Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 24, 2020 SAM #6721
MODIFICATION

Y -- UT FTFW OURA 11(1), Auto Tour Route

Notice Date
4/22/2020 8:11:43 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF20B000010
 
Response Due
5/28/2020 11:00:00 AM
 
Archive Date
06/12/2020
 
Point of Contact
Eric Grosskreuz, Sheri Walsh
 
E-Mail Address
cflcontracts@dot.gov, CFLContracts@dot.gov
(cflcontracts@dot.gov, CFLContracts@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS IS AN INVITATION FOR BID, PLANS AND SPECS ARE AVAILABLE AT THIS TIME. Ouray National Wildlife Refuge is managed as part of the Lower Green River Complex as a sanctuary for migratory birds, threatened and endangered species, and species of special concern. The Auto Tour Route (RTE 011) is a 4.7 mile loop road that provides access to the southwest portion of the refuge which primarily consists of riparian, wetland, and grassland habitat.� During periods of high flows in the Green River, primarily during peak spring runoff, large portions of the southern segment of the roadway inundates with flood water, requiring a full road closure.� The purpose of the project is to improve access to this portion of the refuge by providing turn around locations that allow the east and west segments of the Auto Tour Route (RTE 011) to remain open during periods of high flows.� The project also improves safety and provides for longer term access at one location by shifting the roadway alignment away from an area of river bank erosion.������� The project consists of roadway rehabilitation and aggregate surface course resurfacing of approximately 1.64 miles of the northwest segment and 1.51 miles of the northeast segment of the Auto Tour Route (RTE 011) and 0.04 miles of an adjacent Fishing Access spur.� The northeast segment also includes 982 feet of roadway realignment away from an area of embankment instability along the Green River bank and realignment of the intersection at the Refuge Entrance Road to a standard �T� intersection.� The project also includes installation of new gates, bollards, and signs.�� SIGNIFICANT QUANTITIES (Schedule A): 3.3 Miles Surface Reconditioning 1,250 CUYD of Embankment Construction,� 5,900 Ton of Aggregate Surface Course, ESTIMATED DOLLAR AMOUNT INCLUDING OPTIONS: $250,000 to $750,000 CONSTRUCTION DURATION:� September 2020 to November 2020 MISCELLANEOUS: ���Western Yellow Billed Cuckoo nesting prohibits construction operations between June 15 and August 31.����� Due to potential spring flooding and environmental restrictions, on-site construction cannot occur until September 1, 2020
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/4d1753e1be0245dd9e0b90d20bba987f/view)
 
Place of Performance
Address: UT 84026, USA
Zip Code: 84026
Country: USA
 
Record
SN05631774-F 20200424/200422230132 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.