Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 05, 2020 SAM #6916
SOLICITATION NOTICE

16 -- 16--SCREWJACK ASSY

Notice Date
11/3/2020 7:10:43 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
DLA AVIATION AT PHILADELPHIA, PA PHILADELPHIA PA 19111-5098 USA
 
ZIP Code
19111-5098
 
Solicitation Number
SPRPA120RY414
 
Response Due
12/3/2020 12:00:00 AM
 
Archive Date
12/18/2020
 
Point of Contact
Telephone: 2157373747
 
E-Mail Address
MICHELLE.TOUGHILL@DLA.MIL
(MICHELLE.TOUGHILL@DLA.MIL)
 
Awardee
null
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|25 each|400 days|0001AB |DATA|I/A/W DD1423|0001AC (FAT)|AT PLANT (REPORT)|150|0001AD (PLT)|AT PLANT (REPORT)|350 ||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|TBD|TBD|TBD|TBD|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (JUN 2020)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS AFTER DATE OF FINAL DELIVERY|365 DAYS AFTER DATE OF FINAL DELIVERY||||| WARRANTY OF DATA - BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2018)(DEVIATION 2018-O0018)|5|||||MICHELLE TOUGHILL| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1,250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| Government source approval is required. Drawings and data are not available. FAT and PLT (at contractor's plant) apply. DD1423 (data requirements) apply. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;SIMMONDS PRECISION; drawing number ( ;12511; ) ;AJ105; , Revision ;J; and all details and specifications referenced therein. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. MIL-W-22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD 454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with the latest revision of MIL-STD 2000 paragraph 1.2.6 (Soldering Specification). Contractors will not be denied consideration for contract award solely because they have not been able to obtain certifications due to unavailability of class billets in authorized soldering training schools. Contractors making a good faith effort to obtain class billets to certify the necessary personnel shall be given equal opportunity to do so and to compete for contracts. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE ALL THE QUALITY ASSURANCE REQUIREMENTS AND DD1423'S ARE 'HARD COPY' AND ARE RETAINED BY THE FOLLOWING PERSONNEL: Richard Fischer N23, richard.l.fischer@navy.mil John Zacharkow N23, john.zacharkow@navy.mil 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 12: First submission to be made upon submission of ;FIRST ARTICLE/PRODUCTION LOT; testing sample. ^ Block 14: Make submission to ;PROCUREMENT CONTRACTING OFFICER (PCO) DCMA NAVSUP WSS N231; . Block 13: Second submission required if the process/operation changes after approval of ;FIRST ARTICLE/PRODUCTION LOT; test. ^^ Block 14: Make submission to ;PROCUREMENT CONTRACTING OFFICER (PCO) DCMA NAVSUP WSS N231; . DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 12: First submission to be made upon submission of ;FIRST ARTICLE/PRODUCTION LOT; testing sample. ^ Block 14: Make submission to ;PROCUREMENT CONTRACTING OFFICER (PCO) DCMA NAVSUP WSS N231; . Block 13: Second submission required if the process/operation changes after approval of ;FIRST ARTICLE/PRODUCTION LOT; test. ^^ Block 14: Make submission to ;PROCUREMENT CONTRACTING OFFICER (PCO) DCMA NAVSUP WSS N231; . DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ A REQUEST FOR VARIANCE IS REQUIRED FOR ANY DEVIATION OR WAIVER ENCOUNTERED DURING ANY PORTION OF MANUFACTURE. THIS MUST BE ROUTED TO THE ACO AND DCMA-OFFICE. THE FORM IS DD-1694 AND THE DCMA SHALL PROVIDE A FORM DD-1698.THE RFV MUST GO TO THE CONTRACTING OFFICER AT NAVSUP WSS FOR REVIEW AND THEN FORWARDED TO THE BASIC DESIGN ENGINEER FOR REVIEW AND DETERMINATION. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 12: First submission to be made upon submission of ;FIRST ARTICLE/PRODUCTION LOT; testing sample. ^ Block 14: Make submission to ;PROCUREMENT CONTRACTING OFFICER (PCO) DCMA NAVSUP WSS N231; . Block 13: Second submission required if the process/operation changes after approval of ;FIRST ARTICLE/PRODUCTION LOT; test. ^^ Block 14: Make submission to ;PROCUREMENT CONTRACTING OFFICER (PCO) DCMA NAVSUP WSS N231; . Block 12: First submission to be made upon submission of test sample./ Block 13: Subsequent submission to be made upon completion of contract. /
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/f1a18d8157c741fbba2a94bfe5b539d1/view)
 
Record
SN05844840-F 20201105/201103230141 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.