Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 30, 2020 SAM #6757
SOLICITATION NOTICE

Y -- Design-Build Edinburg Pump Station Levee Rehabilitation

Notice Date
5/28/2020 1:16:25 PM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
INTERNAT. BOUNDARY AND WATER COMM. El Paso TX 79902 USA
 
ZIP Code
79902
 
Solicitation Number
191BWC20R0003
 
Archive Date
09/30/2020
 
Point of Contact
Lanisa McCollum, Phone: 9158324120
 
E-Mail Address
lanisa.mccollum@ibwc.gov
(lanisa.mccollum@ibwc.gov)
 
Description
The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the design and construction (design-build) of rehabilitation improvements for the Rio Grande levee at Edinburg Pump Station in Hidalgo County, Texas.� The pump station is operated by Hidalgo County Irrigation District No. 1 (HCID1).� The proposed work is to be performed to provide flood control to the area and provide levees that meet FEMA requirements (44 CFR 65.10) and U.S. Army Corps of Engineers' Engineering Manual 1110-2-1913. The proposed project generally consists of design and construction of approximately 800 linear feet of levee improvements, including earthen embankment, concrete floodwalls, and associated ramps. The proposed levee rehabilitation design will include analysis/investigations of the existing levee for seepage remediation and raising the top of levee as needed, conducting any additional geotechnical investigations and testing required, and assessing all structures within the levee for rehabilitation. The major construction efforts include, but are not limited to, preparing right-of-way, removing/stockpiling existing excavated material, levee widening, erosion control, installing two new sections of floodwall with bollard walls, construction of floodwall foundations, completing construction of an existing gatewell structure, backfilling and grading of levee embankment material, installing aggregate roadway surface, removal and replacement of chain link fencing, and revegetation. The proposed work is located completely within the United States in the USIBWC Lower Rio Grande Flood Control Project but is directly adjacent to the international border with Mexico. The pump station is located at Pe�itas, Texas and the levee segments are located adjacent to the pump station. While proposed work will be located on USIBWC right-of-way, the Contractor would have to obtain a construction easement from HCID1. The levee is also adjacent to the Department of Homeland Security (DHS) border wall. HCID1 has constructed a portion of floodwall on the gap between their pump house and USIBWC's levee. The proposed work will require coordination with HCID1 to tie-in the design and construction to the floodwall they built. Coordination with their contractor may also be required. Design and construction would include appropriate levee tie-in to the pump house structure and account for sensitivity in working adjacent to the pump house. The proposed levee improvements at the border wall would also require incorporating DHS tactical infrastructure requirements and coordination with DHS to design and construct a bollard wall as part of the floodwalls. The magnitude of the project is estimated between $1,000,000 and $5,000,000. The work is located in Pe�itas, Hidalgo County, Texas. A site visit date will be listed in the solicitation. The work will be performed under NAICS Code 237990. The contract will be firm-fixed price. All work is proposed to be completed within nine hundred sixty (960) calendar days after the Notice to Proceed.� Four hundred fifteen (415) calendar days are allotted for Design. Three hundred sixty-five (365) calendar days are allotted for Construction. Reseeding and establishment of vegetation shall be completed within one hundred eighty (180) calendar days of completion of all other work.� The time for reseeding and establishment of vegetation is included in the nine hundred sixty (960) calendar days.� The time stated for completion shall include final cleanup of the premises. The final design and construction contract durations will be negotiated with Offerors during the Phase Two technical proposal evaluations. The Solicitation will be issued pursuant to FAR Subpart 36.3 - Two-Phase Design-Build Selection Procedures. Phase One shall include evaluation of technical qualifications and capability to perform and Phase Two shall include evaluation of technical proposal and price. The Solicitation, Scope of Work, and attachments are expected to be posted on or about June 15, 2020 (this is a target date which may slip or change). The Solicitation will be available for a minimum of thirty (30) calendar days. This is a Presolicitation Notice. The Solicitation will include information on how to obtain the Scope of Work and attachments. All responsible sources may submit a proposal to be considered by the Agency.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/a82124cc34c14cdda26792dffbbdec0c/view)
 
Place of Performance
Address: Hidalgo, TX, USA
Country: USA
 
Record
SN05673078-F 20200530/200528230159 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.