Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 21, 2020 SAM #6779
SOLICITATION NOTICE

Z -- 630-17-101/630-16-101 REPLACE (COOLING TOWERS) AND REPLACE CHILLERS PHASE II

Notice Date
6/19/2020 10:34:48 AM
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24220R0115
 
Response Due
7/22/2020 11:00:00 AM
 
Archive Date
10/29/2020
 
Point of Contact
Sharon Pierce, Contracting Officer, Phone: (718) 741-4350
 
E-Mail Address
Sharon.Pierce@va.gov
(Sharon.Pierce@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
Replace Cooling Towers 630-17-101 and Replace Chillers 630-16-101 SCOPE OF WORK, Replace Cooling Towers, 630-17-101 Perform selective demolition of existing Cooling Towers and piping to permit removal of Cooling Towers from roofs of buildings. Perform selective electrical system demolition of power distribution to Cooling Tower equipment indicated on contract documents. Supply and install new steel dunnage, cooling towers, piping, valves, outdoor lighting and electrical equipment as specified on the drawings and specifications. Contractor shall provide all labor, material, equipment, and supervision to perform all work at the VA Medical Center, in accordance with attached specifications, drawings, and guides. SCOPE OF WORK, Replace Chillers, Phase II, 630-16-101 Perform selective demolition of building to permit rigging of chillers out of and into building. Perform selective mechanical system demolition of Chiller Plant equipment, including chillers, pumps, piping, valves, and controls as indicated on contract documents. Perform selective electrical system demolition of power distribution to Chiller Plant equipment including chillers, pumps, and other electrical systems indicated on contract documents. Supply and install new concrete pads, centrifugal chillers, piping, valves and electrical equipment as specified on the drawings and specifications. Contractor shall provide all labor, material, equipment, and supervision to perform all work at the VA Medical Center, in accordance with attached specifications, drawings, and guides. The two projects are very technical and intertwined. The chillers and cooling towers need to function together and in sequence. Both projects are needed to work together for the Hospital. The individual projects are being solicited under one combined Contract.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/8bdf6019b6474e828a04e931e67c3017/view)
 
Place of Performance
Address: New York Harbor Healthcare System Manhattan Campus 423 E. 23rd Street New York, NY 10010-5011
Zip Code: 10010-5011
 
Record
SN05697066-F 20200621/200622142804 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.