Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 13, 2019 FBO #6501
SOLICITATION NOTICE

Z -- REMOVAL OF WOODEN FENCE AND REPLACE WITH PIPE RAIL FENCE TO PROVIDE SECURITY AND SAFETY AT JEFFERSON RIDGE LOOP 3 AT DIERKS LAKE - Package #1

Notice Date
9/11/2019
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
Department of the Army, US Army Corps of Engineers, USACE District, Little Rock, Attn: CESWL-CT, PO Box 867, Little Rock, Arkansas, 72203-0867, United States
 
ZIP Code
72203-0867
 
Solicitation Number
W9127S19Q0069
 
Archive Date
10/5/2019
 
Point of Contact
Cathleen E. Stadler, Phone: 5126186476, Darell Argenbright, Phone: 501-324-6550
 
E-Mail Address
cathleen.e.stadler-frazier@usace.army.mil,
(cathleen.e.stadler-frazier@usace.army.mil, /div)
 
Small Business Set-Aside
N/A
 
Description
Solicitation STATEMENT OF WORK: Contractor shall furnish all materials, equipment, labor and supervision to remove existing wooden fence and install pipe safety rails and concrete to provide safety and security at Jefferson Ridge Loop 3 at Dierks Lake Project. Description/Scope of Work: Locations of pipe barrier are as follows: Map with LAT and Long included: 94.113894/34.151423,94.113561/34151445 1. Contractor shall remove approx. 130 feet of existing wooden fence and dispose of off Govt property. Wood posts will be cut off at ground level and not excavated to prevent damage to underground utilities. 2. Contractor shall provide approximately 130 linear feet of standard guardrail system compliant with 385-1-1 paragraph 21.F.01 in accordance with the attached specification and located where directed by the Contracting Officer. 3. Contractor shall install 3000 PSI, 4 inch min thick concrete with fiber extending from existing concrete to back edge of retaining wall to West end of existing wooden fence. Concrete will also have a 10-12 inch footing along all edges. Area from electric conduit east to light pole will be filled with ¾ grey rock with fines. 4. Concrete shall be broom finished with ½ in slope towards retaining wall to prevent pooling. Contractor shall be responsible for repairing any honeycomb or pooling in concrete 5. Exact Location will be shown at pre-bid site visit. 6. All disturbed ground shall be raked down and debris removed and areas seeded with rye grass and spread hay on disturbed areas. Any debris or trash left as a result of this contract shall be disposed of off of Govt. Property. 7. Contractor shall be responsible for location of all underground utilities and if any are damaged contractor shall be responsible for repairing. 8. Contractor shall adhere to Corps of Engineers Safety Manual 385-1-1 All bidders are encouraged to attend the pre-bid site visit. For more information please Contact Darell Argenbright at 501-324-6550 or cell# 870-784-4857 or for contract information Brandee Wright at 501-340-1466
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA03/W9127S19Q0069/listing.html)
 
Place of Performance
Address: Place of Performance:, Jefferson Ridge Loop 3 at Dierks Lake, LAT and Long included: 94.113894/34.151423,94.113561/34151445, Dierks, Arkansas, United States, Dierks, Arkansas, United States
 
Record
SN05440715-W 20190913/190912053930-7ef64aea6b78117da7de6fcfab0633c6 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.