MODIFICATION
Y -- PRESOLICITATION NOTE - Design-Bid-Build (Dbb), Dry Dock 2, Portal Crane Rail And Tunnel Repairs located at Portsmouth Naval Shipyard in Kittery, ME.
- Notice Date
- 3/3/2020 6:23:28 AM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- NAVAL FAC ENGINEERING CMD MID LANT NORFOLK VA 23511-0395 USA
- ZIP Code
- 23511-0395
- Solicitation Number
- N4008520R0069
- Response Due
- 4/7/2020 11:00:00 AM
- Archive Date
- 12/30/2020
- Point of Contact
- Elizabeth Carmack, Phone: 7573411654, Philip Cole, Phone: 7573411970
- E-Mail Address
-
elizabeth.carmack@navy.mil, philip.j.cole@navy.mil
(elizabeth.carmack@navy.mil, philip.j.cole@navy.mil)
- Description
- SOLICITATION N40085-20-R-0069, DESIGN-BID-BUILD (DBB), DRY DOCK 2, PORTAL CRANE RAIL AND TUNNEL REPAIRS, PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE. This acquisition will result in the award of a Firm-Fixed Price (FFP) contract for Design-Bid-Build (DBB) Construction Services.���������� �These projects provide various infrastructure upgrades to the dry dock #2 area at Portsmouth Naval Shipyard (PNS) to increase the function and reliability of the ground level portal crane rails and adjacent facilities. The proposed upgrades are divided into two separate projects that will be awarded together: Dry Dock 2 Portal Crane Rail Repairs, and Dry Dock 2 Tunnel Repairs. The Dry Dock #2 Portal Crane Rail Repair upgrades will increase the capacity of the ground level portal crane rails at the North and East sides of Dry Dock #2. Major work elements include: demolition of existing crane rails, baseplates, hardware, footings, beams, and pile caps; installation of micro piles; installation of reinforced concrete pile caps, beams, and footings; installation of crane rail, baseplates, and hardware; site grading, drainage improvements, and pavement restoration within the project limits. The Dry Dock #2 Tunnel Repair upgrades will demolish and reconstruct the personnel access tunnel at the east side of Dry Dock 2, including integral and adjacent ground level portal crane rails and footings. Major work elements include; temporary re-routing of electrical, communication, and mechanical utilities; selective demolition of reinforced concrete personnel access tunnel, and crane rail footings; rock excavation; installation of new cast-in-place reinforced concrete personnel access tunnel with integral crane rails and adjacent crane rail footings; reconstruction of drainage, electrical, and mechanical utilities; site grading and paving. �RFP and ALL ATTACHMENTS� INCLUDED IN THIS NOTICE (Drawings, specs, solicitation and all attachments, reference drawings files 1-13)��
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/f1c1b89568694521a8df9a50118cebd6/view)
- Place of Performance
- Address: Kittery, ME, USA
- Country: USA
- Country: USA
- Record
- SN05577884-F 20200305/200304221134 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |