Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 17, 2020 SAM #6805
SOURCES SOUGHT

99 -- Hydro-processing and Distillation Opportunity

Notice Date
7/15/2020 9:49:54 AM
 
Notice Type
Sources Sought
 
NAICS
541380 — Testing Laboratories
 
Contracting Office
PNNL CONTRACTS - DOE CONTRACTOR Richland WA 99352 USA
 
ZIP Code
99352
 
Solicitation Number
574700-RFI
 
Response Due
12/31/2020 5:00:00 PM
 
Archive Date
06/30/2021
 
Point of Contact
Laurie Martin, Phone: (509) 372-4071
 
E-Mail Address
laurie.martin@pnnl.gov
(laurie.martin@pnnl.gov)
 
Description
Hydro-processing and Distillation Opportunity Request for Information Description: �Pacific Northwest National Laboratory (PNNL) is currently developing a method for hydro-processing. Upon completion of the process development phase (approximately January 2021), there will be need for a facility that can produce scaled-up quantities of the hydrotreated and fractionated products.� PNNL will provide the feed and potentially the appropriate catalyst.� The processing ranges listed below are approximate and will be finalized in the resultant solicitation package, which is expected to be issued towards the end of Government Fiscal Year 2020.� � The purpose of this RFI is to find entities with facilities and resources experienced and capable of hydro-processing one batch of liquid feed (~200 to 300-gallons) with about 10 � 20 wt% oxygen (dry basis) and less than 5 wt% H2O using sulfided catalysts in a continuous flow system. �The expected operating temperatures and pressures are between 385 � 420 C and 1200 � 2000 psig of H2 for the hydro-processing. The feed will consist of 10-30% pyrolytic lignin and 70-90% used cooking oil and the expected product will be a mixture of hydrocarbons, some water (as oxygen-removal mechanism) and gases.�� Approximate LHSV range is 0.065 � 0.075/h. Following the hydro-processing, the hydrocarbon product is to be distilled to maximize the cut that falls into the jet boiling point range (approximately 150-250C).� PNNL anticipates the fully funded scale-up work scope will have a duration of about 9 months starting around January of 2021. Please provide your company�s business and/or technical contact information if your organization is willing and capable to perform this work scope, and interested in receiving the solicitation package.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/028b6f90ce17456fbb86994283afbd77/view)
 
Record
SN05722699-F 20200717/200715230153 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.