Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 16, 2020 SAM #6713
SOURCES SOUGHT

Y -- AZ FTFS 104(1) Mingus Mountain

Notice Date
4/14/2020 2:51:17 PM
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF20SS0014
 
Response Due
4/29/2020 1:00:00 PM
 
Archive Date
05/14/2020
 
Point of Contact
Craig Holsopple, Phone: 7209633350, Fax: 7209633360
 
E-Mail Address
craig.holsopple@dot.gov
(craig.holsopple@dot.gov)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT� INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:� Craig Holsopple) for receipt by close of business (2 p.m. local Denver time) on April 29, 2020:� (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program.� In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration).� This information must be provided in order to determine eligibility � DO NOT SEND COPIES OF YOUR SAM PROFILE; (3) Letter from bonding agent stating your firm�s capability to bond for a single project of $1�million, and your firm�s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope the AZ FTFS 104(1) Mingus Mountain project in which you performed (as the prime contractor) roadway work including asphalt concrete pavement and�aggregate base.� State whether your firm was the prime contractor or subcontractor on the project.� DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc.� Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.� All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs.� This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs.� A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS:�AZ FTFS 104(1) Mingus Mountain The AZ FTFS 104(1) Mingus Mountain project consists of approximately 2.5 miles of roadway work leading to Mingus Mountain Recreation Area within the Prescott National Forest in Yavapai County, Arizona. The work consists of paving approximately 1.5 miles and gravel import and reconditioning of 1 mile. SIGNIFICANT QUANTITIES: 2,400 tons of asphalt concrete pavement, 9,000 tons of aggregate base. MISCELLANEOUS:� Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to the recreation area visitors throughout construction and achieve customer satisfaction.� The anticipated advertisement date is June 2020 with construction anticipated from October 2020 to December 2020. �Estimated total cost for the project including options is $400,000 to $1,000,000.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/c6a3011bf6544615b028d7b848e0a3ef/view)
 
Place of Performance
Address: AZ 86326, USA
Zip Code: 86326
Country: USA
 
Record
SN05621163-F 20200416/200414230158 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.