Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 30, 2019 FBO #6548
SOLICITATION NOTICE

Y -- Renovate Hangar 68 Fire Suppression - Attachment A - Attachment F - Attachment E - Attachment C - Attachment H - Attachment D - Attachment G - Solicitation - Attachment B

Notice Date
10/28/2019
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, AFTC/PZIO - Eglin, 308 West D. Ave, Bldg 260, Suite 130, Eglin AFB, Florida, 32542-5418, United States
 
ZIP Code
32542-5418
 
Solicitation Number
FA282320R0001
 
Archive Date
12/12/2019
 
Point of Contact
Michael Cenedella, Phone: 8508820362, Ronald J. Wilson, Phone: 8508823466
 
E-Mail Address
michael.cenedella.1@us.af.mil, ronald.wilson.22@us.af.mil
(michael.cenedella.1@us.af.mil, ronald.wilson.22@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
Specifications dated 4/16/19 Hangar 68 Solicitation 50 Division worksheet PPQ Small business participation plan Wage Rates FL217 FRQ Base Access memo FTFA 17-1126, Phase B2, HANGAR 68 DRAWINGS, dated 4/16/19 FTFA 17-1120, Phase C, HANGAR 68 DRAWINGS, dated 4/16/19 FTFA 17-1045, Phase B1, HANGAR 68 DRAWINGS, dated 4/16/19 FTFA 16-1189, MultiPhase A-D, HANGAR 68 DRAWINGS, dated 4/16/19 Eglin Air Force Base (AFB), FL has a requirement to renovate Hanger 68 on Eglin AFB, FL. The North American Industry Classification System (NAICS) code for this requirement is 236220. The acquisition is unrestricted - full and open competition. Work involves the renovation of the fire suppression system in an approximately 80,000 sq ft existing building. Project will consist of one main fire suppression phased renovation across multiple rooms and three (3) separate bid options for additional renovations in the hangar. Work may include, but is not limited to: sitework, utilities, fire suppression upgrade and removal, lead abatement, Fire protection, roofing work, interior partitions/vestibules, interior finishes, HVAC systems, plumbing, restroom renovations, power, and lighting work. Contractor shall comply with the contract, all applicable Unified Facilities Criteria (UFC) and American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) requirements, in addition to Federal, State, and local requirements. All work shall be accomplished in accordance with applicable drawings, specifications, industry standards, applicable building and environmental codes, regulations, and laws. In general, the work includes furnishing labor and materials in accordance with the project's Drawings and Specifications, dated 16 April 2019. All work shall be accomplished in accordance with the applicable drawings, specifications, industry standards, applicable building and environmental codes, regulations and laws, and the contract document. The performance period is 365 days after the Notice to Proceed (NTP). Prospective contractors must be registered in the System for Award Management (SAM) database prior to award of a Government contract. Offerors are further advised that failure to register in the SAM database will render your firm ineligible for award. Registration requires applicants to have a DUNS number. Recommend registering immediately in order to be eligible for timely award. This solicitation will be available ONLY via the Internet at the following address: http://www.fbo.gov. For information on how to register your company on FBO, to view or receive updates and notifications to the solicitation, please reference the FBO Vendor Guide located on the FBO web site home page. NO paper copies of the solicitation will be furnished. Offerors must thoroughly review the specifications and drawings and submit all questions no later than the date specified in Section L of the solicitation. At the site visit, detailed at clause 52.236-27 Alternate I of the solicitation, offerors will be required to submit questions in writing to the Contracting Officer by the date following specified in Section L. Verbal questions and responses at the site visit will not be considered official unless received in writing. Any questions not submitted in writing by the specified time will not be entertained and will not form a basis for an extension of the proposal due date. Official responses to questions received, will be posted to fbo.gov within 3-days. The below attached documents MUST BE DOWNLOADED SEPERATELY: Solicitation - FA282320R0001 Attachment A - Drawings, Phases A, B, C, & D, dated 16 Apr 19 Attachment B - Specifications, dated 16 Apr 19 Attachment C - Wage Determination, FL 190217 Attachment D - PPQ Attachment E - FRQ Attachment F - Base Access Memo Attachment G - 50 Divisions Cost Estimate Attachment H - Small Business Participation Plan
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/4e3a9745b6fb966745d3a64fee6f7f23)
 
Place of Performance
Address: Hangar 68 - Eglin AFB, Eglin AFB, Florida, 32542, United States
Zip Code: 32542
 
Record
SN05483783-W 20191030/191028230422-4e3a9745b6fb966745d3a64fee6f7f23 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.