SOLICITATION NOTICE
Z -- PROJECT: 676-20-004 REPLACE CHEMISTRY ANALYZER
- Notice Date
- 2/14/2022 11:57:04 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- 252-NETWORK CONTRACT OFFICE 12 (36C252) MILWAUKEE WI 53214 USA
- ZIP Code
- 53214
- Solicitation Number
- 36C25222B0011
- Response Due
- 2/24/2022 11:00:00 AM
- Archive Date
- 03/26/2022
- Point of Contact
- Donita L Grace, Contractor
- E-Mail Address
-
donita.grace@va.gov
(donita.grace@va.gov)
- Awardee
- null
- Description
- SOLICITATION 36C25222B0011 AMENDMENT A0001 February 14, 2022 Project: Replace Chemistry Analyzer Project Number: 676-20-004 Location: Tomah VA Medical Center, Tomah, WI Amendment 0001 hereby incorporates the following clarifications/change(s) into the solicitation package. Solicitation RFI s/Questions and Answers A. How are debris to be removed from the project limits? In covered carts via the elevator outside the hours of 0700-1645. Will the elevators be able to be utilized for moving materials? Normal hours or off-tour hours? Yes - outside the hours of 0700-1645. Will the STARC Systems Fireblockwall system barrier be the only approved Infection control barrier? Other VA sites are allowing the extensive use of lower cost systems such as the STARC LiteBarrier system or the RealWall system. They are fire retardant but the space is covered by fire sprinklers. 1-HR is required. VA Fire Protection design guide requires an Hour. The exceptions are as follows: Not required if functioning sprinklers on both sides just need smoke barrier up to deck poly would work for this. Or if short term 30 days or less (NFPA) if sprinklers are only on one side poly OK. Will the STARC system be required at every location shown? Some of these areas have shorter duration work occurring in them, would poly barriers be sufficient for a 1-3 day operation, for example? This is a lab environment and the barrier is required for each phase. Refer to response to question 3. Can you provide a basis of design or intent for the temporary protective roof boards on the roof to the temporary HVAC unit? The protective boards are intended only to protect the roof during construction. It will be removed once the work is completed. In room 2055C, the reflected ceiling plan shows ACT ceiling, it is currently sheetrock and nothing shows to demo existing and replace with ACT. What is correct, hard ceiling or ACT? 2055C has a hard lid ceiling Bid Schedule BID Opening DATE / TIME: WednesdayThursday, February 24, 2022 at 1:00 p.m. CST. LOCATION: Honey Creek Business Park 115 S. 84th Street - Suite 101 Milwaukee, WI 53214-1476. ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS: Donita Grace -- Donita.Grace@va.gov Kristi Kluck --- Kristi.Kluck3@va.gov This solicitation can be monitored at https://beta.sam.gov/opp/a8d8f6ac82824111870acc5a792b45e2/view?keywords=36C25220B0011&sort=-relevance&index=&is_active=true&page=1&refresh=y Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/6ada8a9f630f44969d5638de5ee66c56/view)
- Record
- SN06241725-F 20220216/220214230107 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |