FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 08, 2019 FBO #6557
SOLICITATION NOTICE

59 -- SSA LAN Cable and Electrical Adobe Connect Project - Scope of Work

Notice Date
11/6/2019
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), R2 Acquisition Management Division Brooklyn/Queens/LI Unit (47PC04), 225 Cadman Plaza, Room N 150, Brooklyn, New York, 11201, United States
 
ZIP Code
11201
 
Solicitation Number
EQ-2PSBL-20-0007
 
Archive Date
12/17/2019
 
Point of Contact
Daisy Tamberino,
 
E-Mail Address
daisy.tamberino@gsa.gov
(daisy.tamberino@gsa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Drawings will be provided at walk through. SCOPE OF WORK Date: November 6, 2019 Building: Joseph P. Addabbo Federal Building Project Title: LAN Cables and Electrical Outlets for Adobe Connect Project *Walk through: NOVEMBER 12TH, 2019* Please email: daisy.tamberino@gsa.gov & joseph.virga@gsa.gov to confirm your attendance at the walk through. Proposals due: 12/2/19 12PM The purpose of this project is to install CAT 6 LAN cables and electrical outlets in the 3 rd Floor Jamaica District Office IVT room and the 2 nd Floor Office of Hearings Operation IVT room. Both offices are located inside of the Joseph P. Addabbo Federal Building. This work is required in preparation for the national rollout of the Adobe Connect (AC) Interactive Video Teletraining (IVT) Modernization. I. GENERAL REQUIREMENTS: A. All workers are to submit required documentation for security clearances. B. All work in the Addabbo Federal Building shall be done after business hours. This being Monday through Sunday from 6:30PM to 5:30AM. If the building is not working on Saturday or Sunday, work can be performed during normal business hours on those days. C. All contract employees are to arrive at the building with two forms of non-expired government identification, one of which must be a photo-ID. D. All contract employees are to sign in and out each workday at the main security desk, and should wear the ID issued by security at all times. All contract employees shall also sign in each day with the Fire Safety Director in the Emergency Command Center (ECC). E. The contractor is responsible for all final measurements; any figures in this scope are approximate. F. It is mandated by Executive Order 13101 (Greening the Government through Waste Prevention, Recycling, and Federal Acquisition) and Section 6002 of the Resource Conservation and Recovery Act (RCRA) that the Federal Government use recycled-content products in the construction and/or renovation of facilities. It is the intent of the Government to comply with the EPA requirement 100% of the time and use as many of the applicable listed recycled-content products as feasible and economically practical. G. Whenever the potential for the use of a non-recycled content product exists during the construction, the Contractor shall incorporate in this project, as a substitute, recycled-content products that are listed and identified in the Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines (CPG) for recycled-content products. The Contractor shall use recycled-content products as required by EPA, other governmental agencies and Federal Acquisition Regulation (FAR) clauses. H. PRIOR TO START OF THE JOB, the contractor shall submit for approval all SDS sheets on all materials and chemicals intended for use. I. The contractor is responsible for the proper disposal of all debris. Any debris removed from the building must be recycled and proof must be submitted to SSA showing that the material was recycled. J. Contractor use of government materials and/or equipment is not permitted. K. Any damage done (not related to the job) to the walls, windows, floor, furniture, ceiling, etc. by the contractor is to be repaired in full at the contractors expense. The contractor is responsible for fire stopping and penetrations made through firewalls. L. The contractor shall submit his/her license prior to work beginning (e.g. plumbing, electrical, general contractor, etc.) M. All construction and electrical work is to meet city, state and federal codes N. All work shall be completed by 1/31/2019 II. SPECIFIC REQUIREMENTS: The contractor shall be responsible for providing a minimum Category 6 (as defined by the TIA/EIA 568 Standard) compliant data channel from the patch panel in the DCR (Data Communications Room). The contractor shall punch down at the patch panel and the patch panel shall be labeled by the contractor. The cable itself shall also be labeled accordingly. Labeling for the patch panel must be machine generated, hand written labels are unacceptable. The contractor shall leave a minimum of five feet of slack in the DCR. The contractor is responsible for attaching all connectors to the LAN cables. The contractor shall certify compliance by testing and the results compared to the TIA/EIA 568 standard and requirements set forth in this document for the appropriate cable type. NONE of the cable runs shall be on the ceiling, tiles or grid. ALL cables run shall be supported using the existing cable trays or using J-hooks. The contractor shall terminate all cables appropriately terminated and subsequently tested and certified. A formal testing report shall be provided to the Social Security Administration. LAN CABLING: 2 nd Floor: Run (2) LAN cables (minimum Category 6) from Office of Hearings Operations (OHO) LAN closet to the OHO IVT Room (Total length of each run is approximately 250 feet). (2) wall plates with female connectors are to be installed. Locations along wall are to be determined. Wall plates and the patch panel shall be labeled. 3 rd Floor: Run (15) LAN cables (minimum Category 6) from Jamaica District Office LAN closet to the Jamaica District Office IVT Room. (Total length of each run is approximately 150 feet). The contractor shall purchase and install (15) new individual boxes with female connectors are to be installed. The exact box locations at the desks will be determined. Wire molding shall be installed to hide wires coming down from the ceiling along the window mullions. Floor wire covers to be provided at the floor to cover cabling running along the carpet. Wire molding color to match window frames. All boxes and the patch panel shall be labeled. The contractor shall purchase and install (1) new 45 port patch panel ELECTRICAL OUTLETS: 3 RD FLOOR DISTRCT OFFICE: · The contractor shall purchase and install (6) 110v circuits with the corresponding 20 amp breakers. · The contractor shall run metal pipe from the electrical panel to outside of the electrical closet. · The contractor shall terminate the pipe with the proper splice/junction box above the ceiling. · The contractor shall purchase and install 3 or 4 wire #12 gauge MC cable that shall be run from the electrical closet through the pipe and splice/junction box to the corresponding workstation power polls or outlet box. · The contractor shall purchase and install the proper orange outlets matching the building standard. · The MC cable shall be adequate to power 15 workstations (laptops) with one circuit per 4 workstations. · We estimate that each run will require approximately 250 feet of MC cable. · The contractor shall follow all local NYC and federal electrical codes. III. DATA REQUIREMENTS ABBREVIATIONS AND DEFINITION OF TERMS: DCR – Data Communications Room EIA – Electronics Industry Association FIPS PUB 94 - Federal Information Processing Standard, Publication 94 IG – Isolated Ground NFPA – National Fire Protection Association NEC – National Electric Code STP-- Shielded, twisted pair cable generally meaning IBM Type 1 or Type 1A TIA -- Telecommunications Industry Association UTP -- Unshielded twisted pair cable REFERENCES: Conformance to the latest revision of the following is required under this specification. A. FCC Regulations: 1. Part 15- Radio Frequency Devices& Radiation Limits 2. Part 68- Connection of Terminal Equipment to the Telephone Network B. FIPS PUB 94 - Federal Information Processing Standard 94, See FTR C. FTR 1090-1997 - The National Communication System is now responsible for issuing and maintaining information relating to the Federal Government’s communications standards. FIPS PUBs have been superseded by a system of Federal Telecommunications Recommendations. Specifically, FTR 1090-1997, Commercial Building Telecommunications Cabling Standard, outlines requirements for the installation of structured cabling systems in Federal buildings. D. NEC - The National Electric Code (NEC) is published by the National Fire Protection Association (NFPA) and is part of most building codes. Compliance with the latest edition of this code is mandatory for electrical installation to safeguard persons and property from hazards arising from the use of electricity. Some local building codes may also have additional requirements. E. National, State, Local and any other binding building and fire codes. F. TIA/EIA 568 – Commercial Building Telecommunications Cabling Standard G. TIA/EIA 569 - Commercial Building Standard for Telecommunications Pathways and Spaces. H. TIA/EIA 606 - Administration Standard for the Telecommunications Infrastructure of Commercial Buildings. I. Underwriter’s Laboratories (UL): Applicable listing and ratings General : 1. Provide a continuous single cable, homogeneous in nature for every cable run. Splices are not permitted. Manufacturers : Manufacturers are shown below as an indication of acceptable product quality. “Or equal” substitutes will be considered upon submission. 1. AMP, Belden, Berk-Tek, Chatsworth, Fibertron, JDI, Leveton, Lucent Technology, Mohawk, Nordx/CDT, Ortronics, Panduit, Suttle, The Siemon Company. Cable Provide horizontal minimum Category 6 unshielded twisted pair (UTP) cable or higher meeting the following requirements: a. Provide cable suitable for indoor installation. b. Provide cable with 4 twisted pairs of insulated copper conductors per cable, 24 AWG solid copper, fully insulated with retardant low-smoke thermoplastic material, plenum NEC CMP rated, and UL listed as such. c. Color code twisted pairs individually, within color coded bundles, to industry standards (ANSI/ICEA Publication S-80-576, and EIA-230). d. Comply with appropriate TIA/EIA-568 performance requirements. e. Provide copper UTP cable. C onnectors 1. Fiber- Backbone cabling multimode fiber optic connectors shall be type LC or as determined by SSA. 2. Copper- Category 6, 8-pin modular connectors, T568-A wired.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/844b6162b4b2d8bb05f96b24c9a9a6d0)
 
Place of Performance
Address: Addabbo Federal Office Building, 155-10 Jamaica Avenue, Queens, New York, 11432, United States
Zip Code: 11432
 
Record
SN05490781-W 20191108/191106230514-844b6162b4b2d8bb05f96b24c9a9a6d0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.