Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 16, 2022 SAM #7382
SOLICITATION NOTICE

Z -- PROJECT: 676-20-004 REPLACE CHEMISTRY ANALYZER

Notice Date
2/14/2022 11:57:04 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
252-NETWORK CONTRACT OFFICE 12 (36C252) MILWAUKEE WI 53214 USA
 
ZIP Code
53214
 
Solicitation Number
36C25222B0011
 
Response Due
2/24/2022 11:00:00 AM
 
Archive Date
03/26/2022
 
Point of Contact
Donita L Grace, Contractor
 
E-Mail Address
donita.grace@va.gov
(donita.grace@va.gov)
 
Awardee
null
 
Description
SOLICITATION 36C25222B0011 AMENDMENT A0001 February 14, 2022 Project: Replace Chemistry Analyzer Project Number: 676-20-004 Location: Tomah VA Medical Center, Tomah, WI Amendment 0001 hereby incorporates the following clarifications/change(s) into the solicitation package. Solicitation RFI s/Questions and Answers A. How are debris to be removed from the project limits?  In covered carts via the elevator outside the hours of 0700-1645. Will the elevators be able to be utilized for moving materials? Normal hours or off-tour hours?  Yes - outside the hours of 0700-1645. Will the STARC Systems Fireblockwall system barrier be the only approved Infection control barrier? Other VA sites are allowing the extensive use of lower cost systems such as the STARC LiteBarrier system or the RealWall system. They are fire retardant but the space is covered by fire sprinklers.  1-HR is required. VA Fire Protection design guide requires an Hour. The exceptions are as follows: Not required if functioning sprinklers on both sides just need smoke barrier up to deck poly would work for this. Or if short term 30 days or less (NFPA) if sprinklers are only on one side poly OK. Will the STARC system be required at every location shown? Some of these areas have shorter duration work occurring in them, would poly barriers be sufficient for a 1-3 day operation, for example?  This is a lab environment and the barrier is required for each phase. Refer to response to question 3. Can you provide a basis of design or intent for the temporary protective roof boards on the roof to the temporary HVAC unit?  The protective boards are intended only to protect the roof during construction. It will be removed once the work is completed. In room 2055C, the reflected ceiling plan shows ACT ceiling, it is currently sheetrock and nothing shows to demo existing and replace with ACT. What is correct, hard ceiling or ACT?  2055C has a hard lid ceiling Bid Schedule BID Opening DATE / TIME: WednesdayThursday, February 24, 2022 at 1:00 p.m. CST. LOCATION: Honey Creek Business Park 115 S. 84th Street - Suite 101 Milwaukee, WI 53214-1476. ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS: Donita Grace -- Donita.Grace@va.gov Kristi Kluck --- Kristi.Kluck3@va.gov This solicitation can be monitored at https://beta.sam.gov/opp/a8d8f6ac82824111870acc5a792b45e2/view?keywords=36C25220B0011&sort=-relevance&index=&is_active=true&page=1&refresh=y Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6ada8a9f630f44969d5638de5ee66c56/view)
 
Record
SN06241725-F 20220216/220214230107 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.