Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 05, 2021 SAM #7279
SOLICITATION NOTICE

Y -- Supply, Install of New Water Transmission Pipeline From Proposed WTP at Kufranjeh Dam to the AL-Qaeda Proposed Reservoir at Anjara High Area � Ajloun Governorate including Supply of pipes, valves and fittings to YWC Warehouse.

Notice Date
11/3/2021 6:42:42 AM
 
Notice Type
Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
USAID/JORDAN Washington DC 20521 USA
 
ZIP Code
20521
 
Solicitation Number
YWC-FARA5_2-4_2021
 
Response Due
11/17/2021 1:00:00 PM
 
Archive Date
12/02/2021
 
Point of Contact
Eng. Dalal Elewah, Phone: 0096227246859
 
E-Mail Address
Dalal_Eliwah@yw.com.jo
(Dalal_Eliwah@yw.com.jo)
 
Description
Supply, Install of New Water Transmission Pipeline From Proposed WTP at Kufranjeh Dam to the AL-Qaeda Proposed Reservoir at Anjara High Area � Ajloun Governorate and Supply of pipes, valves and fittings to YWC Warehouse Contract No: YWC-FARA 5-2.4 /2021 Yarmouk Water Company invites eligible contarctors classified by the GTD as Grade (2) and Grade (3) in the field of water and wastewater, to tender for the performance of the Contract Supply, Install of New Water Transmission Pipeline From Proposed WTP at Kufranjeh Dam to the AL-Qaeda Proposed Reservoir at Anjara High Area � Ajloun Governorate and Supply of pipes, valves and fittings to YWC Warehouse, YWC-FARA5-2.4/2021. As defined in these tender documents, hereinafter referred to as the ""Contract"" The Contractor shall be responsible for the supply of materials, the installation, completion and making good of any defects, as well as the provision of all necessary supervision, labor, plant, materials, equipment, and related services, of the ""Works"" of the Contract, which are described in the Tender Documents, the Bill of Quantities and the Drawings for the Supply and Install of New Transmission Pipeline from Proposed WTP at Kufranja Dam to Proposed Reservoir Al-Qaeda at Anjara. In addition, the contractor is responsible for supplying specified quantities of pipes, valves and fittings to YWC warehouse.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/3d178406c33042f386342c06ee24dcec/view)
 
Place of Performance
Address: JOR
Country: JOR
 
Record
SN06170026-F 20211105/211103230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.