Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 11, 2020 SAM #6861
SOLICITATION NOTICE

63 -- 63--Access Control Security Support Woods Hole MA

Notice Date
9/9/2020 8:19:33 AM
 
Notice Type
Solicitation
 
NAICS
561621 — Security Systems Services (except Locksmiths)
 
Contracting Office
OFC OF ACQUSITION GRANTS-NATIONAL RESTON VA 20192 USA
 
ZIP Code
20192
 
Solicitation Number
140G0120Q0261
 
Response Due
9/21/2020 12:00:00 AM
 
Archive Date
10/06/2020
 
Point of Contact
Jones, Lane
 
E-Mail Address
lanejones@usgs.gov
(lanejones@usgs.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Amendment 1 of 1. The purpose of this amendment is to clarify the requirement, to answer relevant questions, and to include Attachment 3. Map Incl. Building Names. Clarification: Requirement is to provide support services to a legacy physical access control system installed approx. 17 years ago. The USGS does not own the structures that it occupies. Due to circumstances beyond USGS' control, and to the best of USGS' knowledge, no schematics, wiring diagrams or similarly detailed descriptions for these facilities exist; therefore, none can be provided. Question #1. Are ceilings suspended or hard-lid? Ans.#1. Suspended & hard lid at the Marine Operations Facility (warehouse), wall to ceiling in Gundersen Annex* w/ limited access to run cables. Emory* bldg. has a hard lid ceiling. *Note: Attachment 3. provides a map associating names to the Quissett Campus' buildings. Question #2. Are there existing cable trays for wiring above ceilings? Ans.#2. No. Question #3. Is an Uninterruptable Power Supply (UPS) required/installed? Ans. #3. The controllers rely on battery back-up; quarterly maintenance (battery change) required. Question #4. Is ""plenum wire"" acceptable? Ans. #4. All network devices are/shall be connected using at least CAT6A. Question #5. At what height are the exterior cameras installed? Ans. #5. There are multiple exterior cameras; estimate on the tallest is ~40-50ft. Question #6. Are there current plans to install more equipment, upgrade, etc.? Would an awardee have a list of deferred/new tasks to accomplish? Ans. #6. ""No"", and ""Not at the moment"", respectively. ***End of Amendment 1.*
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/854ae60eef734863b0211eadae7c97d4/view)
 
Record
SN05791893-F 20200911/200909230148 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.