SOLICITATION NOTICE
J -- Alarm System Installation at Lassen Volcanic NP
- Notice Date
- 2/24/2020 9:52:40 AM
- Notice Type
- Solicitation
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- PWR PORE MABO (84000) POINT REYES STATION CA 94956 USA
- ZIP Code
- 94956
- Solicitation Number
- 140P8420Q0022
- Response Due
- 3/10/2020 8:59:59 PM
- Archive Date
- 03/25/2020
- Point of Contact
- Chico, Elizabeth
- E-Mail Address
-
Elizabeth_Chico@nps.gov
(Elizabeth_Chico@nps.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- UPGRADE/INSTALLATION OF ALARM SYSTEM FOR MULTIPLE BUILDINGS, LASSEN VOLCANIC NATIONAL PARK, TEHAMA AND SHASTA COUNTIES, CALIFORNIA. The National Park Service, Lassen Volcanic National Park, has a requirement for upgrade and installation of alarm systems for up to nine buildings in the Headquarters, Southwest Visitors Center, and Manzanita Lake areas of the park. The Contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project specifications and associated documents provided as attachments to this solicitation. Per FAR 36.204 the project range is estimated to be between $25,000 and $100,000. The North American Standard Industrial Classifications System (NAICS) Code for this requirement is 238210, with a corresponding size standard of $16.5 million in annual gross receipts for the past three years. This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall not be considered. The work of this contract consists of labor, materials, and equipment required for installation of complete code compliant wireless fire alarm and/or intrusion and audio and video recording systems capable of coverage for the buildings listed in the attached specifications. The systems shall use all new equipment and shall meet the requirements for complete coverage as defined by NFPA 72, applicable codes, and other project requirements. Some buildings already have re-usable conduit, but contractor installed components such as panels, motion, fire and smoke sensors and monitoring cameras shall be in paintable wiremold raceways where wireless technology is not possible. The Contractor shall provide all manpower, equipment, testing, and supplies to perform the replacement and related services as identified within the specifications document and any additional documents or requirements. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work. An organized site tour has been scheduled - see Section L for more information.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/3a04a4a8cf294ef3af64257d606e692b/view)
- Record
- SN05570465-F 20200226/200224230138 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |