Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 20, 2020 SAM #6778
SOLICITATION NOTICE

45 -- Automated Plumbing Fixtures

Notice Date
6/18/2020 7:04:28 AM
 
Notice Type
Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
W07V ENDIST ST PAUL SAINT PAUL MN 55101-1678 USA
 
ZIP Code
55101-1678
 
Solicitation Number
W912ES20T0074
 
Response Due
7/13/2020 8:00:00 AM
 
Archive Date
07/28/2020
 
Point of Contact
Terry Zenker, Phone: 6512905407, Kenneth J. Eshom, Phone: 6512905291
 
E-Mail Address
terry.g.zenker@usace.army.mil, kenneth.j.eshom@usace.army.mil
(terry.g.zenker@usace.army.mil, kenneth.j.eshom@usace.army.mil)
 
Description
The U.S. Army Corps of Engineers �St. Paul District requires purchase and installation of: -Install Automatic flush retrofit kits on 6 urinals; and 17 commodes in all of the Districts restrooms. *Urinals require GPF �1.0; Rough-in = 11.5; spud coupling = 1.5, inlet size = 1 IPS Sensor range: 6 to 12 inches *Commodes require GPF �1.28 Rough-in = 11.5; spud coupling = 1.5, inlet size = 1 IPS Sensor range: 8 to 15 inches -Install Automatic faucets 22 total on all District sinks located in bathrooms, break and copying areas. (13 bathroom faucets and 9 break room faucets) *13 (Thirteen) Bathroom sinks shall be Mid-arc with a flow rate of 1.5GPM (Bathroom sinks are 4 ""on center) *9 (Nine) Break room/copier room sinks shall be High-arc with a flow rate of 1.5 GPM (Break room/copier room sinks are 8"" on center) (See listing below of locations and counts of each restroom/break room requirement) **No electrical will be needed as all units shall be battery operated. ***Shut off valves are located for sinks, commodes and urinals at each location Contractor shall be responsible for removal and disposal of fixtures currently in place. Work Experience: Contractor shall have a minimum of 3 years of documented experience doing same or similar work. Work will be competed in building located at: 180 5th St E, St Paul, MN 55101 (A site map of room locations will be provided at time performance.) SITE VISIT A site-visit (Not mandatory, but recommended) will be held on 30 June 2020 at 9:00 A.M. to review project and answer any additional questions. You are required to sign in at the guard desk. Please bring photo-ID. Location: U.S. Army Corps of Engineers ? St. Paul District 180 5TH STREET E, SUITE 700 (7th Floor) ST. PAUL MN 55101-1678 Contractor shall comply with all Government and USACE safety standards for personal protection and safety requirements. Water Sense The contractor shall provide Water Sense labeled products under this contract, as applicable. The contractor is encouraged to visit http://www.epa.gov/watersense for complete product specifications and updated lists of qualifying products.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/b21f5602004b470a90f5c8de185b0c7c/view)
 
Place of Performance
Address: Saint Paul, MN 55101, USA
Zip Code: 55101
Country: USA
 
Record
SN05695851-F 20200620/200618230200 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.