Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 30, 2020 SAM #6757
SOLICITATION NOTICE

Y -- USDA Forest Service NFsNC, Grandfather Ranger District, Caldwell County, NC has a requirement for Boone Fork Stream Enhancement

Notice Date
5/28/2020 10:53:53 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
NATIONAL FORESTS IN NORTH CAROLINA ASHEVILLE NC 28801 USA
 
ZIP Code
28801
 
Solicitation Number
12455020R0021
 
Response Due
6/15/2020 10:00:00 AM
 
Archive Date
06/30/2020
 
Point of Contact
Cynthia Roberts, Phone: 828-257-4228
 
E-Mail Address
cynthia.l.roberts@usda.gov
(cynthia.l.roberts@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
USDA Forest Service NFsNC, Grandfather Ranger District, Caldwell County, NC has a requirement for�Stream Enhancement on the� Boone Fork Stream�per attached Wage Determination, SOI, Project Description, and Specifications.��� All items on Schedule of Items must be priced to be considered for award. Construction Estimate between $25,000 and $100,000 Small Business Set-Aside Proposals due June 15, 2020�� 1:00 PM ET via e-mail to cynthia.l.roberts@usda.gov POP:� 90 Days from Notice to Proceed COR:� Gary Kauffmann�� 828-257-4861 ��gary.kauffman@usda.gov Technical questions may also be addressed to Brady Dodd��� 828-257-4214�� brady.dodd@usda.gov Contractor must have active sam.gov account at time proposals are due to be considered for award.� Sam.gov is a free website. Because of COVID-19 concerns all proposals shall be submitted via e-mail to cynthia.l.roberts@usda.gov� �You will receive a reply to acknowledge receipt of your proposal within 2 business days.� If you do not receive a reply please call Cynthia Roberts 828-257-4228.� If you are unable to e-mail proposals please contact Cynthia Roberts.� AMENDMENT #1 May 7, 2020: Also one Q&A that has been asked: 40 Foot Culverts can come as two pieces. AMENDMENT #2 May 19, 2020 To publish Change in Pre-bid meeting due to forecasted weather Pre-Bid Meeting May 27, 2020 10:00am Boone Fork Pond. Directions to Pre-bid Location: From Lenoir, NC take State Hwy 90 to SR 1368 north to Forest Service Road 2055 on the right. Drive to the end of the open road to the Boone Fork Pond parking lot on the left at GPS: 36.01031, -81.62165. Proposal date has been changed to June 15,2020 1:00pm via e-mail to Cynthia.l.roberts@usda.gov Amendment #3 May 28, 2020 Boone Fork Stream Enhancement amendment to publish: Pre-bid Site Visit sign in sheet Revised Attachment 2 SOI Revised Attachment 3 Project Description Revised Attachment 4 Specifications These revised Attachments address concern brought up during pre-bid meeting: 1.�What are the Specifications on the Ditch Relief Culverts? 2.�The skid steer will not do the job as described as well as an all-terrain dump truck. Consider replacing skid steer with an AT Dump Truck.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/6d2d6ae11bc14449ab849428aa20bd0f/view)
 
Place of Performance
Address: Nebo, NC 28761, USA
Zip Code: 28761
Country: USA
 
Record
SN05673062-F 20200530/200528230159 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.