SOURCES SOUGHT
99 -- Plumbing Services
- Notice Date
- 5/6/2021 2:35:00 PM
- Notice Type
- Sources Sought
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- FA9302 AFTC PZIE EDWARDS AFB CA 93524-1185 USA
- ZIP Code
- 93524-1185
- Solicitation Number
- PlumbingBPA
- Response Due
- 5/11/2021 1:00:00 PM
- Archive Date
- 05/26/2021
- Point of Contact
- Shelley White, Phone: 7606460462, John Walker, Phone: 6612771829
- E-Mail Address
-
shelley.white.2@us.af.mil, john.walker.68@us.af.mil
(shelley.white.2@us.af.mil, john.walker.68@us.af.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- Seeking Sources Only: BPA for Plumbing Services for the 412th EWG at Edwards Air Force Base Respondent shall provide all supervision, labor, material, equipment, insurance, licenses, bonding and supplies to perform plumbing services at the 412th Electronic Warfare Group. Services include but are not limited to the following: a) Repair and replace water and sanitary sewer piping, (PVC, CPVC, galvanic pipe, copper tubing, and stainless steel piping), unclog sewer lines. b) Repair and replace gas lines, including excavation if required. (backhoe services) c) Replacement and modification of storm sewer, sanitary sewer, domestic water, deionized water and R.O. water systems. d) Welding for pipefitting: Pipefitter must be certified to comply with ASME Boiler Pressure Vessel Code. e) Remove and/or install faucets, steam traps, shower diverters, hydration stations, sinks, garbage disposals, tub shoes, shower bases, sink & tub drains, soldered copper pipe, cut and thread piping, remove and/or install soldered, threaded, Viega ProPress systems, remove and/or reinstall plastic PVC piping and fittings on an as needed basis, including emergency work and repairs. All plumbing work to comply with current UPC plumbing code. f) Repair of water Distribution Main, up to 12 inches in size of C-900 PVC, Ductile iron pipe and mechanical joint fittings. g) The Respondent shall also provide electric and gas water heater installation, repair and/or replacement. h) The Respondent shall have a variety of solutions and ready access to the parts and materials for each subproject installation or repair. i) The Respondent is responsible for providing all plumbing equipment and materials necessary to complete the work unless specifically excluded in the specific project scope. j) Landscaping, hardscapes and irrigation systems must be protected from damage with track mats or other acceptable methods. If landscaping, hardscape or irrigations systems are damaged, it is the responsibility of the Respondent to repair and return the area to the original state. Methods and results must be approved by the EWG project manager. k) Respondent may be required to work in confined spaces. Proper safety and personnel protective equipment shall be utilized. l) There are two levels of response anticipated, normal and emergency. Normal requests are associated with planned work. Emergency requests will be designated as an emergency by EWG when making the request. All requests not specifically identified by EWG as emergency are normal requests. Emergency requests must be tended to within 2 hours. RFQ1476161 February 10, 2021 7 m) The Respondent shall be equipped with a staffed telephone service available during the normal working hours of 8:00 am to 5:00 pm Monday through Friday for receiving and making calls. Other office requirements are the ability to send and receive emails. The Respondent shall provide a 24/7 contact to address afterhours and emergency requests n) The EWG Representative will contact the Respondent with project information. The Respondent or Respondent's representative shall respond by meeting with the EWG Representative (and possibly the others) to conduct a scope of work validation, site visit, and conference for normal requests. During the meeting, the following are discussed and established: Project number and title Site investigation Methods and alternatives for accomplishing work per plans and specifications. Detailed scope of the work, definitions, and refinement of tasks and quantities as required. Time requirements for completion, site availability. o) Upon acceptance of the project by both parties, the EWG Representative will initiate the generation of the purchase order for the project. p) Once the purchase order is issued, the Respondent will begin work as per date range specified with the EWG Representative. The EWG Representative or his/her delegate will perform the Contract administration associated with the project until work completion, including final inspection and acceptance. q) At time of project completion, the Respondent will submit an invoice for payment to be approved by the EWG Representative's authority. r) 412th EWG shall not be responsible for payment of any unauthorized work. s) Will need regular and emergency rate prices. No award is anticipated to be made from this sources sought announcement.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/e54b45b21b7a4867bf8fc81e8d13f2e7/view)
- Place of Performance
- Address: Edwards, CA 93524, USA
- Zip Code: 93524
- Country: USA
- Zip Code: 93524
- Record
- SN05994678-F 20210508/210506230120 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |