Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 26, 2019 FBO #6514
MODIFICATION

Z -- NIST Boulder Campus Renovation of Building 1 Wing 5, Wing 4 and Partial Spine / Main Corridor - Amendment 2

Notice Date
9/24/2019
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Commerce, National Institute of Standards and Technology (NIST), NIST AMD Boulder, 325 Broadway, Boulder, Colorado, 80305, United States
 
ZIP Code
80305
 
Solicitation Number
1333ND19RNB190004
 
Response Due
8/20/2019 2:00:00 PM
 
Archive Date
2/28/2020
 
Point of Contact
Tiffany Atchison, Phone: 3034975628, Willard G. Zbaeren, Phone: 3034975534
 
E-Mail Address
tiffany.atchison@nist.gov, willard.zbaeren@nist.gov
(tiffany.atchison@nist.gov, willard.zbaeren@nist.gov)
 
Small Business Set-Aside
N/A
 
Description
Attachment 25 - Davis Bacon Wage Determination, CO20180027 Attachment 24 - NIST Boulder Lab & Admin Space Planning Study 2016 from PPR Appendix C Attachment 23 - Historic Structure Report Attachments - Preservation Brief 41 Attachment 22 - Historic Structure Report Attachments - Preservation Brief 24 Attachment 21 - Historic Structure Report Attachments - Preservation Brief 18 Attachment 20 - Historic Structure Report Attachments - Preservation Brief 16 Attachment 19 - Historic Structure Report Attachments - Preservation Brief 15 Attachment 18 - Historic Structure Report Attachments - Preservation Brief 14 Attachment 17 - Historic Structure Report Attachments - Preservation Brief 13 Attachment 16 - Historic Structure Report Attachments - Preservation Brief 4 Attachment 15 - Historic Structure Report Attachments - Preservation Brief 3 Attachment 14 - Historic Structure Report Attachments - Preservation Brief 1 Attachment 13 - Floor Plans for Spine from PPR Appendix C Attachment 12 - Construction Drawings by HDR for Connector to B81 from PPR Appendix C Attachment 11 - Construction Drawings 1960 from PPR Appendix C Attachment 10 - Conceptual Planning Report by Smith Group 2012 from PPR Appendix C Attachment 9 - HVAC Design Data and Sizing Summary for Wing 5 from PPR Appendix A Attachment 8 - HVAC Design Data and Sizing Summary for Wing 4 from PPR Appendix A Attachment 7 - HVAC Design Data and Sizing Summary for Spine from PPR Appendix A Attachment 6 - Geotech Report by JA Cesare from PPR Appendix A Attachment 5 - Geotech Report by Empire Labs for Wing 3 Addition to Building 1 from PPR Appendix A Attachment 4 - Geotech Report by Empire Labs for Wing 1 Addition to Building 1 from PPR Appendix A Attachment 3 - Geotech Report by Empire Labs for South Addition to Building 1 from PPR Appendix A Attachment 2 - Geotech Report by Empire Labs for Rear Addition to Building 1 from PPR Appendix A Attachment 1 - Energy Modeling Data from PPR Appendix A Attachment E - Subcontracting Plan Requirements Amendment A002
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/6de2725b9e758c70b35cf6a8322ae20d)
 
Place of Performance
Address: 325 Broadway, Boulder, Colorado, 80305, United States
Zip Code: 80305
 
Record
SN05456078-W 20190926/190924231012-6de2725b9e758c70b35cf6a8322ae20d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.