SOLICITATION NOTICE
R -- Training Aids, Devices, Simulators and Simulations (TADSS) for the Training Support Center (TSC) Fort Hood
- Notice Date
- 1/7/2021 2:10:00 PM
- Notice Type
- Solicitation
- NAICS
- 561210
— Facilities Support Services
- Contracting Office
- W6QM MICC-FDO FT HOOD FORT HOOD TX 76544-5025 USA
- ZIP Code
- 76544-5025
- Solicitation Number
- W91151-21-R-0003
- Response Due
- 1/29/2021 1:00:00 PM
- Archive Date
- 02/13/2021
- Point of Contact
- Kendrick Nance, Phone: 2542876495
- E-Mail Address
-
kendrick.r.nance.civ@mail.mil
(kendrick.r.nance.civ@mail.mil)
- Small Business Set-Aside
- 8A 8(a) Set-Aside (FAR 19.8)
- Description
- PERFORMANCE WORK STATEMENT (PWS) � TRAINING AIDS, DEVICES, SIMULATORS AND SIMULATIONS (TADSS), TRAINING SUPPORT SERVICES FOR THE TRAINING SUPPORT CENTER (TSC), FORT HOOD, TX � 21 December 2020 � PART 1 � GENERAL INFORMATION � GENERALINFORMATION: This is non-personnel services to provide Training Support Services at Fort Hood, TX: 126 counties Area of Responsibility-AOR, Texas National Guard, and Installation Management Command (IMCOM). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. � BACKGROUND: Army regulation 350-52 defines responsibilities and prescribes policies of Army Training Support System (TSS) programs on Army installations to ensure that TSS resources are allocated properly to support the Army�s training strategies. IMCOM�s Common Levels of Support (CLS) 905 identifies the training support requirement to the installation. The TADSS support services contract fulfills that Army and Installation requirement to provide this training support. � OBJECTIVES: The primary objective of the TO is to provide TADSS support services which includes operating warehouses: prioritizing daily work orders; issuing, tracking, receiving and shipping TSC�s Property; providing technical assistance to using organizations; design and fabrication of TADSS; performing operational and organization maintenance and repairs on TSC property and developing and maintaining statistical and financial reports. � SCOPE OF WORK: Fort Hood requires contracted services to provide all personnel, supplies, transportation, tools, materials, supervision, and non-personal services necessary to perform TADSS training support services located at Fort Hood, TX: which includes but not limited to the following: Warehouse operations, technical support to users, operator/instructor training and device fabrication. TADSS support services shall be provided to TSC account holders and authorized users: On Post-Active Duty Military and Staff Agencies - approximately 211; Off Post-Reserve, ROTC, Community and University - approximately 85; and Temporary Accounts- (Infrequent Use- Average 17) The number of TSC account holders and authorized users may fluctuate throughout the term of the TO. The Contractor shall perform to the standards in this TO and in this performance work statement. � �PERIOD OF PERFORMANCE: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years, 30 days Phase-In and 30 day Phase-Out. (Dates are subject to change). The Period of Performance reads as follows: Phase-In�������� ������1 April 2021-1 May 2021 Base Year������������� 1 May 2021-30 April 2022 Option Year I������ 1 May 2022-30 April 2023 Option Year II����� 1 May 2023-30 April 2024 Option Year III��� 1 May 2024-30 April 2025 Option Year IV���� 1 May 2025-30 April 2026 �� Phase-Out����������� 1 May 2026-1 June 2026 � GENERAL INFORMATION � QUALITY CONTROL: The Contractor shall develop and maintain an effective quality control plan (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor�s QCP is the means by which the Contractor assures themselves that their work complies with the requirements of the TO. The QCP shall be submitted to the COR for approval 30 working days after performance start date and shall be updated thereafter to maintain an effective and efficient quality control program. After acceptance of the QCP, the contractor shall receive the COR�s acceptance in writing of any proposed changes to the QC system. � QUALITY ASSURANCE: The Government will evaluate the Contractor�s performance under this contract in accordance with a Quality Assurance Surveillance Plan (QASP) that is tailored specifically to this TO. The QASP will be used to evaluate Contractor actions while implementing the PWS. The QASP is designed to provide an effective surveillance method to monitor Contractor performance for each objective listed on the Performance Requirements Summary (PRS). HOLIDAYS: The following federal holidays are observed by the Government: New Year�s Day���������� Labor Day Martin Luther King Jr.�s Birthday����������������������������������� Columbus Day President�s Day������������������������������������������������������������������� Veteran�s Day Memorial Day��������������������������������������������������������������������� Thanksgiving Day Independence Day������������������������������������������������������������� Christmas Day � When one of the above Federal holidays falls on a Sunday the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday the preceding Friday is observed as a holiday. This list of holidays relates to Government duty days and is not intended to supplement or otherwise alter the provisions of the Wage Determination regarding paid holidays. � HOURS OF OPERATION: The Contractor shall be responsible for conducting business, between the hours of� 7:30 AM to 4:30 PM Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price (FFP) contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. Flexed work schedules may be required in the performance of services on this contract. If Government personnel are furloughed, the Contractor shall contact the Contracting Officer or the COR to receive specific instructions relating to support services operations. It is the Government's decision as to whether the contract price/cost will be affected as a result of Government shutdown and/or furloughed Government employees. In the event Government shutdown: (Weather/Safety/Pandemic/Epidemic Response) and/or furloughed Government employee�s absence impact contract price/cost, a negotiated settlement will be reached as deemed appropriate by the Contracting Officer. � ��PLACE OF PERFORMANCE: The work to be performed under this contract will be performed at buildings 22041 and 19031, Fort hood, Texas. TYPE OF CONTRACT: The Government will award a Fixed Firm Price (FFP). � SECURITY REQUIREMENTS: Contractor personnel performing work under this contract does not require a security clearance but will be subjected to a National Agency Check with Local Agency Check and Credit Check (NACLC) at the time of the proposal submission. The security requirements are in accordance with DD254. All Contractor employees requiring computer access shall obtain a CAC through the Trusted Associate Sponsorship System (TASS) in accordance with Army Regulation (AR) 600- 8-14 and AR 190-13. All Contractor employees requiring a CAC must have at least a National Agency Check trustworthy investigation submitted through the Office of Personnel Management. This is a requirement for all Contractors to receive a CAC through the TASS and to have access to any Department of the Army Local Area Network (LAN). Contractors assigned to this TO who require access to Government installations in performance of their duties shall have an owning relationship established in the Joint Personnel Adjudication System (JPAS) to the Government installation for which they are executing the TO.� The Security Office where the Contractor(s) is assigned shall perform the JPAS requirement.� Visit Requests shall be cleared by the Security Office of the Government installation where the Contractor is assigned.� For Contractors who do not require access, a Visit Authorization Letter (VAL) shall be submitted to the Security Office of the Government installation where the Contractor is visiting. All Contractor employees requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within ninety (90) calendar days after TO start date or effective date of incorporation of this requirement into the TO, whichever is applicable. All Contractor employee shall complete the DoD Information Assurance (IA) awareness training (Cyber Security) within thirty (30) days, before issuance of network access and annually thereafter. All Contractor employees with access to a Government information system (IS) shall be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services.� Per AR 530-1, Operations Security, new Contractor employees shall complete Level I OPSEC training within thirty (30) calendar days of their reporting for duty.� All Contractor employees shall complete annual OPSEC awareness training.� � �PHYSICAL SECURITY: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work day, Government facilities, equipment, and materials shall be secured. � KEY CONTROL:� The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the COR. In the event, keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the COR, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be paid by the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost will be paid by the Contractor. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor�s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor�s QCP. � SPECIAL QUALIFICATIONS: The Contractor is responsible for ensuring employees possess and maintain current Information Assurance Technician (IAT) Level I professional certification during the execution of this TO. � ���POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the government views the Contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government. � CONTRACTING OFFICER REPRESENTATIVE (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. � KEY PERSONNEL: The following personnel are considered key personnel by the Government: Program Manager, Alternate Program Manager, Quality Control Manager and Information Assurance Technician (IAT) Level I. The Contractor shall provide a Program Manager who shall be responsible for the performance of the work. The Contractor shall submit the name of this person and an alternate who shall act for the Program Manager when the manager is absent, this individual shall be designated in writing to the KO. The Program Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30AM to 4:30PM, Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons. Qualifications for all key personnel are listed below: � ��The Contractor shall provide a full-time (on-site) dedicated Program Manager (PM) that has the corporate decision-making authority to effectively and rapidly�� respond to TO requirements. The letter listing the PM shall outline the scope of authority of the PM, also for contingencies after normal operating hours the PM or APM shall respond within two hours. � ���The Contractor shall designate in writing an (on site) Alternate Project Manager (APM). The APM shall be present during normal operating hours and available when the PM is absent. The APM shall possess extensive experience in the Training Aids, Devices, Simulators and Simulations (TADSS) area. � The Contractor shall provide a Quality Control Manager (QCM) who shall be responsible for creating, implementing, updating and ensuring compliance with an approved Quality Control Plan (QCP) within thirty (30) day of the start of the TO. The QCM shall demonstrate a thorough knowledge of the ISO 9001, Quality Management System Standard. � The Contractor shall provide Information Assurance Technician (IAT) Level I with professional certification. The IAT Level I will be responsible for administration of all computers, computer systems and associated equipment required to perform services on this TO i.e. the Local Area Network (LAN). The IAT Level I will be responsible for performing basic computer upgrades and troubleshooting services. The IAT Level I must demonstrate four years progressive experience in computer and associated equipment operation, possess the knowledge and skills to understand Local Area Network (LAN) technology and qualified to administer a LAN. � ��IDENTIFICATION OF CONTRACTOR EMPLOYEES: All Contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as Contractor products or that contractor participation is appropriately disclosed. Contractor personnel shall wear Contractor provided identification (ID) badges while on duty. The badges shall be visible outside of clothing on the upper body area. � ���CONTRACTOR TRAVEL: Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified on this TO. All travel requires Government approval/authorization and notification to the� COR. Any off-site travel necessary to complete the tasks outlined in the PWS shall be coordinated with and approved by the COR prior to commencement and execution IAW the FAR. � ���OTHER DIRECT COSTS:� This ODC is provided for equipment and supplies used in the performance of this contract. This category includes travel (outlined in 1.6.13), reproduction, and shipping expenses associated with training activities. It could also entail the renting/leasing of vehicles for training support service missions. In order to be reimbursed, all receipts and documents supporting the purchases are required to be submitted with the invoice. The Contractor is required to prove any reimbursable items are fair and reasonably priced, to the satisfaction of the contracting officer, in order to be reimbursed. ODC is reimbursed excluding profit or fee. � ��Deleted. � ��REPORTS: Routine written products may be required and are the property of the Government and shall be submitted to the COR at the established time and date.� Deliverable versions of the report and briefings are expected to contain complete and substantial technical content that can be applied to Government program processes by Government personnel, not merely format outlines containing trivial information.� In the case of project briefings/presentations/lesson plans, the OSCOR will review all Contractor-developed deliverables and work-product.� Each review will consist of a subject-matter editorial and content review for completeness and writing quality.� The Contractor shall make changes, additions, and revisions requested by the Government and include these in subsequent deliverable work-product versions.� The Government will review all reports and provide comments within fourteen (14) calendar days unless otherwise indicated.� The Contractor shall incorporate Government comments and provide revised reports within thirty (30) calendar days after receiving Government comments unless otherwise indicated.� If the Contractor deems that the Government-proposed time-frame for major work is not feasible, then the Contractor shall propose an alternative time-frame or solution alternative.� The OSCOR must agree, in writing, to change the Government-proposed time-frame for major work. � ��PAYMENT: The Contractor shall bill the Government on a monthly basis.� A copy of the invoice and DD250 shall be sent electronically to the OS-COR and the COR not later than the 18th of each month. The Contractor shall, upon receipt of a Wide Area Workflow (WAWF) approved DD250, submit the invoice, DD 250; and other pertinent modification documents to the DFAS Office listed in this contract. � � �ORGANIZATIONAL CONFLICT OF INTEREST: Contractor personnel performing work under this TO may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the COR immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the COR to avoid or mitigate any such OCI. The Contractor�s mitigation plan will be determined to be acceptable solely at the discretion of the COR and in the event the COR unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the COR may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI. � ���PHASE IN /PHASE OUT PERIOD: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the thirty (30) day phase-in/phase-out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the TO start date. Contractor shall submit a Phase-In-Plan within five (5) working days of contract award and phase out thirty (30) days prior to the contract expiration. The Contractor shall be responsible for full performance during the phase-out period. � � PART 2 DEFINITIONS & ACRONYMS DEFINITIONS AND ACRONYMS: � 2.1. DEFINITIONS � 2.1.1.�� CONTRACTOR.� A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this TO refers to the prime. � 2.1.2.�� CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government. � 2.1.3.�� CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the KO to administer the TO. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the TO, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract. � 2.1.4.�� DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement. � 2.1.5��� DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports. � 2.1.6.�� SUPPLIES AND MATERIEL. Supplies and Materiel that are consumed in use, such as paint, fuel, cleaning and preserving materials, etc., or that lose their identity, such as spare parts, etc. Also called consumable supplies and materiel. � 2.1.7.�� FIELD MAINTENANCE. Maintenance that is routine, regular and scheduled or periodic (e.g. servicing, cleaning, inspection, minor repairs and replacement). -10/-20 Standards. Maintenance which is the responsibility of and performed by a using organization on its assigned equipment. Its phases normally consist of inspecting, servicing, lubricating, adjusting, and the replacing of parts, minor assemblies, and subassemblies. Unit maintenance tasks performed by the operator, crew, and/or unit maintenance personnel to detect and correct faults. � 2.1.8.�� GOVERNMENT-FURNISHED PROPERTY (GFP). Means property in the possession of or directly acquired by the Government and subsequently made available to the Contractor. � 2.1.9.�� GOVERNMENT PROPERTY. All property owned by or leased to the Government or acquired by the Government under the terms of the contract. It includes both Government-furnished property and contractor-acquired property as defined in this section. � 2.1.10.�� HAZARDOUS MATERIALS. For the purpose of this PWS, are defined as any other material designated by a Government technical representative as potentially hazardous and requiring safety controls. Hazardous material as defined in the latest version of the Federal Standard No. 313 is also applicable pursuant to Federal Acquisition Regulation (FAR) 23.301 Definition. � 2.1.11.�� INSTALLATION PROPERTY. For the purposes of this PWS, means property of high value (including equipment, machine tools, test equipment, furniture, vehicles, and accessory and auxiliary items) used in fabricating supplies or used for any administrative purpose in the performance of services. � 2.1.12.�� KEY PERSONNEL. Contractor personnel who are evaluated in a source selection process and who may be required to be used in the performance of a TO by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. � 2.1.13.�� PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property. � 2.1.14.�� PROPERTY. For the purposes of this PWS, means all property, both real and Installation. It includes facilities, material, special tooling and agency-peculiar property. � 2.1.15.�� PROPERTY ADMINISTRATOR (PA). A property administrator may be designated, by letter of appointment from the KO, to administer the contract requirements and obligations relative to GFP. The Contractor will be provided a copy of the property administrator appointment letter. � 2.1.16.�� QUALITY ASSURANCE. The Government�s procedures to verify that services being performed by the Contractor are performed according to acceptable standards. � 2.1.17.�� QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance. � 2.1.18.�� QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements. � 2.1.19.�� REAL PROPERTY. Means land and rights in land, ground improvements, utility distribution systems, and buildings and other structures. It does not include foundations or personal property. � 2.1.20.�� REPAIR. To restore an item to a serviceable condition through correction of a specific failure or unserviceable condition and performing such action to make the equipment operable. � 2.1.21.�� SPECIAL TOOLING. For the purpose of the PWS, means jigs, dies, fixtures, molds, patterns, taps, gauges, other equipment and fabrication aids, all components of these items, and replacement of these items which are of such a specialized nature that without substantial modification or alteration their use is limited to the development or production of particular supplies or parts thereof or to the performance of particular services. It does not include material, facilities, general or special machine tools or similar capital items. � 2.1.22.�� TRAINING AIDS, DEVICES, SIMULATORS AND SIMULATIONS (TADSS). As used in this PWS, means Government property issued to TSC customers for their direct use. It includes expendable supplies and materiel; installation property; and special tooling, as defined in this section. � 2.1.23.�� WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract. � �� 2.1.24.�� WORK WEEK. Monday through Friday, unless specified otherwise. � �� 2.1.25���� ACRONYMS: � ACOR����������������������������������� Alternate Contracting Officer's Representative AFARS��������������������������������� Army Federal Acquisition Regulation Supplement AR����������������������������������������� Army Regulation CCE�������������������������������������� Contracting Center of Excellence CFR��������������������������������������� Code of Federal Regulations CONUS��������������������������������� Continental United States (excludes Alaska and Hawaii) COR�������������������������������������� Contracting Officer Representative COTR����������������������������������� Contracting Officer's Technical Representative COTS������������������������������������ Commercial-Off-the-Shelf DA����������������������������������������� Department of the Army DD250���������������������������������� Department of Defense Form 250 (Receiving Report) DD254���������������������������������� Department of Defense Contract Security Requirement List DFARS��������������������������������� Defense Federal Acquisition Regulation Supplement DMDC���������������������������������� Defense Manpower Data Center DOD�������������������������������������� Department of Defense FAR��������������������������������������� Federal Acquisition Regulation GFP���������������������������������������� Government Furnished Property GP������������������������������������������ Government Property KO����������������������������������������� Contracting Officer OCI���������������������������������������� Organizational Conflict of Interest OCONUS������������������������������ Outside Continental United States ODC��������������������������������������� Other Direct Costs PA������������������������������������������� Property Administrator PIPO��������������������������������������� Phase-In/Phase-Out POC���������������������������������������� Point of Contact PRS����������������������������������������� Performance Requirements Summary PWS���������������������������������������� Performance Work Statement QA������������������������������������������ Quality Assurance QAP��������������������ï¿MENT, AND SERVICES � ��� 3. GOVERNMENT FURNISHED ITEMS AND SERVICES: � 3.1.�� Services: The Government will provide preventive maintenance and repair of Government owned facilities. The Government will maintain the facilities IAW FH Reg. 420-27. Unless otherwise required maintenance will be provided IAW Government prescribed maintenance schedules. The Contractor shall notify the COR in writing when facility repairs or maintenance are required. � The Government will provide telephone, facsimile, and website services exclusively for the conduct of official business in the performance of this TO. The Government will not be responsible for charges for unofficial business long distance telephone calls made or accepted by Contractor personnel. The installation, maintenance, repair, and removal of Government furnished communications and associated instruments will be the responsibility of the Government. Telephone service will be subject to the standard monitoring requirements of the Government telephone network. The two types of property used in the performance of this TO are GFP and TADSS as defined in Section 2 Definitions. The Contractor shall notify the COR whenever property becomes unserviceable or uneconomically repairable. The Government will provide disposition instructions for turn in. � The Government will provide one day per week office custodial services to include vacuuming, sweep floors, clean water fountains, sinks, commodes and urinals, and mop and buff floors once monthly in TSC buildings 22041and 19031. � The Government will provide refuse collection for the TSC facilities. The Government will provide containers for disposal of recycled materials. � The Government will provide all equipment, supplies, material and other items and services necessary for copying of official reports, documents and correspondence generated in the performance of this PWS. The Contractor may purchase or charge these items under the ODC CLIN ONLY with specific approval by the Gover...
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/1e6cc745b2574f76ba44c1834e4e4d4a/view)
- Place of Performance
- Address: Fort Hood, TX 76544, USA
- Zip Code: 76544
- Country: USA
- Zip Code: 76544
- Record
- SN05887038-F 20210109/210107230120 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |