Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 25, 2020 SAM #6783
SOLICITATION NOTICE

J -- Eaton Rectifier Upgrade Spangdahlem Bldg 24

Notice Date
6/23/2020 7:51:11 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
FA5606 52 CONS DA LGC APO AE 09126-3910 USA
 
ZIP Code
09126-3910
 
Solicitation Number
FA5606-20-Q-2019
 
Response Due
7/7/2020 5:00:00 AM
 
Archive Date
07/22/2020
 
Point of Contact
Stephen L. Ortiz-Gonzalez, Phone: +49-6565-61-9516, Bryan Driscoll, Phone: +49-6565-61-9596
 
E-Mail Address
stephen.ortiz-gonzalez@us.af.mil, bryan.driscoll.3@us.af.mil
(stephen.ortiz-gonzalez@us.af.mil, bryan.driscoll.3@us.af.mil)
 
Description
The contractor shall provide all services and supplies necessary to provide and install EATON Rectifier Equipment for the 52nd Communications Squadron in accordance with the attached statement of work to prevent failure of the UPS in Bldg 24 Spangdahlem AB. Provides for the repair and replacement of the current degraded system. The Following EATON System components are required to be installed and configured as part of this project: Eaton products are required to prevent the costs of retraining and time spent training airmen that a new system would require. - Cabinet System IES-SYS-1395-VA - One DC Power cabinet 600x600x2200mm with max 80KW 48V DC Power, with external battery backup. - One AC 230VAC Power Cabinet 600x600x2200mm with max 28KVA AC Power 230V. - One AC 110VAC Power Cabinet 600x600x2200mm with 2x 12KVA Output power. - External Battery replacement of existing system with variant a) 4x750Ah in existing frame or b) 4x 1010AH in new battery frame. - New AC sub- distribution for the new power cabinets with higher input current. - Monitoring of alarms via existing alarm system (upgrade to new cabinets alarm system). Refer to ""Attachment 3 Statement of Work 4 June 2020"" for all material solicitation requirements in further detail and installation specifics. FOB Destination only : Spangdahlem, AB Germany Bldg 24. Inspection and Acceptance will be conducted by the 52nd Communications Squadron. Delivery and Installation to be completed NLT 120 Days after award.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/f87c3664f1e34db08e0ccd6378a53429/view)
 
Place of Performance
Address: Spangdahlem 09126, DEU
Zip Code: 09126
Country: DEU
 
Record
SN05699842-F 20200625/200623230140 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.