SOLICITATION NOTICE
59 -- CAP
- Notice Date
- 2/11/2020 12:54:00 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- SPRMM1 DLA MECHANICSBURG MECHANICSBURG PA 17055-0788 USA
- ZIP Code
- 17055-0788
- Solicitation Number
- SPRMM120QRA72
- Response Due
- 3/23/2020 8:59:59 PM
- Archive Date
- 04/07/2020
- Point of Contact
- Telephone: 7175503136
- E-Mail Address
-
TONYA.NEARHOOD@DLA.MIL
(TONYA.NEARHOOD@DLA.MIL)
- Awardee
- null
- Description
- HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|MIL-I-45208 OR ISO 9001 NCSL Z540.3 or ISO 10012| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| PRODUCTION LOT TESTING (11-1992)|1|30 | GENERAL INFORMATION-FOB-DESTINATION|1|B| EXERCISE OF OPTION TO FULFILL FOREIGN MILITARY SALES COMMITMENTS-BASIC(NOV 2014))|4||||x| WARRANTY OF DATA--BASIC (MAR 2014)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|FAT details called out in drawing||14|180|N64498|TBD|TBD|30||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEC 2017))|5|||||| OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)|1|210 DAYS ADC| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (JAN 2019)(DEVIATION 2019-O0003)|2||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JUN 2019)|11|X|X|X||X|X||||| | ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2019)|12|334220|1250|X|X|X|||||||| REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCESERVICES OR EQUIPMENT (AUG 2019))|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| An option provision is included in this solicitation under line item 0001AC. In the event that the Government has an additional requirement after award, this option will authorize the Government to add the additional quantity, UP TO the percentage cited, via modification without having to resolicit. It is requested that pricing be submitted for the option provision in the space below: OPTION Unit Price: _________; OPTION Validity: ________ Days ADC This solicitation is being issued in accordance with Special Emergency Procurement Authority (SEPA). As a result, this procurement is exempt from IUID IAW DFARS 211.274-2(b)(1). THIS ITEM IS DESIGNATED AS A CRITICAL SAFETY ITEM. THIS SOLICITATION IS BEING ISSUED IN ACCORDANCE WITH SEPA - SPECIAL EMERGENCY PROCUREMENT AUTHORITY. AS A RESULT, THIS PROCUREMENT IS EXEMPT FROM IUID IAW DFARS 211.274-2(b)(1). Drawings for this solicitation can be accessed via the following website: www.Beta.SAM.gov. Select ALL AWARD DATA and search by the solicitation number. The solicitation will include a link to the drawings for view and download. Registration to the website is required to access the drawings. Drawings are normally available within 1 week after the solicitation is posted. If there are problems accessing the drawings after 7 days of the solicitation posting, please contact the buyer listed. This requirement includes DD1423, CONTRACT DATA REQUIREMENTS, that require PIEE/WAWF submittal and approval prior to production and/or shipment of material. The estimated delivery time for these requirements is as follows: A001 - Inspection & Test Plan - Quality Control-Submit within 30 days after date of contract - approval in 60 days ADC A002 - Test Procedures-First Article-Submit within 90 days ADC - approval 120 days ADC - Approval required prior to FAT. A003 - First Article Test Report - submit within 180 days ADC - approval 210 days ADC-Approval required prior to production units. A004 - Certification/Data Report-Material Certificate of Conformance - requiredwith both FAT and PLT-submit 180 days ADC with FAT Report and 270 days ADC with other required PLT report-Approval 210 and 300 Days ADC-approval required prior to shipment of production units. A005 - Test Report/Quality Conformance Inspection - submit within 270 days ADC - approval 300 days ADC-Approval required prior to shipment of production units. A006 - Test Report/Visual-Dimensional Inspection(to be included as part of both FAT & PLT reports)-submit 180 days with FAT and 270 days with PLT-approval 210 days (FAT) & 300 days (PLT)-approval required prior to shipment of production units. A007 - Certification/Data Report-Certificate of Mercury Exclusion-submit 270 days ADC - approval 300 days ADC - approval required prior to shipment of production units Final delivery of production units - 330 days ADC Required Delivery is 330 days After Date of Contract considering the above estimated schedule. Quoted delivery is ____ days ADC based upon vendor ability to complete required CDRL's. Please provide revised submittal schedule for CDRLs if the above cannot be met. Inspection of material will be at: ______________________________________________________________________ Inspection of packaging and final acceptance of material will be at: ______________________________________________________________________ All contractual documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders and Modifications) related to the instant procurement are considered to be ""Issued"" by the Government when copies are either deposited in the mail, transmitted by Facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""Issue"" contractual documents as detailed herein. \ 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;OE-592 Antenna Cap; for use on Navy submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 ;MIL-I-45208A MAY BE USED IN LIEU OF IS0 9001. NCSL Z540.3 MAY BE USED IN LIEU OF ISO 10012.; 2.1.2 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 2.1.3 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=4398597 |53711| R| |D|0001 | R|49998|1500835 DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01| DOCUMENT REF DATA=MIL-STD-973 | | | |000930|A| |04| DOCUMENT REF DATA=MIL-R-9300 | | |B |680115|A| | | DOCUMENT REF DATA=MIL-P-17549 | | |D |810831|A| | | DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | | DOCUMENT REF DATA=MIL-I-45208A | | | |951103|A|2 | | DOCUMENT REF DATA=ISO 9001 - 9/15/15 | | | | |A| | | DOCUMENT REF DATA=ISO 10012 - 4/15/03 | | | | |A| | | 3. REQUIREMENTS 3.1 ;Design and Manufacturing - The ;OE-592 Antenna Cap; furnished under this contract/ purchase order shall meet the material, physical and mechanical requirements as specified on Drawing 4398597, Item No. 22B including associated specifications mentioned in this procurement. ; 3.2 ;Marking Requirements - The supplier shall permanently mark and identify each first article and production lot unit ;OE-592 Antenna Cap; as shown on sheet 13 of Drawing 4398597 per MIL-STD-130. ; 3.2.1 ;The supplier shall mark ;tag or bag; each unit with drawing/item number, contract, lot or batch and serial number in accordance with MIL-STD-130.; 3.3 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The first article testing/ inspection procedure and approval are required for the ;OE-592 Antenna Cap;. Government approval is required prior to commencement of first article unit.; 3.4 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.ogilvie@navy.mil, Code 242MO after award of contract.; 3.4.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.5 Configuration Control - MIL-STD-973 entitled ""Configuration Management"", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.5.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.6 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a ""Warning Plate"" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110 ; 4.5 ;Finished Edges - Finished edges shall be in accordance with the applicable drawing requirements.; 4.6 ;Material Control - The supplier shall have an effective material control system that provides for the control of materials by lot or batch as ordered for first article and production lot units.; 4.7 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on ;OE-592 Antenna Cap; in accordance with the drawing, Military Specification MIL-P-17549 and their approved first article procedure.; 4.7.1 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an NSWCPD representative has the option of being present during the first article testing/inspection.; 4.8 ;First Article Approval for Testing/Inspection Procedure and Acceptance - (Supplier Testing/Inspection). The supplier shall prepare and submit their First Article Testing/ Inspection Procedure ;OE-592 Antenna Cap; in accordance with the requirements of DI-NDTI-80603, applicable drawing and MIL-P-17549 as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the procedure is required prior to commencement of first article unit. CDRL: FIRST ARTICLE TESTING/INSPECTION PROCEDURE per DI-NDTI-80603A; 4.9 ;First Article Testing/Inspection - The supplier shall perform 100% examination, inspection and testing on the first article ;OE-592 Antenna Cap; unit in accordance with the applicable drawing, MIL-P-17549 and their approved first article procedure. The supplier shall record the actual measurements and results of each examination, inspection and test specified in MIL-P-17549 and their approved first article procedure.; 4.9.1 ;Visual/Dimensional Inspection - The supplier shall visually and physically inspect 100% the first article unit and record the actual measurements of each dimension identified on the applicable drawing. ; 4.10 ;First Article Testing/Inspection Report and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the first article unit, testing/inspection reports in compliance with the requirements of DI-NDTI-80603, applicable drawing and specifications. The report shall also include a copy of ;Certificate of Conformance for Materials and Visual/Dim ensional Inspection Report; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the first article testing/inspection report is required prior to commencement of production units. CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.11 ;Production Lot.; 4.11.1 ;The supplier shall perform 100% inspection, examination and testing on each completed production unit in accordance with the applicable requirements listed in MIL-P-17549 (Quality Conformance Inspection). The supplier shall record the actual measurements and results of each examination, inspection and test specified in MIL-P-17549.; 4.11.2 ;Visual/Dimensional Inspection - The supplier shall visually and physically inspect 100% each completed production lot unit and record the actual measurements of each dimension identified on the applicable drawing. ; 4.12 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units. ; 4.13 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR. NSWCPD shall either issue Specific Government Inspection Instructions or Inspection Hold Points based on whether DCMA or NSWCPD will be performing the required Inspections/Tests. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.; 4.14 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of raw material and finished parts. Records shall be traceable by drawing/item, lot or batch, serial and contract number. All OQEDS shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.; 4.14.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/item, lot or batch, serial and contract number. Supplier format is acceptable for the below listed CDRLs. a.Certificate of Conformance for Materials (certifying the applicable materials in accordance with drawing 4398597 and MIL-P-17549 requirements.) CDRL: CERTIFICATE OF CONFORMANCE per DI-MISC-80678 b.Certified Examination, Inspection & Test Report shall be in accordance with MIL-P-17549 (Quality Conformance Inspection Requirements) of drawing 4398597. CDRL: CERTIFIED EXAMINATION, INSPECTION & TEST REPORT per DI-NDTI-80809B c.Visual/Dimensional Inspection Reports shall show all the characteristics, the actual measurement results of each dimension inspected including contract number, name of supplier, drawing/item number, drawing revision letter, lot or batch and serialnumber of finished parts, item nomenclature, inspector's accep tance signature and date. CDRL: VISUAL/DIMENSIONAL INSPECTION REPORT per DI-NDTI-80809B d.Mercury Exclusion Certification (representing the contract units shipment). CDRL: MERCURY EXCLUSION CERTIFICATION per DI-MISC-80678; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for ""Official Use Only"" and ""NOFORN"" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE QUALITY INSPECTION PLAN BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A001. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;; DATE OF FIRST SUBMISSION=ASREQ ;;PROCEDURE SHALL BE IN ACCORDANCE WITH DRAWING 4398597 AND MILITARY SPECIFICATION MIL-P-17549 REQUIREMENTS.;; ;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A002. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;; DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A003. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;; DATE OF FIRST SUBMISSION=ASREQ ;;SUPPLIER FORMAT IS ACCEPTABLE.;; ;;CERTIFICATION FOR MATERIALS SHALL BE IN ACCORDANCE WITH DRAWING 4398597 AND MILITARY SPECIFICATION MIL-P-17549 REQUIREMENTS.;; ;;APPROVAL OF THE CERTIFICATION BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;; DATE OF FIRST SUBMISSION=ASREQ ;;REPORT SHALL BE IN ACCORDANCE WITH MILITARY SPECIFICATION MIL-P-17549 (QUALITY CONFORMANCE INSPECTION REQUIREMENTS) OF DRAWING 4398597.;; ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A005. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;; DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A006. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;; DATE OF FIRST SUBMISSION=ASREQ ;;SUPPLIER FORMAT IS ACCEPTABLE.;; ;;APPROVAL OF THE CERTIFICATION BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A007. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;;
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/756d2dc9ab0645ccabb1178974422783/view)
- Record
- SN05558899-F 20200213/200211230200 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |