Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 25, 2020 SAM #6722
MODIFICATION

Y -- 8(a) Design-Build SATOC

Notice Date
4/23/2020 2:56:28 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT SAVANNAH SAVANNAH GA 31401-3604 USA
 
ZIP Code
31401-3604
 
Solicitation Number
W912HN19R3000
 
Response Due
4/30/2020 10:00:00 AM
 
Archive Date
08/23/2020
 
Point of Contact
Magdalena Bernard, Contracting Officer, Phone: 912-652-5131, Elizabeth Thorstad, Contract Specialist, Phone: 912-652-5161
 
E-Mail Address
Magdalena.Bernard@usace.army.mil, Elizabeth.A.Thorstad@usace.army.mil
(Magdalena.Bernard@usace.army.mil, Elizabeth.A.Thorstad@usace.army.mil)
 
Small Business Set-Aside
8A 8(a) Set-Aside (FAR 19.8)
 
Description
Amendment 06: The purpose of Amendment 0006 is to: A. CONTRACT CHANGES: 1. TECHNICAL SPECIFICATION CHANGES: a. Appendix A, Phase II Seed Task Order Project, Section 16 � Contractor Requirements, subparagraph A is changed as follows: FROM: A. ? Project Involves Handling of Asbestos or Lead Base Paint. ? Record of Survey ? REC provided TO: A. ? Project Involves Handling of Asbestos or Lead Base Paint. ? Record of Survey ? REC provided (Note: There is a potential (only) that the Project Involves Handling of Asbestos or Lead Base Paint.) b. Section 00 21 00, Appendix A, section 1, paragraph 4 is changed as follows: FROM: A site visit will be conducted on April 13, 2020 at 1:00 p.m. Bldg 6 Pierce Range, Fort Benning, GA. The POC for the site visit is John Michael Abeln and can be contacted at (706) 513-5152. Questions shall be submitted NLT, Friday, April 17, 2020 at 1:00 p.m. Local Time. All questions shall be submitted through ProjNet. TO: A site visit will be conducted on April 13, 2020 at 1:00 p.m. Bldg 6 Pierce Range, Fort Benning, GA. The POC for the site visit is John Michael Abeln and can be contacted at (706) 513-5152. Questions shall be submitted NLT, Monday, April 27, 2020 at 1:00 p.m. Local Time. All questions shall be submitted through ProjNet. B. CONTRACT DRAWINGS: The following drawing (Attachments 12-24) clarifications are hereby incorporated into and made a part of the solicitation: a. Young Range Drawing clarifications: i. Attachments 12-22 are Young Range drawings and are renamed to add �Young Range� to the file names as follows: 1. Attachment 12, Young Range Control Tower, Small Arms, 44047-E1, 19R3000 2. Attachment 13, Young Range Control Tower, Small Arms, 44047-E2, 19R3000 3. Attachment 14, Young Range Control Tower, Small Arms, 44047-E3, 19R3000 4. Attachment 15, Young Range Control Tower, Small Arms, 44047-E4, 19R3000 5. Attachment 16, Young Range Control Tower, Small Arms, 44047-E5, 19R3000 6. Attachment 17, Young Range Control Tower, Small Arms, 44047-E6, 19R3000 7. Attachment 18, Young Range Control Tower, Small Arms, 44047-E7, 19R3000 8. Attachment 19, Young Range Control Tower, Small Arms, 44047-E8, 19R3000 9. Attachment 20, Young Range, Ar OSUT 5, Control Tower MTL Arch Dwgs, 19R3000 10. Attachment 21, Young Range Control Tower, Small Arms, ST-M2, 19R3000 11. Attachment 22, Young Range, Mtl Tower, Structural & Shop Drawings, 19R3000 ii. All Young Range drawings are provided for reference only b. Pierce Range Drawing/Topo clarifications: i. Attachment 24 is a Pierce Range drawing and is renamed to add �Pierce Range� to the file name as follows: 1. Attachment 24, Pierce Range, 2014_Aerial_Photo_LIDAR_Topo_Info, 19R3000 ii. All Pierce Range drawings and topo are provided for reference only All other terms and conditions remain unchanged. Amendment 05: A. CONTRACT CHANGES: 1. The following Seed Project pre-bid site visit documents (Attachments 10-11) are hereby added into and made a part of the solicitation. a. Attachment 10, Pierce Range, Site Visit, Attendee Roster, 19R3000 b. Attachment 11, Pierce Range, Site Visit, Memorandum for Record, 19R3000 2. TECHNICAL SPECIFICATION CHANGES: Section V, Section 00 21 00 Proposal Submission Requirements and Instructions Volume II-Technical Requirements changes are hereby added into and made a part of the solicitation as follows: From: 9. PHASE TWO � TAB D � FACTOR 3 � TECHNICAL APPROACH 9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a proposal for the sample/seed project utilizing R.S. Means Cost Works. 9.2. EVALUATION CRITERIA: 9.2.1. Offerors will be evaluated on the technical approach in utilizing the applicable Construction Specification Institute (CSI) numbers and appropriate quantities from R.S. Means. To: 9. PHASE TWO � TAB D � FACTOR 3 � TECHNICAL APPROACH 9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a quantitative proposal for the sample/seed project utilizing R.S. Means Cost Works. Offerors final proposed price will be submitted on Cost Breakdown Schedule D and offeror shall provide ALL supporting documents (R.S. Means break out, non-priced items, etc.). Offeror�s proposal shall be prepared and meet the requirements as stated in Notes To Offeror. 9.1.1. Offerors shall apply their proposed Area Coefficient for Fort Benning and their proposed Home Office Overhead for the base period to the SEED project 9.2. EVALUATION CRITERIA: 9.2.1. Offerors will be evaluated on the technical approach in determining a price proposal utilizing the applicable Construction Specification Institute (CSI) numbers and appropriate quantities from R.S. Means. Offerors will also be evaluated on how well they understand the required application of the proposed coefficient and mark-ups. 9.2.2 The Government will evaluate strengths, weaknesses and any deficiencies in the submission. Based on the submission provided, the Government will evaluate the Offeror�s overall quantitative approach for logic and reasonableness. The Offeror will also be evaluated on how well defined, clear and well supported the approach is for the SEED project. B. TECHNICAL SPECIFICATION CHANGES: Section 00 21 00 � Instructions, Additional Notes to Offerors, Appendix A, Section 19 Technical Requirements changes are incorporated into and made a part of the solicitation as follows: From: A. Attachments 1-9 To: A. Attachments 1-24 C. CONTRACT DRAWINGS: The following drawings (Attachments 12-22) are hereby incorporated into and made a part of the solicitation: a. Attachment 12, Range Control Tower, Small Arms, 44047-E1, 19R3000 b. Attachment 13, Range Control Tower, Small Arms, 44047-E2, 19R3000 c. Attachment 14, Range Control Tower, Small Arms, 44047-E3, 19R3000 d. Attachment 15, Range Control Tower, Small Arms, 44047-E4, 19R3000 e. Attachment 16, Range Control Tower, Small Arms, 44047-E5, 19R3000 f. Attachment 17, Range Control Tower, Small Arms, 44047-E6, 19R3000 g. Attachment 18, Range Control Tower, Small Arms, 44047-E7, 19R3000 h. Attachment 19, Range Control Tower, Small Arms, 44047-E8, 19R3000 i. Attachment 20, Ar OSUT 5, Control Tower MTL Arch Dwgs, 19R3000 j. Attachment 21, Range Control Tower, Small Arms, ST-M2, 19R3000 k. Attachment 22, Mtl Tower, Structural & Shop Drawings, 19R3000 l. Attachment 23, Pierce Range Ammo Issue Point, 19R3000 m. Attachment 24, 2014_Aerial_Photo_LIDAR_Topo_Info, 19R3000 Amendment 04: A. CONTRACT CHANGES: 1. FAR Provision 52.228-1 is hereby replaced in its entirety. 2. TECHNICAL SPECIFICATION CHANGES: Appendix A, Seed Task Order Project technical specifications are changed as follows: a. Schedule B, Seed Task Order Project Capacity/Coefficient Schedule, is hereby removed in its entirety b. Attachment 1, Technical SOW, Pierce Range Improvements, Seed Project, 19R3000 is removed from the main body of the seed project Task Order document and is included as a separate attachment. c. Attachment 8, Pierce Range Site Visit Map, 19R3000 is hereby added to and made a part of the solicitation. d. Attachment 9, GA SAS KTR Shelter In Place Exemption Memo_6APR20, 19R3000 is hereby added to and made a part of the solicitation. 3. Appendix A, Seed Task Order Pre-bid site visit location is changed From: Bldg 6, Fort Benning, GA To: Pierce Range, Fort Benning, GA 4. Appendix A, Seed Task Order, �After Task Order Award� section is replaced in its entirety B. TECHNICAL SPECIFICATION CHANGES: Specification 01 33 16 � Design After Award is hereby added to and made a part of Appendix A, Seed Project, number 18. � Amendment 03-Phase II Only those in the competitive range and selected for Phase II may submit a proposal.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/1250a799f77e4c1b9a0a95f2dadc9de3/view)
 
Place of Performance
Address: +, Savannah, GA, USA
Country: USA
 
Record
SN05633173-F 20200425/200423230148 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.