SOURCES SOUGHT
Y -- CA YOSE 17(4) & 941(1) Tioga Road & Tuolumne Meadows & Tenaya Lake Parking
- Notice Date
- 2/24/2020 8:36:19 AM
- Notice Type
- Sources Sought
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF-20-SS-0008
- Response Due
- 3/9/2020 1:00:00 PM
- Archive Date
- 03/24/2020
- Point of Contact
- Jorey Deml, Ryan Phillips
- E-Mail Address
-
cflacquisitions@dot.gov, CFLAcquisitions@dot.gov
(cflacquisitions@dot.gov, CFLAcquisitions@dot.gov)
- Description
- THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT� INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov for receipt by close of business (2 p.m. local Denver time) on March 09, 2020:� (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program.� In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration).� This information must be provided in order to determine eligibility � DO NOT SEND COPIES OF YOUR SAM PROFILE; (3) Letter from bonding agent stating your firm�s capability to bond for a single project of $35 million, and your firm�s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value in which you performed (as the prime contractor) highway construction work that included the following activities:� asphalt concrete pavement, concrete curb, aggregate base, surface course aggregate, metal pipe culverts, rock excavation, subexcavation, utility relocations, full depth reclamation, unclassified borrow, roadway excavation, concrete sidewalk, and rockery wall.� State whether your firm was the prime contract or subcontractor on the project.� DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc.� Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.� All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs.� This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs.� A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS:� CA YOSE 17(4) & 941(1) Tioga Road & Tuolumne Meadows & Tenaya Lake Parking This project will consist of roadway resurfacing, restoration, and rehabilitation of 12 miles of Tioga Pass Road including eliminating off road/shoulder parking and reconfiguring/expanding parking areas within the Tuolumne Meadows and Tenaya Lake areas to improve the safety of pedestrians and drivers, within Yosemite National Park, CA.� The project includes work at 12 parking sites within Tuolumne Meadows, 4 parking areas at Tenaya Lake and heavy maintenance repairs to the Tuolumne River Bridge.� The Tuolumne Meadows area of the park experiences high visitation which is estimated at over 600,000 visitors per year (all occurring during the open period from late spring through summer). �The terrain is mountainous with the elevation for the work ranging between 8,200 and 9,200 feet.� Tioga Road is typically closed throughout the project limits from October to May due to heavy winter/spring snowfall and avalanche hazards.� See website below for historical seasonal opening and closing dates: https://www.nps.gov/yose/planyourvisit/seasonal.htm This project increases the existing formal parking supply in Tuolumne Meadows through reconfiguration and expansion of existing parking lots, and formalization of parking along the Stables Road. Off road/shoulder parking along Tioga Road in the vicinity of the existing Visitor Center and Cathedral Lake trailhead will be removed after the expanded parking is constructed.� This project also addresses roadside parking congestion and visitor safety in the Tenaya Lake area through reconfiguration of 4 existing parking lots, removal or formalization of roadside parking, installation of crosswalks, and sidewalk improvements. All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations.� Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work.� Principle work items include: 40,000 tons of asphalt concrete pavement, gyratory mix, 42,000 linear feet of concrete curb, 18,000 tons of aggregate base, 11,000 tons of surface course aggregate,� 3,000 linear feet of metal pipe culverts 3,000 cubic yards of rock excavation, 4,000 cubic yards of subexcavation Utility relocations including electrical, telephone, water, 12 miles of full depth reclamation, 5,000 cubic yards of unclassified borrow, 8,000 cubic yards of roadway excavation, 2,500 square yards of concrete sidewalk, and 1,000 square feet of rockery wall The anticipated advertisement date for the project is June 2020 with construction anticipated from August 2020 to October 2022. The contracting range for this project is between $25 million and $35 million.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/27bf27554f3a442b8bb6c4b59f54f8cf/view)
- Place of Performance
- Address: Yosemite National Park, CA 95389, USA
- Zip Code: 95389
- Country: USA
- Zip Code: 95389
- Record
- SN05571155-F 20200226/200224230143 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |