Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 22, 2020 SAM #6841
SOURCES SOUGHT

N -- Utiltiy Meter Replacement

Notice Date
8/20/2020 8:34:46 AM
 
Notice Type
Sources Sought
 
NAICS
334514 — Totalizing Fluid Meter and Counting Device Manufacturing
 
Contracting Office
FA4497 436 CONS LGC DOVER AFB DE 19902-5639 USA
 
ZIP Code
19902-5639
 
Solicitation Number
436Utilitymeters
 
Response Due
9/4/2020 7:00:00 AM
 
Archive Date
09/19/2020
 
Point of Contact
Nyron Cameron, Fax: 302-677-5105, Lauren Reed-Smart, Fax: 302-677-2907
 
E-Mail Address
nyron.cameron@us.af.mil, lauren.reed-smart@us.af.mil
(nyron.cameron@us.af.mil, lauren.reed-smart@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The Contractor shall provide all labor, materials, tools, and equipment necessary to provide and install new electric, water and natural gas to the building listed in Attachment 1 to Automated Meter Reading Software (AMRS). Gas Meters : Gas Meters- All new gas meters shall be replaced one for one and be capable of delivering consumption data into the AMRS. The new meters shall be scaled accurately by the contractor and meet UFGS 32 51 13.00 30 and meet the requirements of gas meters specified in the Air Force Meter Data Management Plan. �Compatible Gas Meter Specifications � AMRS compatible gas metering solutions consist of a componential system to achieve the goal of delivering gas consumption data into the AMRS. To accurately scale output pulses the contractor shall obtain building gas usage from base personnel, taking into account peak demand when sizing the components that are necessary as well as determining peak pulse rate as to not saturate the receiving device and risk losing captured pulse data. The various components that may be necessary include but are not limited to the following: Gas Meter, Pulse Kit, High Speed Dividing Pulse Relay, Surge Suppression Device, Accumulator, Electric Meter with digital input availability. � Pulse kit must be able to produce a two-wire (Form A) pulse output via RS485 Pulse output shall be delivered to a high speed dividing pulse relay that has the capability of producing a wetting voltage if necessary High speed dividing pulse relay shall provide isolated pulse outputs (Form A) that shall be delivered to an AMRS compatible electric meter Gas meters that can communicate to AMRS via the Modbus/TCP protocol may be acceptable if they can pass technical and cybersecurity evaluations directed by the AMRS PMO. At this time there are no tested or approved Modbus /TCP gas meters Electric Meters : Electric Meters � All new water meters shall be replaced one for one and be capable of delivering consumption data into the AMRS. The new meters shall be scaled accurately by the contractor and meet UFGS 26 27 14.00 20 and meet the requirements of electric meters specified in the Air Force Meter Data Management Plan.� Electri Meters Specification : The following list of meters were evaluated, meet the AMRS meter specification and shall function within the AMRS platform.� All networked devices, their integrated firmware and software will be approved by the Project Manager Office for use in the AMRS.� PMO approval is contingent upon the device, in its fielded configuration, passing USAF cyber and AMRS compatibility testing. Schneider Electric ION8600 Schneider Electric PM8000 Electro Industries Nexus 1272 Electro Industries Nexus 1262 Schneider Electric PM5560 Schneider Electric PM800 with PM8ECC network card Water Meters: Water Meters � All new water meters shall be replaced one for one and be capable of delivering consumption data into the AMRS. The new meters shall be scaled accurately by the contractor and meet UFGS 33 11 00 and meet the requirements of water meters specified in the Air Force Meter Data Management Plan Compatible Water Meter Specifications AMRS compatible water metering solutions consist of a componential system to achieve the goal of delivering water consumption data into the AMRS. To accurately scale output pulses the contractor shall obtain building water usage from base personnel, taking into account peak demand when sizing the components that are necessary as well as determining peak pulse rate as to not saturate the receiving device and risk losing captured pulse data. The various components that may be necessary include but are not limited to the following: Water Meter, Pulse Kit, High Speed Dividing Pulse Relay, Surge Suppression Device, Accumulator, Electric Meter with digital input availability. � Pulse kit must be able to produce a two-wire (Form A) pulse output via RS485 Pulse output shall be delivered to a high speed dividing pulse relay that has the capability of producing a wetting voltage if necessary High speed dividing pulse relay shall provide isolated pulse outputs (Form A) that shall be delivered to an AMRS compatible electric meter Water meters that can communicate to AMRS via the Modbus/TCP protocol may be acceptable if they can pass technical and cybersecurity evaluations directed by the AMRS PMO. At this time there are no tested or approved Modbus /TCP water meters �����������
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/2f6c7c59010b4db1a468db45f91a6ca1/view)
 
Place of Performance
Address: Dover AFB, DE 19902, USA
Zip Code: 19902
Country: USA
 
Record
SN05768234-F 20200822/200820230159 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.