Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 26, 2020 SAM #6663
SOLICITATION NOTICE

J -- Alarm System Installation at Lassen Volcanic NP

Notice Date
2/24/2020 9:52:40 AM
 
Notice Type
Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
PWR PORE MABO (84000) POINT REYES STATION CA 94956 USA
 
ZIP Code
94956
 
Solicitation Number
140P8420Q0022
 
Response Due
3/10/2020 8:59:59 PM
 
Archive Date
03/25/2020
 
Point of Contact
Chico, Elizabeth
 
E-Mail Address
Elizabeth_Chico@nps.gov
(Elizabeth_Chico@nps.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
UPGRADE/INSTALLATION OF ALARM SYSTEM FOR MULTIPLE BUILDINGS, LASSEN VOLCANIC NATIONAL PARK, TEHAMA AND SHASTA COUNTIES, CALIFORNIA. The National Park Service, Lassen Volcanic National Park, has a requirement for upgrade and installation of alarm systems for up to nine buildings in the Headquarters, Southwest Visitors Center, and Manzanita Lake areas of the park. The Contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project specifications and associated documents provided as attachments to this solicitation. Per FAR 36.204 the project range is estimated to be between $25,000 and $100,000. The North American Standard Industrial Classifications System (NAICS) Code for this requirement is 238210, with a corresponding size standard of $16.5 million in annual gross receipts for the past three years. This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall not be considered. The work of this contract consists of labor, materials, and equipment required for installation of complete code compliant wireless fire alarm and/or intrusion and audio and video recording systems capable of coverage for the buildings listed in the attached specifications. The systems shall use all new equipment and shall meet the requirements for complete coverage as defined by NFPA 72, applicable codes, and other project requirements. Some buildings already have re-usable conduit, but contractor installed components such as panels, motion, fire and smoke sensors and monitoring cameras shall be in paintable wiremold raceways where wireless technology is not possible. The Contractor shall provide all manpower, equipment, testing, and supplies to perform the replacement and related services as identified within the specifications document and any additional documents or requirements. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work. An organized site tour has been scheduled - see Section L for more information.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/3a04a4a8cf294ef3af64257d606e692b/view)
 
Record
SN05570465-F 20200226/200224230138 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.