Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 26, 2019 FBO #6514
MODIFICATION

70 -- Army Installation Kits (IK) Production - Amendment 2 - Amendment 4 - Amendment 3

Notice Date
9/24/2019
 
Notice Type
Modification/Amendment
 
NAICS
334111 — Electronic Computer Manufacturing
 
Contracting Office
Defense Information Systems Agency, Procurement Directorate, DITCO-Scott, 2300 East Dr., Building 3600, Scott AFB, Illinois, 62225-5406, United States
 
ZIP Code
62225-5406
 
Solicitation Number
HC108419R0015
 
Archive Date
11/1/2019
 
Point of Contact
Kevin L. Poore, Phone: 6184186263, Sara Vogelgesang, Phone: 6184186704
 
E-Mail Address
kevin.l.poore.civ@mail.mil, sara.a.vogelgesang.civ@mail.mil
(kevin.l.poore.civ@mail.mil, sara.a.vogelgesang.civ@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
HC108419R0015 Conformed Copy J-3 IK Pricing Template v6 Amend 0002 HC108419R0015 Amend 0002 The purpose of RFP Amendment 0002: 1) Extend the RFP closing date to 1:00 PM CT on Friday, October 4, 2019; 2) Provide updated J-3 Pricing Template v6 that removed cost build up columns from the FFP Labor Pricing Page. Fully burdened FFP labor rates should be proposed. Cost build up details are not required. Note: Offerors are allowed to re-submit their proposals in its entirety and not just the pricing volume. However, if only the pricing volume is received the Government will utilize all previously submitted documents in response to this Solicitation. All revised attachments are included in the provided pdf file HC108419R0015 Amend 0002. ******************** The purpose of RFP Amendment 0001: 1) Provide answers to industry questions; 2) Extend questions for TDP clarification only to 2:00 PM CT on Wednesday, July 31, 2019; and 3) Extend the RFP closing date to 4:00 PM CT on Monday, August 19, 2019. This is a combined synopsis/solicitation for the production of U.S. Army, Project Manager Mission Command, Installations Kits (IKs). This effort is Full and Open Competition and will establish an Indefinite Delivery Indefinite Quantity Contract using FAR 15 based on Lowest Priced Technically Acceptable evaluation criteria. The Contractor shall be required to design, develop, produce, modify and deliver IK, cables, and brackets to support the installation of the PM MC managed systems and related subsystems of PEO C3T. All Contractor provided IKs shall be delivered in accordance with the Level II drawing packages associated with each IK. The associated IK drawing package is supplied as Attachment J-2 - IK Level II Drawing Packages. In addition, the Contractor shall supply engineering services to support the creation of new IKs and for the modification of existing IKs. There are seven (7) attachments to the RFP: J-1 IK Statement of Work; J-2 IK Level II Drawing Packages (available upon request); J-3 IK Price Template; J-4 Government Furnished Equipment (GFE) (available upon request); J-5 DD Form 1423-1 Contact Data Requirements List (CDRL); J-6 DISA Non-Disclosure Agreement (NDA); J-7 IK Performance Specifications (available upon request). Questions for this requirement should be submitted via email to sara.a.vogelgesang.civ@mail.mil and kevin.l.poore.civ@mail.mil NLT 4:00 P.M. Central Time on 10 Jul 2019. Proposals are due NLT 4:00 P.M. Central Time on 31 Jul 2019.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DISA/D4AD/DITCO/HC108419R0015/listing.html)
 
Record
SN05457064-W 20190926/190924231440-1df6a6f11ca86b63c69579f3e231ff18 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.