Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 19, 2020 SAM #6777
SOLICITATION NOTICE

Y -- Maroon Creek Trail Bridge

Notice Date
6/17/2020 10:37:37 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Rocky Mountain Regional Office LAKEWOOD CO 80401 USA
 
ZIP Code
80401
 
Solicitation Number
1282X920R0001
 
Response Due
7/2/2020 9:00:00 AM
 
Archive Date
07/17/2020
 
Point of Contact
Michael Ku
 
E-Mail Address
michael.ku@usda.gov
(michael.ku@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Amendment posted June 17, 2020 includes answers to questions asked during the pre-bid meeting held on June 16, 2020.� A revised SOW date June 17, 2020 is also posted.� The propsoal due date is extended to July 2, 2020.� All proposal material must be submitted via email to Michael.Ku@USDA.GOV.� Maximum email size allowed is 100MB.� Please do not mail any hard copy proposal materials as they will be discarded. ************************************************************************************************************** DESCRIPTION OF WORK The work shall consist of what is shown on the plans, stated in the specifications, and summarized below: � Order, fabricate, and deliver to the sites all the Prefabricated Steel Trail Bridge materials � Install traffic control signs and close the Maroon Scenic Trail and West Maroon Trail. � Install erosion control measures including any stream-flow diversion system. � Remove the existing bridges abutments as shown in the plans. � Excavate for riprap streambanks and foundation protection. � Install the geocell pads. � Install the grade beams. � Remove the stream-flow diversion system. � Place the bridges. � Place trail surface aggregate on Maroon Scenic Bridge #1 Replacement. � Remove signs and re-open Maroon Scenic and West Maroon Trails. � Final site work and cleanup. PRICE RANGE The Government's estimate is: Between $100,000 and $240,000 PRE-BID MEETING Date: Tuesday, June 16, 2020 Time: 9:00 AM-12:00 PM Location: White River National Forest Maroon Bells Welcome Station, Maroon Creek Road Pitkin County, CO 81611 Meeting Details: *The meeting will be held outdoors.� *Please maintain 6 foot social distancing at the meeting. �*Cellular phone coverage is not available at the meeting location.� We will meet at the welcome station and drive to the west maroon portal link trail parking lot at 9:00 a.m.� Forest service representative Bret Conant will conduct a project overview in the parking lot.� Next we will visit the two trail bridge replacement project sites and hold Q and A sessions at each site. �Meeting ending at 12:00 p.m., depart project area. NOTICE TO OFFEROR Proposals from this solicitation MUST and questions pertaining to this solicitation must�be marked: 1282X920R0001 and submitted via email to Michael Ku, Contracting Officer, at Michael.Ku@usda.gov.� No phone calls will be accepted.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/2cc99be72cd84400abe2c7f006c9f419/view)
 
Place of Performance
Address: Aspen, CO 81611, USA
Zip Code: 81611
Country: USA
 
Record
SN05694144-F 20200619/200617230156 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.