Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 14, 2021 SAM #7104
SOLICITATION NOTICE

Z -- Blue Bill Waterline

Notice Date
5/12/2021 8:58:37 AM
 
Notice Type
Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT TULSA TULSA OK 74137-4290 USA
 
ZIP Code
74137-4290
 
Solicitation Number
W912BV-21-Q-0052
 
Response Due
5/19/2021 12:00:00 PM
 
Archive Date
06/03/2021
 
Point of Contact
Gilbert Pinckney, Phone: 5712084218, Rudolfo J. Morales, Jr., Phone: 9186697275
 
E-Mail Address
Gilbert.Pinckney@usace.army.mil, rudolfo.morales@usace.army.mil
(Gilbert.Pinckney@usace.army.mil, rudolfo.morales@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Amendment 0001 The purpose of this amendment is to: 1. Update the Contract Specialist to read Gil Pinckney, Contractor Support. 2. Update the Instructions, Conditions & Notices to Offerors as specified in Section 00 21 00. 3. Incorporate the Proposal Preparation and Evaluation Criteria as specified in Section 00 22 11. 4. Update FAR Clause 52.236-27 Site Visit (Construction) 5. The proposal due date remains unchanged. 6. The POC for this action is Gil Pinckney, Contractor Support, email: gilbert.pinckney@usace.army.mil. SEE SUMMARY OF CHANGES Contractor shall provide all labor, equipment, fuel and�various materials to install approximately 1,750 feet of 2-inch high density polyethylene (HDPE) waterline, 3,500� of 1-inch HDPE waterline, 4 � 2� brass cutoff ball-valves with brass unions and appropriate valve boxes, 40 frost free hydrant assemblies, and approximately 4,700� of copper tracer wire buried with all HDPE waterlines within Blue Bill Recreational Area, Wagoner County, Oklahoma.� Work includes all aspects of the removal of existing water hydrants and pedestals and the installation of new waterline and hydrants.� All aspects of the work must comply with all state and local codes. It will be the contractor�s responsibility to locate all existing underground utilities prior to any excavation activities. Contractor shall make a connection to the existing water supply and shall test all sections installed prior to back filling.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/62022b77daee4fd2b60f54277c83edf2/view)
 
Place of Performance
Address: Wagoner, OK, USA
Country: USA
 
Record
SN05999653-F 20210514/210512230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.