Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 12, 2022 SAM #7347
SOLICITATION NOTICE

Z -- Alturas Water System Improvement & Cabin Creek Drainage Restoration project on the Sawtooth National Forest

Notice Date
1/10/2022 3:23:58 PM
 
Notice Type
Presolicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
USDA-FS, CSA INTERMOUNTAIN 8 Ogden UT 844012310 USA
 
ZIP Code
844012310
 
Solicitation Number
1240LT22R0008
 
Response Due
3/1/2022 12:00:00 PM
 
Archive Date
04/15/2022
 
Point of Contact
Kellie Shaw
 
E-Mail Address
kellie.shaw@usda.gov
(kellie.shaw@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Proposals are being solicited by the USDA, Forest Service for the Alturas Water System Improvement and Cabin Creek Drainage Restoration project for the Sawtooth National Forest. This project is to reconfigure the existing Alturas Lake Water System to allow for existing fill barriers to be removed in two locations from the former Cabin Creek channel near Alturas Lake.� Work will consist of 1) connecting a new well that was drilled in 2020/2021 to the existing water supply distribution mainline including installation of a new pump house utility building; 2) modifying the existing water supply distribution mainline terminus at the Alturas Outlet Picnic Area including installation of a new hydrant service; 3) modifying the existing well to accommodate a new hand pump service; 4) removing two existing restrooms (one at the Alturas Outlet Picnic Area and one at the Alturas Tent Campground), including disconnecting from the existing water system, and replacing them with two new precast concrete vault toilets; 5) reconfiguring and reconstructing the existing Alturas Outlet Picnic Area including installation of new site amenities and signage; and removing existing earth barriers from the former Cabin Creek channel; and 6) performing all other miscellaneous improvements as required to complete the necessary project work. This solicitation is anticipated to be issued on or after January 26, 2022. The anticipated start date for administrative and construction preparation tasks is mid-April 2022.� On-the-ground construction is anticipated to start September 6, 2022.� The project completion date is November 11, 2022. In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $250,000 to $500,000. Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is FREE.� If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a FREE resource to all small business and your state representative�s contact information can be found at the following website: https://www.aptac-us.org/. All future information about this acquisition, including amendments, will be distributed solely through this site.� Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the System for Award Management (SAM).
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/4d84691ee8c34e268aeeff9fba3bb311/view)
 
Place of Performance
Address: ID, USA
Country: USA
 
Record
SN06213269-F 20220112/220110230058 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.