Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 25, 2021 SAM #7207
SOLICITATION NOTICE

Y -- Middle Logan Creek Flood Risk Management Project, Phase 2 Randolph, NE

Notice Date
8/23/2021 8:39:14 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W071 ENDIST OMAHA OMAHA NE 68102-4901 USA
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F21B0012
 
Response Due
8/20/2021 12:00:00 PM
 
Archive Date
09/04/2021
 
Point of Contact
David W. Neal, Phone: 4029952988, Lynne D. Reed, Phone: 4029952039
 
E-Mail Address
david.w.neal@usace.army.mil, lynne.d.reed@usace.army.mil
(david.w.neal@usace.army.mil, lynne.d.reed@usace.army.mil)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Description
Site Visit has been scheduled for Tuesday, 27 July 2021 at 10:00 am local time. Participants will meet at 212 East Broadway, Randolph, NE (City Offices of Randolph). Contractors interested in seeing the site need to make reservation with Todd Tobias telephone (402) 650-0358 or by e-mail at Todd.R.Tobias@usace.army.mil. The flood risk reduction project is along the Middle Logan Creek in�Randolph, Nebraska. The work reach extends from�approximately 550-feet�upstream of County Line Road (558th Ave) to 150 feet upstream of Sholes�Road bridge. The work in general comprises: 1) Earthwork/grading for the realigned and widened Middle Logan Creek�channel - excavating existing channel to a widened channel bottom of 40�feet with 95-foot top width, 3:1 side slopes, and a 5-foot wide and 1-foot�deep low flow channel. 2) Transition from natural channel approximately 400 feet upstream of�558th Ave bridge to the trapezoidal widened channel section. 3) Channel improvements with erosion and grade control, placement of�new riprap, and other erosion control include turf reinforcement mat,�seeding, erosion control blanket, silt fence, etc.� 4) New and extended storm drain structures. 5) Removal and replacement of Main St., Douglas St., and 558th Ave�bridges. 6) Removal of a 42-foot long pedestrian bridge, not to be replaced. 7) Horizontal roadway realignment for Main St. bridge and vertical�roadway realignment for the approaches to Main St., Douglas St. and 538th�Ave bridge. 8) Shoo flybridge detour for 558th Ave bridge construction. 9) New 3 strand barb wire fencing, new concrete pavement, and new�aggregate pavement; and 10) Installation of a new sanitary sewer siphon system and four domestic�waterlines. �
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/c4bc42317902448fae5e5e81a427be9a/view)
 
Place of Performance
Address: Randolph, NE 68771, USA
Zip Code: 68771
Country: USA
 
Record
SN06106975-F 20210825/210823230121 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.