Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 27, 2020 SAM #6664
SPECIAL NOTICE

Y -- MVD Levee Requirements for FY20 and FY21

Notice Date
2/25/2020 8:09:34 AM
 
Notice Type
Special Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W07V ENDIST VICKSBURG VICKSBURG MS 39183 USA
 
ZIP Code
39183
 
Solicitation Number
W912MVD200002
 
Response Due
9/30/2020 3:00:00 PM
 
Archive Date
10/15/2020
 
Point of Contact
Gabe Harris, Allison Hudson
 
E-Mail Address
Gabe.Harris@usace.army.mil, Allison.B.Hudson@usace.army.mil
(Gabe.Harris@usace.army.mil, Allison.B.Hudson@usace.army.mil)
 
Description
The intent of this special notice is to share the most current information available with respect to anticipated levee work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts during fiscal years 2020 and 2021. NOTE: This information includes projected requirements and schedules that are subject to change. All project information is subject to change as designs are refined and impacts are quantified. Principle features of work include construction of various types of earthen levee embankment enlargement and repair, seepage berm construction, seepage cut-off construction, and/or installation of relief wells.� This work will be performed primarily along the Mississippi River levee system within the geographic bounds within the Mississippi Valley Division (particularly the Memphis District, Vicksburg District and New Orleans District). The work shall include; required clearing and grubbing, placing geotextile material, placing and compacting of earthen fill to the lines and grades required, moisture and density control of placed earthen fill, construction of sheet pile or slurry seepage cut-off features, installation of groundwater relief wells to specified depth below ground surface, collecting and analyzing soil boring data to establish location of well screens, placing well screens, stems, and filter packs, caps, covers, seals, etc., grouting groundwater wells as required, providing drainage as shown on plan drawings, developing and cleaning ground water wells, establishing turf grass over the work area, and construction of crushed stone access roadways and ramps, miscellaneous reinforced concrete work as shown on plan drawings. The work shall also include flood wall construction, which generally consists of a new temporary access road, ramps, temporary retaining structure, structural excavation and backfill, steel pipe, or concrete piling, reinforced concrete floodwall construction, storm drainage utilities, and other incidental work.� The work will include furnishing all plant, materials, equipment, labor, and supervision, to complete the work as described. Please contact Gabe Harris at Gabe.Harris@usace.army.mil for any questions. A Question and Answers document has been posted.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/fe40242637ca41d095ccb629ddf31976/view)
 
Record
SN05571554-F 20200227/200225230137 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.