Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 19, 2020 SAM #6869
SOLICITATION NOTICE

J -- Repair Motor/Pump Service

Notice Date
9/17/2020 5:19:30 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
811310 — Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
 
Contracting Office
NAVAL UNDERSEA WARFARE CENTER KEYPORT WA 98345-7610 USA
 
ZIP Code
98345-7610
 
Solicitation Number
N0025320Q0249
 
Response Due
9/23/2020 10:00:00 AM
 
Archive Date
10/08/2020
 
Point of Contact
Louis Welter, Phone: 3603152258, Sally H. Buenaventura, Phone: 3603153339
 
E-Mail Address
louis.welter@navy.mil, sally.buenaventura@navy.mil
(louis.welter@navy.mil, sally.buenaventura@navy.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
SOW for Motor/Pump Service 1. Scope. NUWC Keyport C/22 has a requirement to operate, maintain, and manage a pressure vessel system that consists of storage tanks, piping, 40 hp motor, large volume pump (10LM12 mix flow), multi-stage centrifugal pump, drive shaft, gate valves, butterfly valves, strainer, water softener, sand filter, pressure vessel, and a control station interface. Recently, the shaft that connects the motor to the large volume pump is showing signs there is extreme wear in the system and potential imminent failure. To allow for continued use of facilities capabilities, repair and replacement in the �Motor-Drive shaft-Pump� subassembly are required to bring the system into top mechanical condition. The system must be refurbished to bring it back to original performance. If any new components are added, they must be documented with a minimum of three (3) hard copies of user/maintenance documents as well as a soft copy in PDF format. 2. Applicable documents 2.1 Verti-Line Mixed Flow Pump Technical Manual if necessary. 3. Requirements 3.1 The contractor shall: 3.1.1 Remove Aurora 10LM12 Pump/motor assembly. 3.1.2 Transport pump and motor to a repair shop (if required) 3.1.3 Rebuild the pump. 3.1.3.1 Replace bowl shaft 3.1.3.2 Replace line shaft 3.1.3.3 Replace couplings (if applicable) 3.1.3.4 Replace bearings 3.1.3.5 Rebuild mechanical seal 3.1.3.6 Balance impeller 3.1.3.7 Reassemble and paint 3.1.4 Refurbish motor 3.1.4.1 Test run and inspect motor 3.1.4.2 Megger �open stator �open rotor and surge comparison check windings (before and after cleaning) 3.1.4.3 Micrometer check bearings and seal lift �check shaft for straightness 3.1.4.4 Quote any additional parts or repairs. No additional repairs done without prior approval. 3.1.4.5 Clean Varnish, treat and bake windings 3.1.4.6 Balance rotor and bearing carrier/fan 3.1.4.7 Furnish and install bearings 3.1.4.8 Assemble, test-trim balance and VA motor N0025320Q0249 Page 4 of 48 3.1.4.9 Paint 3.1.5 Assess the drive shaft and fix or replace if necessary 3.1.6 Transport pump and motor back to NUWC Keyport 3.1.7 Reinstall Aurora 10LM12 Pump/motor assembly 3.1.8 Witness operational test the system by the operators to ensure proper operation 3.2 The contractor shall perform the required service and return the system to NUWC, Keyport within 3 week ADC. 3.3 The contractor shall provide three (3) copies of all user/service documents for any new equipment (if any) used to replace any piece of the existing system. 3.4 The contractor shall provide a maintenance plan for the system (if different from original). 3.5 In addition to the above, the contractor shall be able to lockout/tagout the motor/pump assembly. List of GFE*: Qty Name PN# 1 VERTICAL PUMP V86?70526?2 1 MULTI?STAGE CENTRIFUGAL PUMP CR16U?70U 1 HORIZONTAL END SUCTION PUMP PE 203 3 1 SUMP PUMP P17G2711P 1 STRAINER 510 1 BUTTERFLY VALVES 8,9,10,11 WD 2000 4 VALVES 6,7 ACTUATED BUTTERFLY VALVES MOV 90?1200/P 2 GATE VALVE 12"" (Bottom of Storage Tanks) UNK 1 MULIT?PORT 5?WAY CONTROL VALVE SP715 SAND 2 ACTUATOR FOR V?8,9,10,11 D853005 1 GATE VALVE, 2"" Unk 1 IBBM GATE VALVE F?617?0 2 GATE VALVE; 2"" B?103 * Note: not all of the listed parts will likely be in the hands of the contractor. The system is complex and inspection may turn up unknown issues. The vertical pump is the major focus of this contract. Not all of the pieces have a known part number.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/7408b1a10d70490f9e96fbf758e37277/view)
 
Place of Performance
Address: Keyport, WA 98345, USA
Zip Code: 98345
Country: USA
 
Record
SN05801548-F 20200919/200917230211 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.