SOLICITATION NOTICE
99 -- BELL CRANK
- Notice Date
- 11/18/2020 3:11:16 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
- ZIP Code
- 19111-5098
- Solicitation Number
- N0038321QF057
- Response Due
- 12/18/2020 12:00:00 AM
- Archive Date
- 01/02/2021
- Point of Contact
- Telephone: 2156975478
- E-Mail Address
-
RACHEL.SCAFURO@NAVY.MIL
(RACHEL.SCAFURO@NAVY.MIL)
- Awardee
- null
- Description
- CONTACT INFORMATION|4|n732.60|m4h|2156975478|rachel.scafuro@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|ALL ITEMS|ALL UNITS|45 DAYS OR LESS PREFERRED||||||||||||||||||||||||||| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3||| N52212.32 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORTS|SOURCE|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| This is a FMS requirement. The Small Business Administration agent at NAVSUP WSS has reviewed this requirement and determined that a set-aside recommendation was not applicable for thisprocurement. This solicitation is for made new manufacture spare parts. The Government physically does not have in its possession sufficient, accurate,or legible data to contract with other than the current source. These items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at h https://www.navsup.navy.mil/public/navsup/wss/business_opps/. Offers received which fail to provide all data required by the source approval brochure will notbe considered for award under this solicitation. For information or questions regarding this notice, please contact Rachel Scafuro via email at rachel.scafuro@navy.mil. NAVSUP WSS requests proposals submitted in response to this solicitation remainvalid for a minimum of 120 days following submission. All contractual documents (i.e. contracts, purchase orders, task orders, and modifications) related to the instant procurement are considered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual documents as detailed herein. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;SIKORSKY; drawing number ( ;78286; ) ;70400-08102-045; , Revision ;LATEST; and all details and specifications referenced therein. 1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below. 4.1.1 Dimensional test (special) ;APPLIES; 4.1.2 Requirements of: ;NA; 4.1.3 Form: ;APPLIES; 4.1.4 Fit: ;APPLIES; 4.1.5 Function ;NA; 4.1.6 Compliance with drawing ( ;78286; ) ;70400-08102-045; , Revision ;LATEST; and specifications referenced therein. 4.2 In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements. 4.3 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing. 4.4 The cost of the Government testing effort set forth in this solicitation is estimated to be $ ;TBD; for the first article testing. This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government will require such testing. 4.5 Disposition of FAT samples 4.5.1 ;APPLIES / COUPON OF MATERIAL REQUIRED; Sample(s) shall not be returned to the contractor because they shall be destroyed during testing. 4.5.2 ; ; Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval from the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. ; ; Sample(s) shall be returned to the contractor but shall not be considered as production due. 4.6 Test Sample Coating Instructions 4.6.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative.This paragraph does NOT apply to shipping containers. 4.7 FAT Approval Criteria 4.7.1 FAR 52.209-4 applies (A) The contractors shall deliver ;2; ; unit(s) of the following CAGE ( ;78286; ; ) Part Number ;70400-08102-045; ; , Revision ;LATEST; ; within ;320; ; calendar days from the date of this contract to the Government at ;Fleet Readiness Center East/ In-Service Support Center First Article Test, FAT Mgr (Tel) 252-464-7748 Bldg. 159 Bay R4 Cunningham St./MCAS Cherry Point, NC 28533-5040; ; Marking of test sample(s) shipping container shall be as follows, citing this contract number: ""FOR FIRST ARTICLE TESTING. NOT RFI MATERIAL. DO NOT TAKE UP IN STOCK CONTRACT NUMBER:____________"" For First Article Test, the shipping documentation shall contain this contract number and lot/item identification. The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract. (B) Upon shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QAR's signature and indication of preliminary inspection shall be forwarded to the NAVICP- Philadelphia code cited in Block 10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility. The envelopes shall be clearly marked: ""DO NOT OPEN IN MAIL ROOM"". Within ;90; ; days after receipt of the samples, the test site shall complete testing/evaluation and submit two (2) copies of their test report with conclusions and recommendations to the NAVICP code cited in Block 10.a of the SF33. (C) Within ;120; ; calendar days after the Government receives the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request, shall submit an additional First Article for testing. After each request, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall furnish any additional First Article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this First Article within the time limit specified in paragraph (B) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to deliver any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract (F) Unless otherwise provided in the contract, the contractor - (1) May deliver the approved First Article as part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing: and (2) Shall remove and dispose of any First Article from the Government test facility at the contractors expense. (G) If the Government does not act within the time specified in paragraph (B) or (C) above the contracting officer shall, upon timely written request from the contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) The contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the First Article during any First Article test. (I) Before First Article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government (J) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to this effect with each First Article. (K) The contractor shall provide specific written notification to the procuring contracting officer informing him/her of the shipment of any article(s) furnished in accordance with this clause. Such notification must be addressed to the attention of the NAVICP code specified in Block 10.a of the SF33, with copies to NAVICP code 072 and to the testing activity. Failure to provide such notification shall excuse the Government from any delay in performing First Article Testing and informing the contractor of the results thereof. (L) Fourteen (14) days prior to shipment of First Article Samples, the contractor shall notify the designated test facility in writing of the anticipated shipping date, with an information copy to the PCO, NAVICP Philadelphia, Attn: (Cite code found in Block 10.a of the SF33). The contractor shall also arrange for preliminary inspection of test samples by the DCMC/QAR. 4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, the Naval Inventory Control Point reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on Waiver of First Article Approval Requirements) Within Days: Item No. _______________ Quantity:_______ After Date of Contract:__________ 4.9 Production Lot Test Requirements: The tests to be performed under the production lot sample testing provisions of the contract are as follows: 4.9.1 Workmanship Production lot samples shall be inspected to determine general workmanship. 4.9.2 Dimension check Production lot samples shall be inspected to determine compliance with applicable drawings and/or specifications. ;Applies; 4.9.3 Form: ;Applies; 4.9.4 Fit: ;N/A; 4.9.5 Function: ;N/A; 4.9.6 Requirement of: ;N/A; 4.10 In addition to the above tests, the production lot samples to be delivered hereunder shall also be subjected to those tests which will demonstrate that the samples comply with the contract requirements. 4.11 The contractor will be responsible for providing the necessary parts and repair of the production lot samples during testing. 4.12 Disposition of test samples 4.12.1 ;N/A; Samples shall not be returned to the contractor because they shall be destroyed during testing. 4.12.2 ;Applies; Unless otherwise provided for in the contract, samples shall be returned to the contractor and may be considered as production items under the contract provided the samples can be refurbished to Ready For Issue condition and provided the samples have inspection approval of the cognizant DCMC QAR. Samples may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.12.3 ;N/A; Samples shall be returned to the contractor but shall not be considered as production due. 4.13 Production Lot Test Criteria: 4.14 (A) As specified in this contract, the contractor shall test ;First Production Lot the contractor shall provide 2 samples for the Govt. QAR to Inspect. One sample will be plated, painted and assemblied, One sample will be unassemblied, unplated and unpainted. Second and subsequent Production Lots shall be one sample and these samples shall be plated, painted and assemblied. Corresive areas shall be coated with a light preservative.; selected at random by the cognizant Government Inspector (DCMC) as production lot samples. At least fourteen (14) calendar days before beginning the production lot sample tests, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so the Government may witness the tests. (B) The contractor shall submit the Production Lot Sample Test Report within 15 calendar days from the date of testing. Forward copies of the report in accordance with the distribution cited on the DD1423. Mark reports as follows: ""Production Lot Sample Test Report, Contract No. ________ Lot/item No. ____."" Within forty-five (45) calendar days after the Government receives the test report, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the production lot samples. A notice of disapproval shall cite the reasons for the disapproval. Unless expressly permitted elsewhere in this contract, the delivery of the production articles shall not be made until after notification by the Government of the approval/disapproval of the production lot samples; any production items delivered prior to the notification of the approval/ disapproval of the production lot samples shall be at the contractor's risk. (C) In the event the contractor does not receive written notification of approval or disapproval of the samples for a particular production lot within forty-five (45) days from their submission for such testing, the contract delivery schedule shall be equitably adjusted as necessary. (D) If the contractor fails to deliver the test report for any production lot samples within the time or times specified, of if the Contracting Officer disapproves any production lot samples, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract, and this contract shall be subject to termination for default. (E) In order for a production lot to be acceptable, all samples representative of the lot must pass all of the contract requirements. In the event a sample fails to pass such requirements the lot will be rejected. In such event, the Government may, at its option and at no additional cost to the Government, (I) terminate all or any portion of this contract for default, (II) require the manufacture of a new production lot, or a rework of the rejected production lot if the means and procedures proposed by the contractor for rework are acceptable to the Government, or (III) require the submission of additional samples for test. The foregoing procedures shall apply to new or reworked production lots in the same way as they did to the original production lot. (F) For each additional sample or each resubmission of a modified sample which the contractor is required to submit for approval hereunder as a result of the failure of a previous sample to conform to the requirements of the specifications, the contractor shall pay the Government the costs of reinspection, shipping, examination, and retesting by the Government, and the contractor and his sureties (if any) shall be liable for the amount of such costs. 4.15 ALTERNATE OFFERORS - Waiver of Production Lot Testing Approval Requirements Unless otherwise specified in Section E of this solicitation, the Naval Inventory Control Point reserves the right to waive the Production Lot Testing Approval Requirements specified herein for offerors who have previously furnished IDENTICAL production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of Production Lot Testing Approval Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation and (II) the production location to be used for this requirement is the same as used for the previous production run Additionally, the offeror shall submit a certification, to be executed by the officer or employee responsible for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequence of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) In the event waiver of the Production Lot Testing Approval Requirements is granted, the delivery schedule for the production units shall be one hundred and sixty-five (165) days earlier than that which is desired had the waiver not been granted. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers the government. Offeror's Alternative Proposed Delivery Schedule (Based on waiver of Production Lot Testing Approval Requirements) Within Days: Item No._____________ Quantity: _________ After Date of Contract: ____________ 4.16 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;1) Sikorsky P/N:70400-08102-(-045/-105) a) zone B 3 .625 Min b) zone C 4 .239 Min Wall c) zone D 6 1.188/1.187 Dia 1.188/1.187 Dia shall be located within .010 Dia of true position with respect to ""G"" and ""H"" d) Zone D 8 1.187/1.188 Dia 1.188/1.187 Dia shall be located within .005 Dia of true position with respect to ""F"" e) Zone C 7 Dia ""J"" shall be 1.3744/1.3739 after bonding 2 pl f) Drawing note #1 g) Drawing note #13 h) Drawing note #14 i) Drawing note #16 j) Drawing note #25 k) Drawing note #27 l) Drawing note #31 2) Sikorsky P/N:70400-08157-101 a) Zone D-6 (""B"" Dia) 1.345 +/-.002 b) Zone C-6 (""D"" Dia) 1.425 +/-.002 Dia ""D"" shall be straight within .002, Dia ""D"" shall be perpendicular to ""A"" within .005 3) Sikorsky P/N:70400-08157-106 a) Zone D 6 (""B"" Dia) 1.150 +/- .002 b) Zone C 6 (""D"" Dia) 1.240+/-.002 Dia ""D"" shall be straight within .002 Dia ""D"" shall be perpendicular to ""A"" within .005.; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submission of ;At time of first article/production lot testing or at contract completion if testing is waived. ; testing sample. ^ Block 14: Make submission to ;NADEP Cherry Point, Code: 3.3.2; . Block 13: Second submission required if the process/operation changes after approval of ;At time of first article/production lot test or at contract completion if testing is waived.; test. ^^ Block 14: Make submission to ;NADEP Cherry Point, Code: 3.3.2; . Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submission of ;at time of first article/production lot testing or at contract completion if testing is waived; testing sample. ^ Block 14: Make submission to ;NADEP Cherry Point Code: 3.3.2; . Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. Block 3: Separate reports shall be provided for the below listed subtitles and shall include certification that all vendors performing these processes are prime (OEM) approved sources. In the case where other than the OEM's specifications are to be utilized, separate certifications are required. BLOCK #5: Contract Reference: ;1. Material Certification and Analysis Documentation for: Forging P/N (78286) 70400-08102-002, or Alternate Material:4340 Steel Bar,Per AMS 6414 P/N:(78286)70400-08157-101, 17-4PH Steel, Per AMS 5643 P/N:(78286)70400-08157-106, 17-4PH Steel, Per AMS 5643 P/N:(78286)70400-08160-104, 7075 T6 Aluminum Per ASTM B209 2. Certification that the below listed source controlled items were purchased from an approved source as listed on the Sikorsky drawing; a)P/N:(78286) SB5077-101 (15860) ADW12V302, New Hampshire Ball Bearing Division (97613) KWDB12-7 Sargent Controls & Aerospace DBA KAHR Bearing Div (21335) SBSH24ATC44YA2252 Torrington Company Inc b)P/N:(78286) SB5204-105 (97613) KDJ16-92 Sargent Controls & Aerospace DBA KAHR Bearing Div (21335) FBJW32AYA2252 Torrington Company Inc. 3. Certification that the below listed Consumables were purchased from an approved source listed on the Sikorsky Parts List: a)EA 9203, EA 9309.2A, EA 9309.2B, (04343) Henkel Loctite Corp. Olean, NY 14760-1297 b)EC-1751A/B, (04963) Minnesota Mining and Mfg. St Paul MN 55144-1000 c)FM-1000-191,(07542) American Cyanamid Co. Harve De Grace MD 21708 4) Certifications that the below listed processes were performed by a Sikorsky Approved source. a) P/N:70400-08102-105: SAE AMS-H-6875 Heat Treat SAE-AMS-S-13165 Shot Peen SS 8749 Install Bearings Per SS 4012 Assembly of press fit bearings Per SS 8669 Bond Liners Per SS 8407 Bake Per SS 8813 Magnetic Particle Insp Per SS 8805 Acceptance Criteria Per SS 8640 Bond Per SS 8630 Insulation of Dissimilar Metals Per QQ-P-416 Cad Plate Per b) P/N:70400-08160-104 SS 8486 Surface Treat Per SS 8555 Paint Per c) P/N:70400-08157-101/-106 SAE AMS-H-6875 Heat Treat Per ; DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Block 6: Forward additional copy to ASO code cited in Block 10.A on page 1. 1. This Data Item Description (DID) contains the format, content and preparation instructions for the data product resulting from the work task described in paragraph 5.4.3.4 or 5.4.8.3.3 of MIL-STD-973. 2. Copies of the Request for Waiver form are available from the DODSSP, Standardization Documents Order Desk, Building 40, 700 Robbins Avenue, Philadelphia, PA 19111-5094 3. Format an Content: The request for Deviation format and content shall be in accordance with Appendix E of MIL-STD-973 DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Block 6: Forward additional copy to ASO code cited in block 10.A on page 1. 1. This Data Item Description (DID) contains the format, content, and preparation instructions for the data product resulting from the work task described in paragraph 5.4.4.4 or 5.4.8.4.3 of MIL-STD-973. 2. Copies of the Request for Waiver form are available from the DODSSP, Standardization Documents Order Desk, Building 40, 700 Robbins Avenue, Philadephila, PA 19111-5094. 3. Format and content: The Request for Waiver format and content shall be in accordance with Appendix E of MIL-STD-973.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/92d6109e748e4f7285417455868b023e/view)
- Record
- SN05856303-F 20201120/201118230146 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |