Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 02, 2020 SAM #6699
SOLICITATION NOTICE

Y -- SOLICITATION N40085-20-R-0069, DD2 PORTAL CRANE AND TUNNEL REPAIRS, KITTERY MAINE

Notice Date
3/31/2020 5:57:47 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
NAVAL FAC ENGINEERING CMD MID LANT NORFOLK VA 23511-0395 USA
 
ZIP Code
23511-0395
 
Solicitation Number
N4008520R0069a
 
Response Due
4/17/2020 11:00:00 AM
 
Archive Date
12/30/2020
 
Point of Contact
Elizabeth Carmack, Phone: 7573411654, Philip Cole, Phone: 7573411970
 
E-Mail Address
elizabeth.carmack@navy.mil, philip.j.cole@navy.mil
(elizabeth.carmack@navy.mil, philip.j.cole@navy.mil)
 
Description
These projects provide various infrastructure upgrades to the dry dock #2 area at Portsmouth Naval Shipyard (PNS) to increase the function and reliability of the ground level portal crane rails and adjacent facilities. The proposed upgrades are divided into two separate projects that will be awarded together: Dry Dock 2 Portal Crane Rail Repairs, and Dry Dock 2 Tunnel Repairs. (Pre-solicitation published under N40085 20 R 0027 - this number is NO LONGER VALID for the solicitation) The Dry Dock #2 Portal Crane Rail Repair upgrades will increase the capacity of the ground level portal crane rails at the North and East sides of Dry Dock #2. Major work elements include: demolition of existing crane rails, baseplates, hardware, footings, beams, and pile caps; installation of micro piles; installation of reinforced concrete pile caps, beams, and footings; installation of crane rail, baseplates, and hardware; site grading, drainage improvements, and pavement restoration within the project limits. The Dry Dock #2 Tunnel Repair upgrades will demolish and reconstruct the personnel access tunnel at the east side of Dry Dock 2, including integral and adjacent ground level portal crane rails and footings. Major work elements include; temporary re-routing of electrical, communication, and mechanical utilities; selective demolition of reinforced concrete personnel access tunnel, and crane rail footings; rock excavation; installation of new cast-in-place reinforced concrete personnel access tunnel with integral crane rails and adjacent crane rail footings; reconstruction of drainage, electrical, and mechanical utilities; site grading and paving.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/4212a11b07c244889cd31dd702437e6b/view)
 
Place of Performance
Address: Kittery, ME, USA
Country: USA
 
Record
SN05605720-F 20200402/200331230148 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.