MODIFICATION
D -- THE PURPOSE OF AMENDMENT 0006 IS TO EXTEND PROPOSAL DUE DATE FROM 16 AUG 19 TO 30 AUG 19 AND ALSO TO ADD ADDITIONAL TECHNICAL INFORMATION .
- Notice Date
- 8/9/2019
- Notice Type
- Modification
- NAICS
- 517311
— Wired Telecommunications Carriers
- Contracting Office
- Procurement Directorate - DITCO-Scott
- ZIP Code
- 62225
- Solicitation Number
- HC101318QB006
- Response Due
- 8/30/2019
- Archive Date
- 8/30/2020
- Point of Contact
- Mahmood Muhammad,(618) 418-6239;Dale Rupright,(618) 418-6614
- Small Business Set-Aside
- N/A
- Description
- AMENDMENT 0006 IS TO EXTEND PROPOSAL DUE DATE FROM 16 AUG 19 TO 30 AUG 19 AND ALSO TO ADD ADDITIONAL TECHNICAL INFORMATION. "DUE TO THE CUSTOMER AT THE PT LOMA LOCATION HAVING MULTIPLE CONNECTIONS ON SITE THAT NEED TO HAVE DIFFERENT FIBER ROUTES TO THE PROPOSED MPOP IN BLDG 24 ROOM 226A. A. THE GOVERNMENT IS REQUESTING THE WINNING VENDOR COORDINATE WITH POINT LOMA SPAWAR GOVERNMENT OUTSIDE PLANT SITE POC MR. BILL EGAN (619) 553-5262 B. PROVIDE AND PULL FIBER STRANDS FROM THE POINT LOMA PROPOSED COMMERCIAL DEMARC IN BLDG 24, 226A THROUGH EXISTING SITE PROVIDED CONDUIT INTERDUCT SYSTEM AS DIRECTED TO BLDG C60, ROOM 104. C. PROVIDE AND PULL FIBER STRANDS FROM THE POINT LOMA BLDG A-33, ROOM 1223 THROUGH EXISTING SITE PROVIDED CONDUIT INTERDUCT SYSTEM AS DIRECTED TO BLDG C60, ROOM 104. N. D. THE VENDOR WILL HAVE TO ROD AND ROPE AS NEEDED AND PROVIDE TRAIL ROPE. ADDITIONALLY THIS WILL REQUIRE THE WINNING VENDOR TO INSTALL A FIBER DISTRIBUTION PANEL IN BLDG 24, COMM ROOM; IN BLDG C60, ROOM 104, AND BLDG A33, ROOM 1223. TERMINATE AND TEST EACH PAIR, AND LABEL EACH FIBER BY THEIR ASSIGNED NUMBERS ON EACH FIBER PANEL IN BLDG 24, BLDG C60 AND BLDG A33. E. SSCPAC RDT&E NETWORKS CODE 82700 GOVERNMENT SITE PERSONNEL WILL SIGN OFF THE INSTALLATION WAS COMPLETED IAW THIS TSR. THE FIBER WILL BECOME GOVERNMENT OWNED AND WILL BE MAINTAINED BY POINT LOMA SSCPAC RDT&E NETWORKS CODE 82700 OUTSIDE PLANT SPAWARS PERSONNEL. F. THE TELECOMM PROVIDER MUST INSTRUCT THEIR SUBCONTRACTOR/SUBCONTRACTORS THAT THEY WILL BE REQUIRED TO PERFORM AND ABIDE BY ALL SAFETY PRACTICES AS DIRECTED BY PT. LOMA GOVERNMENT SPAWAR PERSONNEL WHILE WORKING IN THE MAN HOLES, INCLUDING GAS FREE VENTILATION, PROPER TRAFFIC CONTROL, RIGGING OF SAFETY HARNESS'S AND TRIPOD. G. TYPE OF FIBER TO BE INSTALLED: 288-STRAND CORNING ALTOSR LOOSE TUBE, GEL-FREE, ALL-DIELECTRIC CABLE WITH FAST ACCESS R TECHNOLOGY, 216 F, SINGLE-MODE (OS2) FIBER SUPPLIED IN A DRY BLOCK ALL-DIELECTRIC OUTDOOR CABLE. CABLE CONSTRUCTION MUST MEET ANSI/CERA S-87-640-1999 STANDARD FOR OPTICAL OUTSIDE PLANT COMMUNICATIONS CABLE. THE CABLE SHALL BE AN ACCEPTED PRODUCT OF THE US DEPARTMENT OF AGRICULTURE RURAL UTILITIES SERVICE (RUS) 7 CFR 1755.900 (PE-90) AND MEET THE REQUIREMENTS OF ANSI/ICEA STANDARD FOR FIBER OPTIC OUTSIDE PLANT TELECOMMUNICATIONS CABLE, ANSI/ICEA S-87-640-2006. CABLE JACKETS SHALL BE MARKED WITH THE MANUFACTURER'S NAME, MONTH AND YEAR OF MANUFACTURE SEQUENTIAL METER OR FOOT MARKINGS, A TELECOMMUNICATION HANDSET SYMBOL AS REQUIRED BY SECTION 350G OF THE NATIONAL ELECTRICAL SAFETY CODE (NESC), FIBER COUNT AND FIBER TYPE. H. INSTALLATION AND TESTING OF FIBER INSTALLATION ON POINT LOMA BETWEEN BLDG 24 TO BLDG C60 AND BLDG A-33 TO BLDG C60: I. SINLGE MODE FIBER OPTICS INSIDE PLANT (ISP) AND OUTSIDE PLANT (OSP) SOW: TO BE CONSTRUCTED, INSTALLED, TESTED AND COMMISSIONED IN ACCORDANCE WITH GENERIC CABLING REQUIREMENTS SPECIFIED IN ANSI/TIA 568. SPECIFIC FIBER OPTIC REQUIREMENTS SHALL BE AS DESCRIBED IN ANSI/TIA 568-C.3.THE TESTING MUST BE EXECUTED BY TRAINED TECHNICIANS WHO HAVE SUCCESSFULLY ATTENDED AN OPTICAL FIBER TESTING TRAINING PROGRAM WHICH INCLUDES TESTING WITH AN OPTICAL LOSS TEST SET (OLTS) AND AN OPTICAL TIME DOMAIN REFLECTOMETER (OTDR). THE TECHNICIANS MUST HAVE OBTAINED A CERTIFICATE AS PROOF THEY ATTENDED THE STATED TRAINING. J.THE FOLLOWING IS SUBMITTED FOR ADDITIONS AND CLARIFICATION: FIBER TYPE: CONVENTIONAL SINGLE MODE-NON DISPERSION-SHIFTED FIBER (DSF) CABLE CONSTRUCTION AND MATERIALS TO BE SUITABLE FOR THE ENVIRONMENT, PURPOSE AND MUST BE ACCEPTABLE TO PT LOMA GOVERNMENT SITE PERSONNEL. -OLTS AND OTDR TESTING EQUIPMENT MUST BE UTILIZED. -FIBER ATTENUATION MUST BE <=0.35 DB/KM AT 1310NM AND <=0.25 DB/KM AT 1550NM. -FIBER OPTIC CONNECTORS-FUSION SPLICE THE PIGTAILS WITH "SC" CONNECTORS. -FUSION SPLICING MUST BE USED EXCLUSIVELY. -INDIVIDUAL SPLICE LOSS TO BE TO BE <0.3 DB/SPLICE. -INDIVIDUAL CONNECTOR LOSS TO BE <0.6DB/SPLICE. -NUMBER OF SPLICES AND CONNECTORS TO BE MINIMIZED ACCORDING TO INDUSTRY-STANDARD "BEST PRACTICES".-TESTING AND PRESENTATION/DELIVERY OF TEST REPORTS SHALL BE AS OUTLINED IN ANSI/TIA 568-C.3 ANNEX E". EVERYTHING ELSE REMAINS THE SAME** *RECAP* **THE PURPOSE OF AMENDMENT 0005 IS TO RE-SOLICIT THIS REQUIREMENT AS FULL AND OPEN FOR AN ADDITIONAL 14 DAYS, FROM 2 AUG 19 TO 16 AUG 19 THE SERVICE DATE IS EXTENDED FROM 19 SEP 19 TO 2 DEC 19. EVERYTHING ELSE REMAINS THE SAME.**" *RECAP* **HC101318QB006 MOD 0004 ISSUED TO EXTEND THE PROPOSAL DUE DATE FROM 17 DEC 18 TO 14 JUNE 19 AT 12:00 PM. ADDITIONALLY, TO EXTEND SERVICE DATE FROM 14 FEB 19 TO 19 SEP 19. CHANGE THE ACQUISITION STRATEGY TO FULL AND OPEN COMPETITION (517311) VICE PREVIOUSLY THIS WAS A SMALL BUSINESS SET ASIDE ACQUISITION STRATEGY (517911). ALL ELSE REMAINS THE SAME. ** THE PURPOSE OF THIS AMENDMENT IS TO ATTACH SP 39, WHICH WAS LEFT OFF THE PRIOR SOLICITATION. ALL ELSE REMAINS THE SAME. RECAP THE PURPOSE OF THIS AMENDMENT IS TO CHANGE THE PROPOSAL DUE DATE TO 17 DEC 18 AT 4:00 P.M. (CST). ALL ELSE REMAINS THE SAME. RECAP 1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 10 GB (GIGABIT ETHERNET) IP BACKBONE CIRCUIT BETWEEN THE J-PE ROUTER (UJEWPLO040) IN BLDG 24A, RM 226A, 53690 TOMAHAWK DRIVE, SAN DIEGO, CA, 92147-5004 AND J-PE ROUTER (UJEWVAN040) IN BLDG 10525, RM 30, 723 NEBRASKA AVENUE, VANDENBERG AFB, CA 93437-6120. **SEE ATTACHED FOR OTHER IMPORTANT TECH SPECS** **CONTRACTORS SHALL MEET RTD OF 10 MILLISECONDS** SEE UNIQUE INSTALL FACTORS. **VENDORS MUST CLEARLY STATE IN QUOTES THEIR COMPLIANCE WITH GOVERNMENT TESTING AND ACCEPTANCE REQUIREMENTS.** 2. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE. FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD. 3. THE SERVICE DATE TO BE MET IS: 10 SEP 19 (SIP). THE GOVERNMENT ASSUMES THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS. 4. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER, THEY MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING QUOTES. QUESTIONS SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE POSTED TO FEDBIZOPPS. QUOTES MUST BE UPLOADED TO IDEAS. IN THE EVENT IDEAS IS UNAVAILABLE OR QUOTES FAIL TO UPLOAD, QUOTES MAY BE SENT TO THE FOLLOWING MAILBOX: DISA SCOTT AFB DITCO MAILBOX VENDOR QUOTES disa.scott.ditco.mbx.vendor-quotes@mail.mil. 5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION HC101318QB007/TSR RU30APR185912 AND MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM TSR RU30APR185912; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR RU30APR185912. 6. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE INCLUDED THE ATTACHMENTS. 7. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM, CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (09-AUG-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/spg/DISA/D4AD/DITCO/HC101318QB006/listing.html)
- Record
- SN05400393-F 20190811/190809230050 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |