Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 26, 2021 SAM #7300
MODIFICATION

Z -- FY21-22 Baltimore Harbor and Channels Maintenance Dredging

Notice Date
11/24/2021 11:48:09 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST BALTIMORE BALTIMORE MD 21201-2526 USA
 
ZIP Code
21201-2526
 
Solicitation Number
W912DR22B0001
 
Response Due
1/6/2022 8:00:00 AM
 
Archive Date
02/26/2022
 
Point of Contact
Amber Duty, Phone: 4109623987, Gary Faykes, Phone: 4109620192
 
E-Mail Address
amber.l.duty@usace.army.mil, gary.faykes@usace.army.mil
(amber.l.duty@usace.army.mil, gary.faykes@usace.army.mil)
 
Description
Scope of Work FY22-1 Baltimore Harbor & Channels Maintenance Dredging � Maryland Channels, Chesapeake Bay, Maryland Project Description:� The project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore.� The work is to be performed between November 2021 through March 2022.� The dredging depth is planned for 51 feet mean lower low water (MLLW) with an additional 1 to 2 feet of allowable overdepth for three channel reaches including: Fort McHenry, Craighill Entrance, and Cutoff Angle Channels.� The channels vary in width from 700 to 1,740 feet.� The material dredged from the Fort McHenry Channel (approx. 525,000 cy) will be placed in the Masonville Dredged Material Containment Facility.� The material dredged from the Craighill Entrance and Cutoff Angle channels (totaling approx. 945,000 cy) will be placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island.� The work will include an optional item for dragging of an approximate 2,000,000 square foot area of the Northwest Branch East Channel, which is authorized to a depth of 49 feet MLLW.� A large portion of the work may be performed during the winter months when weather conditions are most severe and will be accomplished in a heavy commercial waterway supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24-30 inch hydraulic unloader, six to eight large tugs, six to eight 2,500 � 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within an anticipated period of performance of 130 calendar days from receipt of Notice-to-Proceed. 10 additional calendar days will be allowed if optional item 0008 is exercised and no additional construction time will be allowed if optional item 0009 is exercised.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/b27033746af344c9b410c753132678b2/view)
 
Place of Performance
Address: Baltimore, MD 21201, USA
Zip Code: 21201
Country: USA
 
Record
SN06184887-F 20211126/211124230116 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.