Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 30, 2020 SAM #6757
SOLICITATION NOTICE

T -- DA Form 3444-2 Treatment Records PMS 114 (Yellow)

Notice Date
5/28/2020 2:12:30 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
323111 — Commercial Printing (except Screen and Books)
 
Contracting Office
Customer Services Washington DC 20401 USA
 
ZIP Code
20401
 
Solicitation Number
DAForm3444-2TreatmentRecordsPMS114Yellow719103(2020)
 
Response Due
6/8/2020 8:00:00 AM
 
Archive Date
06/23/2020
 
Point of Contact
Joy Gooden, Phone: 7574907942, Fax: 7574907950
 
E-Mail Address
jgooden@gpo.gov
(jgooden@gpo.gov)
 
Description
Complete specifications may be found at: https://www.gpo.gov/how-to-work-with-us/vendors/contract-opportunities. DESCRIPTION: NOTE: Box on lower right of front is a critical alignment square; align exactly between the ""R"" block and the ""S"" block when front leaf is folded; alignment after folding, on the right side must be within 1/16"" 719-103: Flood coat face of flat sheet (prior to construction) in PMS 114 (Yellow) 719-104:� Flood coat face of flat sheet (prior to construction) in PMS 464 (Brown) 719-105:� Flood coat face of flat sheet (prior to construction) in PMS 414 (Gray) 719-106:� Flood coat face of flat sheet (prior to construction) in PMS 141 (Tan) 719-107:� Flood coat face of flat sheet (prior to construction) in PMS 360 (Green) 719-108:� Flood coat face of flat sheet (prior to construction) in PMS 310 (Lt Blue) 719-110:� Flood coat face of flat sheet (prior to construction) in PMS 163 (Orange) 719-111:� Flood coat face of flat sheet (prior to construction) in PMS 182 (Pink) 719-112:� Flood coat face of flat sheet (prior to construction) in PMS 185 (Red) APPLIES TO ALL: Prints head to head in black. Box in quantities of 400.� PDF proof and one set of preproduction samples of each Jacket are required. Deliver by traceable means to St Louis, MO NOTE: only Jacket 719-109 prints only in black, all other require flood coat of face of flat sheet prior to construction, this constitutes front panel and back panel of the folder. CONSTRUCTION: one piece, folded by scoring to result in a front flap with an exposed top and right edge.� Front flap to be scored for 3/4"" expansion at intervals of either 1/4"" or 3/8"".� DIECUT to form front flap of 1/2"" narrower than the top and right edge of back flap. Back leaf to have a 1"" double-ply reinforced straight tab at the top and right side. Round corner on back flap, but not front. FASTENER: Back flap to be equipped with permanently affixed prong type, one-piece rust-resistant metal fastener, ribbed lengthwise for rigidity plus or minus 0.001"" thickness with a Rockwell Hardness F-79 to F-89 and be of such ductility that it will withstand a minimum of 20 90-degree flexing cycle without fracture when tested. Fasteners to be free from burrs, sharp edges, flaws, cracks, and malfunctions which may cause injury to personnel or damage the filed papers. A 2-prong metal fastener to be in the No 1 position. Prongs to be 2-3/4"" apart, center to center. Length of prongs to be 1-7/16 to 1-9/16"". A plus/minus tolerance of 1/16"" will be allowed. Fasteners to be permanently installed. Each flap to be die-cut and embossed so that the base of fastener will be flush on the outside of the folder with a minimum of thickness so as not to snag other folders while being removed from or inserted in files. Fastener to be secured to folder flap by means of no less than eight clinching ears of tabs.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/3948ba5df25f43b1bc7b7ef6c593d0b7/view)
 
Record
SN05673010-F 20200530/200528230158 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.