letter from bonding agent stating your firm�s capability to bond for a single project of $6 million, and your firm�s aggregate bonding capacity; (4) Provide a list of road construction projects of equal or greater value and scope to the AZ FLAP SR181(1), Chiricahua Access Road project in which you performed (as the prime contractor) pulverization, asphalt paving widening, drainage improvements and guardrail installation.� State whether your firm was the prime contractor or subcontractor on the project.� DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc.� Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.� All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs.� This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs.� A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS:� PROJECT NUMBER:� AZ FLAP SR181(1) PROJECT NAME: �Chiricahua Access Road PROJECT DESCRIPTION:� This project consists of the rehabilitation (3R) of approximately 3 miles of Arizona State Route 181 leading to Chiricahua National Monument within Cochise County, Arizona.� SCOPE OF THE WORK:� This project consists of pulverization and paving of approximately 3 miles of existing asphalt paved roadway with some minor widening. Work also includes drainage improvements (new pipe culverts ranging from 18-inch to 36-inch diameter), and new guardrail installation.� PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 12,500 tons of asphalt concrete pavement, gyratory mix, 5,750 tons of aggregate base,� 6,000 cubic yards of sub excavation, 11,000 cubic yards of roadway excavation, 400 linear feet of guardrail, 100 cubic yards of riprap, and 900 linear feet of metal pipe culverts. ANTICIPATED SCHEDULE:� Advertise:� Late Summer 2022 Award:� Fall 2022 Construction:� Fall 2022 � Spring 2023 ESTIMATED COST RANGE:� The anticipated cost range is between $2,000,000 and $5,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b64c342260b94856bcd9bfb0c608a7be/view)
 
Place of Performance
Address: Willcox, AZ 85643, USA
Zip Code: 85643
Country: USA
 
Record
SN06281542-F 20220330/220329211521 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.