Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 04, 2019 FBO #6522
MODIFICATION

Y -- TX FTNP BIBE 14(2), 13(5), 11(3) Chisos Basin, West, North Entrance Roads - Solicitation 1

Notice Date
10/2/2019
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
6982AF19B000018
 
Response Due
11/1/2019 2:00:00 PM
 
Point of Contact
Leslie N. Karsten, , Sheri Walsh,
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
FP-14 TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin: Pavement Report TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin: Plan Set 6982AF19B000018 THIS IS AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE. THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS. PROJECT NUMBER: TX FTNP BIBE 14(2), 13(5), 11(3) PROJECT NAME : Chisos Basin, West, North Entrance Roads PROJECT DESCRIPTION: Work on approximately 2.3 miles of the Chisos Basin Road, from the West Entrance Road to the Campground intersection, would include road rehabilitation on its current alignment and at its current width. The rehabilitation would consist of pulverizing the existing asphalt for additional base, concrete curb, drainage improvements, and repaving with approximately 4” of asphalt. The first section of repair work on the West Entrance Road would begin at the Park boundary and continue for approximately 1.1 miles. Repair of this section would include approximately sub excavation, replacement of the subgrade, concrete paving, and base and repaving. The remaining road length would be pulverized, shaped and paved. The second section being reconstructed is 700 to 500 feet in length and will include subexcavation, subgrade work, aggregate base, asphalt pavement, and concrete paving. SIGNIFICANT QUANTITIES: Significant items for Schedule A Include: 2.3 miles full depth reclamation of existing pavement, 6,800 tons of hot asphalt concrete paving, 1 EACH concrete headwall, 90 LNFT of 42 inch arch or elliptical culvert, 700 CUYD roadway embankment, 750 CUYD of sub excavation, 2,000 LNFT of 12 inch colored concrete curb. Option X significant items include: 1,600 CUYD of sub excavation, 3,000 TONS of roadway aggregate, 45 SQYD Concrete Paved Waterway, 4,150 LNFT of 12 inch colored concrete curb, and 3,500 TONS of asphalt paving. Option Y significant items include: 3,000 LNFT Guardrail System MGS type 4 with terminal sections, and 800 miles of pavement markings. COST RANGE: Estimated total cost for Schedule A, Option X and Option Y is $5,000,000 to $7,000,000. CONSTRUCTION DURATION: November, 2019 through May, 2020 ADDITIONAL INFORMATION: Anticipated bid opening November, 2019. Anticipated award November, 2019.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF19B000018/listing.html)
 
Place of Performance
Address: Big Bend National Park, Texas, United States
 
Record
SN05466379-W 20191004/191002230650-44ae9f3580261872968d887a75eef4b6 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.