Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 17, 2020 SAM #6623
SOLICITATION NOTICE

J -- NONDESTRUCTIVE TEST EQUIPMENT CALIBRATION & MAINTENANCE SERVICES

Notice Date
1/15/2020 12:30:15 PM
 
Notice Type
Solicitation
 
NAICS
541380 — Testing Laboratories
 
Contracting Office
W6QK ACC-APG DIR ABER PROV GRD MD 21005-3013 USA
 
ZIP Code
21005-3013
 
Solicitation Number
W91ZLK-20-R-0450
 
Response Due
2/14/2020 9:01:00 AM
 
Archive Date
02/29/2020
 
Point of Contact
Jamison, Gregory, Phone: 4438614742, Robert J. Rogers, Phone: 4438614749
 
E-Mail Address
gregory.j.jamison.civ@mail.mil, robert.j.rogers41.civ@mail.mil
(gregory.j.jamison.civ@mail.mil, robert.j.rogers41.civ@mail.mil)
 
Description
The contractor shall provide calibration and maintenance�for the nondestructive equipment IAW the ASNT and NAS-410 requirements. See PWS for list of equipment.� The contractor shall be a recognized Magnaflux� authorized service center.� The magnetic particle units shall be calibrated per American Society for Testing and Materials E1444-11 (ASTM E1444-11) requirements and the Magnaflux� specifications using National Institute of Standards and Technology (NIST) traceable standards.� Calibration of the Magnaflux� magnetic particle units shall include at a minimum: * Ammeter accuracy of any/all ammeters used on units. * Timer accuracy. * Quick break check. The contractor shall provide preventive/corrective maintenance on all magnetic particle inspection units at the time of calibration.� The contractor shall be Magnaflux� trained to service all ATC magnetic particle machines and any/all associated equipment.� Preventive maintenance shall include at a minimum: �Headstock, tailstock and coil mechanical operation. Short circuit test between the headstock and tailstock. Quick break function test (only on 3 phase FWDC and HWDC machines). Pump and fluid hose circulation, bath level, and bath concentration. Inspection of bath tank for foreign material. Pneumatic operation of the headstock (includes headstock, footswitch and air solenoid valve). Function of cooling fans inside the unit. Electrical checkout of all operating relays, timers and contactors. Checking physical condition of contactors. Physical inspection of all electrical wiring and cables. Operational check of all switches and controls associated with the unit. Any item found during the inspection is documented and corrected (if possible) during the calibration visit. Eddy Current inspection units shall be calibrated to ASNT requirements and the manufacturer�s specifications using National Institute of Standards and Technology (NIST) traceable standards.� The frequency response over the entire range of the instrument and proper wave form will be verified. Dye Penetrant inspection units shall be calibrated to ASNT requirements using National Institute of Standards and Technology (NIST) traceable standards. Ultrasonic Test inspection units shall be calibrated to ASNT requirements using National Institute of Standards and Technology (NIST) traceable standards. The contractor performing the calibration and repair services shall discuss all findings and results with the ATC TPOC before leaving the work site.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/5e46d1d4ea8f41cda15359641591abd6/view)
 
Place of Performance
Address: Aberdeen Proving Ground, MD 21005, USA
Zip Code: 21005
Country: USA
 
Record
SN05535328-F 20200117/200115230154 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.