SOLICITATION NOTICE
J -- OKC Chiller Preventive Maintenance Base Plus Four Option Years (10-1-2019 / 9-30-2024)
- Notice Date
- 8/24/2019
- Notice Type
- Synopsis
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- Department of Veterans Affairs;Network Contracting Office;NCO 19;1011 Honor Heights Drive;Muskogee OK 74401
- ZIP Code
- 80111
- Solicitation Number
- 36C25919Q0555
- Response Due
- 9/3/2019
- Archive Date
- 12/2/2019
- Point of Contact
- Lance.Davis2@va.gov
- Small Business Set-Aside
- Service-Disabled Veteran-Owned Small Business
- Description
- RFI 36C25919Q0440 Page 2 of 2 Chiller Preventive Maintenance Service Oklahoma City VAMC BRIEF SCOPE OF WORK (This is for information only) The contractor shall provide Chiller Preventive Maintenance Services in accordance with the terms and conditions stated within this Statement of Work (SOW). All work shall be coordinated with the Oklahoma City VA Health Care System s COR. INSPECTION SERVICES: General: Contractor shall provide scheduled quarterly and annual preventive maintenance services of chillers and associated equipment as specified within all updated manufacturer specifications and requirements. Chillers are located on 2 campuses: Oklahoma City VAMC 921 NE 13th St Oklahoma City, OK 73014 Lawton Outpatient Clinic 4303 Pitman Street Fort Sill, OK 73503 Contractor shall provide all labor, materials, and equipment necessary for protection of VAMC personnel, furnishings, equipment and buildings from damage, and shall replace or repair any damage due to work performed under this contract equal to its original construction and finish. Contractor must have adequate insurance protection against negligent work and other forms and follow all federal, state, local regulations related to this requirement. All gauging and measurement equipment used shall be calibrated prior to use (within 1 calendar year) according to manufacturer s specifications or a standard traceable to the National Bureau of Standards. Deliverables and Performance: Preventive Maintenance services are to be performed during the following time periods: 1st Quarter: October thru December of contract year. 2nd Quarter: January thru March of contract year. 3rd Quarter: April thru June of contract year. 4th Quarter: July thru September of contract year. Note: Annuals shall occur in 1st or 2nd quarter and the same quarter of each following option year. Maintenance Procedures for York 1000 Ton (2 ea.) & 600 Ton (2 ea.) Chillers: Quarterly Inspection/Service: Check chilled water temperature and pressure. Check condensing water temperature and pressure. Complete required maintenance checklists Check for proper water flow. Check oil heater. Check operation of purge (if applicable). Check for unusual noise and vibration. Check with appropriate customer representative for operational deficiencies. Check refrigerant charge. Check compressor oil level(s). Visually inspect for refrigerant and oil leaks. Check surface condenser and hot well. Check condensate pump and starter (if applicable) and lubricate bearings as required. Check overall condition of unit. Clean area around equipment. Check capacity control and linkage. Annual Inspection: Change oil filter(s). Inspect starter. Check oil heater. Check drive coupling. Lubricate motor bearings. Check overall condition of unit. Check capacity control and linkage. Check safeties. Verify drive alignment. Complete any required maintenance checklists Check compressor oil level(s) Reset purge counter (if applicable) Check and tighten electrical connections. Check with appropriate customer representative for operational deficiencies. Check operating controls. Check speed increaser (if applicable) Check for unusual noise and vibration Clean area around equipment Conduct refrigerant leak check Conduct visual inspection of condenser tubes (head removal by customer) Change purge filter(s) (if applicable) Chiller Tube Brushing (Annual): Check with appropriate customer representative for operational deficiencies Mechanically brush tubes. Replace head Clean area around equipment Remove head Isolate tubes Drain water from tubes Replace gasket Oil Analysis: Remove sample in approved container. Label and complete paperwork indicating present operating conditions Send for analysis. Maintenance Procedures for Carrier 160 Ton (2 ea.) and Trane 100 Ton (1 ea) Chillers: Cooling season start up preparation and inspection (Quarterly): Check auxiliary equipment operation Check refrigerant levels Perform oil analysis. Check the compressor heater, oil temperatures and lube system Check and test all operating and safety controls Check for proper voltage and starter operation Start the chilled and condenser water pumps Start the unit and calibrate controls and transducers Check the proper settings for sub cooling and super heat Log operating conditions after the unit stabilizes Review operating procedures with the operator Remove debris from inside and around the unit Inspect condensing coils for blockage and clean lines Inspect and tighten electrical connections Check the fan and fan motor operation after start up Operating Season Inspections (Quarterly): Check general condition and operation. Log operating conditions and identify inconsistencies Adjust operating controls if required Check for proper oil level and refrigerant charge Check the oil temperature and compressor heater Inspect starter, relays and controls Inspect the air-cooled condenser fans and motor operations Remove debris from inside and around the unit. Review operating procedures and the owner s log with operator Annual Equipment Shutdown Inspection and PM: Meggering and record motor winding resistance Change oil filter Check oil level in lube system; add additional oil as required and conduct an oil acidity test Conduct a leak check; correct leaks; add refrigerant as necessary. Change the filter-dryer Check the crankcase heater for proper operation Tighten power wiring on contactors and in the motor terminal box Clean all contactors and recommend replacement if needed. Check all relays, operating controls and safeties Check and calibrate all controls, safeties, unloaders, and external interlocks Clean condenser coil. Maintenance Procedures for York 50 ton and 25 Ton (1 ea) Chiller: Cooling season start-up preparation and inspection: Check auxiliary equipment operation Check refrigerant levels Check the crankcase heater Check and test all operating and safety controls Check for proper voltage and starter operation Start the chilled and condenser water pumps where applicable Start the unit and calibrate controls and transducers Check the proper settings for sub cooling and super heat Log operating conditions after the unit stabilizes Review operating procedures with the operator Remove debris from inside and around the unit Inspect condenser coils for blockage and clean lines Inspect and tighten electrical connections Check the fan and fan motor operation after start-up Operating Season Inspection: Check general condition and operation. Log operating conditions and identify inconsistencies Adjust operating controls if required Check for proper oil level and refrigerant charge Check the oil temperature and compressor heater Inspect starter, relays and controls Inspect the air-cooled condenser fans and motor operations Remove debris from inside and around the unit. Review operating procedures and the owner s log with operator Annual: Meggering and record motor winding resistance Check oil level in lube system; add additional oil as required and conduct an oil acidity test Conduct a leak check; correct leaks; add refrigerant as necessary. Change the filter-dryer Check the crankcase heater for proper operation Tighten power wiring on contactors and in the motor terminal box Clean all contactors and recommend replacement if needed. Check all relays, operating controls and safeties Check and calibrate all controls, safeties, unloaders, and external interlocks Check the suction and discharge compressor valves Clean condenser coil. CHILLER INVENTORY AND LOCATION: Oklahoma City Campus: York 1000 Ton Chiller Model #: YKKPK4H9 Serial #: SEWM-591880 York 1000 Ton Chiller Model #: YKKPK4H9 Serial #: SEWM-591730 York 600 Ton Chiller Model #: YKGQEP8 Serial #: SAXM-831760 York 600 Ton Chiller Model #: YKGQEP8 Serial #: SAXM-831910 Carrier 160 Ton Chiller Model #: 30HXA161RZE661KA Serial #: 5105Q05873 Carrier 160 Ton Chiller Model #: 30HXA161RZE661KA Serial #: 5105Q05874 York 50 Ton Chiller Model #: YCAL0080SC46XAA Serial #: RCJM4480AA Lawton Outpatient Clinic: Trane 100 Ton Chiller Model #: RTAA1004XFO1A1COB Serial #: U94K24511 York 25 Ton Chiller Model #: YCAL0028EE46XEBSXTX Serial #: YCAL028 SCHEDULING ARRANGEMENTS: Except by special alternative arrangement, scheduled work will be performed only during VAMC s normal working hours (8:00 a.m. to 4:30 p.m. Monday through Friday excluding federal holidays). Contractor shall schedule all work within 1 week of contract award, approved by VA HCS COR. Vendor shall provide at least two weeks notice to the Contracting Officer s Representative (COR) prior to performing the work. Work cannot be scheduled during heavy cooling load periods. Only one chiller at a time can be out of service for the inspection, testing, and calibration procedures. Work must be conducted when the COR or his/her designate is available on site to monitor the work. Check in/out procedures: Prior to commencement of and immediately after each service visit, the contractor and/or contractor s authorized repair technician must check in and out with the VAMC Boiler Plant staff. Due to heightened security requirements, the contractor and/or contractor s authorized service representative will be required to wear an ID Badge which will be signed for upon arrival and turned in when leaving. Location of performance VA Medical Center 921 NE 13th St Oklahoma City, OK 73104 IMPORTANTR NOTE: This RFI (Request for Information) is for information only; no award will be made from this RFI. Please communicate via e-mail to Lance.Davis2@va.gov by COB July 11, 2019 as to your company s ability to perform service per this brief Scope of Work. If interested please provide the following: Please state your company s business size Please provide DUNS number If you have a FSS/GSA contract that includes this service Provide FSS/GSA contract number if applicable NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (24-AUG-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/spg/VA/VARMCCC/VARMCCC/36C25919Q0555/listing.html)
- Place of Performance
- Address: Oklahoma City VA Medical Center;921 NE 13th St;Oklahoma City, OK
- Zip Code: 73104
- Country: USA
- Zip Code: 73104
- Record
- SN05417565-F 20190826/190824230006 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |