SPECIAL NOTICE
H -- 36C26221P0621 P00001_Triennial PMI, Testing, Calibration & Certification of Electrical Systems, VA Loma Linda HCS
- Notice Date
- 7/1/2021 4:58:11 PM
- Notice Type
- Justification
- NAICS
- 811219
— Other Electronic and Precision Equipment Repair and Maintenance
- Contracting Office
- 262-NETWORK CONTRACT OFFICE 22L (36C262) LONG BEACH CA 90815 USA
- ZIP Code
- 90815
- Solicitation Number
- 36C26221P0621
- Archive Date
- 09/29/2021
- Point of Contact
- NICHOLS, CECIL S., Contracting Officer, Phone: (562) 713-6994
- E-Mail Address
-
cecil.nichols@va.gov
(cecil.nichols@va.gov)
- Award Number
- 36C26221P0621
- Award Date
- 03/08/2021
- Awardee
- PACIFIC COAST CONTRACTING GROUP SACRAMENTO 95834
- Award Amount
- 20951.00000000
- Description
- Attachment 1: Within Scope Determination Attachment 4: Determination DEPARTMENT OF VETERANS AFFAIRS Veterans Health Administration Network Contracting Office (NCO) 22 Long Beach, CA 90815 MODIFICATION (EXCLUDING OPTIONS) DETERMINATION Department of Veterans Affairs / Veterans Health Administration Network Contracting Office: NCO 22L Contract Number: 36C26221P0621 Modification Number: P00001 Modification TYPE Chosen: Bilateral Supplemental Agreement (Change Order or Supplemental Agreement) Modification REASON Chosen: Supplemental Within Scope Work (stand-by charges for work unable to be perform due to unforeseen circumstances Tower 8 ATS CX not operational) Modification FAR AUTHORITY: FAR Clause 52.212-4 Contract Terms & Conditions Commercial Items (Oct 2018) Contractor Name: Pacific Coast Contracting Group (PCCG) Original Cost of Contract: $219,900.00 Modification Cost: $20,951.00 Total cost of Modifications to Date: $0.00 Number of days added by modification: Eighty (80) calendar days Number of days taken away by modification: Zero (0) Original Period of Performance: One Hundred Twenty (120) calendar days Total number of days added by other modifications to date: Zero (0) calendar days Total number of days taken away by other modifications to date: Zero (0) calendar days Additional Information to Support/Justify the Modification: 1. Describe in detail the need for the changed work, time, or cost. Modification required to compensate vendor for stand-by charges related to cancelled due to unforeseen circumstances reference PMI and testing scheduled for 6/4-5/2021 once vendor was already mobilized and onsite. Amount of within scope vendor effort requires additional time and cost to complete because of Tower 8 ATS CX is inoperable. 2. A statement addressing whether the proposed modification is within the original scope of the contract and specifically addressing the facts considered in reaching the conclusion. Modification is within scope and required to compensate vendor for stand-by charges related to VA Loma Linda cancellation of scheduled work due to unforeseen circumstances reference PMI and testing scheduled for 6/4-5/2021 once vendor was already mobilized and onsite. Amount of within scope vendor effort requires additional time and cost to complete because of Tower 8 ATS CX is inoperable. Facts and alternatives in reaching this conclusion is: 1) modify the contract or 2) terminate contract for convenience. The best and only alternative is to modify the existing contract due to time constraints and continued need. Requested modification action is within scope of base contract and will permit continued performance without severely impacting the hospital mission of patient care. 3. A statement analyzing the pricing factors considered in reaching a fair and reasonable price determination and identifying each Line Item Number affected, including but not limited to, IGCE, market research, and any other price analysis information. Pricing factor considered in reaching a fair and reasonable price determination include technical review by station Subject Matter Expert (SME), vendor quote, and contracting officer personal experience. 4. Were technical and legal reviews conducted based on VHAPM Part 801.602-70 Contract Reviews SOP, if not, attach HCA approved exemption, if applicable. Technical review required one level above CO per contract matrix due to time (exceeds 60 calendar days). Legal review not required since modification does not exceed $100K. DETERMINATION Based on the above, this modification is determined to be fair and reasonable and in the best interest of the U.S. Government. CECIL S. NICHOLS Date: 07/01/2021 Contracting Officer
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/219af96308764769a6a434fa61223fee/view)
- Record
- SN06048819-F 20210703/210701230113 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |