Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 30, 2020 SAM #6971
SOLICITATION NOTICE

H -- 667-21-2-505-0048 - PM for Sprinkler System - 36C256-21-AP-0603

Notice Date
12/28/2020 11:13:49 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
561621 — Security Systems Services (except Locksmiths)
 
Contracting Office
256-NETWORK CONTRACT OFFICE 16 (36C256) RIDGELAND MS 39157 USA
 
ZIP Code
39157
 
Solicitation Number
36C25621Q0276
 
Response Due
12/31/2020 1:00:00 PM
 
Archive Date
01/30/2021
 
Point of Contact
James Rasco, Contract Specialist, Phone: 318-466-4366
 
E-Mail Address
james.rasco@va.gov
(james.rasco@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
The purpose of this Amendment, 0001, is to post questions and answers received for combined synopsis/solicitation 36C25621Q0276. Question: Part a. Assessments 2a and 2b state obstruction assessment for 78 tampers on the standpipe systems. It then states sprinkler risers will be drained. Part b. Could you please confirm that the internal inspections are for 78 standpipe systems or are they for 78 sprinkler risers (wet or dry). Tampers are not part of internal investigations (which is creating confusion), the internal investigations for risers or for standpipes are where the clarification is needed. Answer: Part a: Yes, we are referring to the tamper valves located on each riser/standpipe, on each floor and wing, per NFPA 25, chapter 6, section 6.1.3 inspection requirements for common components and valves. How the technician inspects the system in order to meet the requirements of NFPA 25 is the discretion of the vendor. Part b: The sprinkler lines are fed from these risers/standpipes and the sprinkler lines opened and closed with the tamper valve. These sprinkler feed lines must be drained in order to remove the required number of sprinkler heads. Question: We are interested in this project. Can you provide the sprinkler drawings for the buildings to be inspected? Answer: The facility is 76 years old, newer outlying buildings may have existing as-builts. They are less than 20 years old. For Bldg. 1, there is a .pdf life safety layout for 1, there are no dedicated sprinkler drawings for the hospital. Question: Could you please tell me if the combined posted as solicitation number 36C25621Q0276 will be a follow-on requirement to any work performed currently or in the past, or will this be a new requirement? Answer: This is a new requirement. All other terms and conditions remain the same.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/d6ff70858e4a4f2d93e6ef606b2ce65b/view)
 
Place of Performance
Address: OVERTON BROOKS VA MC 510 E STONER AVE, Shreveport, LA 71101, USA
Zip Code: 71101
Country: USA
 
Record
SN05881112-F 20201230/201228230107 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.