SOLICITATION NOTICE
S -- Inspect and clean Water Tanks
- Notice Date
- 8/1/2019
- Notice Type
- Synopsis
- NAICS
- 332420
— Metal Tank (Heavy Gauge) Manufacturing
- Contracting Office
- 10-020 Kabrich Circle Pine Bluff AR 71602-9500
- ZIP Code
- 71602-9500
- Solicitation Number
- W911RP-19-R-0003
- Response Due
- 7/15/2019
- Point of Contact
- Retha J. Sprinkle, Contract Specialist, Phone 8705404054, Fax 8705404090
- E-Mail Address
-
retha.j.sprinkle.civ@mail.mil
- Small Business Set-Aside
- Total Small Business
- Description
- PERFORMANCE WORK STATEMENT PROVIDE CLEANING AND PAINTING OF PBA ABOVE GROUND WATER TANKS Directorate of Public Works Engineering Plans and Services Division Pine Bluff Arsenal 10020 Kabrich Circle Pine Bluff, Arkansas 71606-9500 May 1, 2019 1.0 Background Pine Bluff Arsenal (PBA) is 35 miles southeast of Little Rock and 8 miles northwest of Pine Bluff. PBA is bordered on the east by the McClellan-Kerr Arkansas River Navigation System and on the west by the Union Pacific Railroad and US Highway 65, making it directly accessible by rail, road, or waterway. The installation is 8 1/2 miles long by 2 3/4 miles wide and covers 14,944 acres. It includes 952 buildings which provide 3.3 million square feet of floor space. It also has 42 miles of railroad track and 2 million square yards of roads and paved surfaces. Overall population consists of approximately 800 government civilian employees, contractor personnel, and military personnel. PBA manufactures, smoke, riot control, incendiary, and pyrotechnic mixes and munitions. Limited production facilities are used to manufacture chemical defense items such as clothing and protective masks. Pine Bluff is the only active site at which white phosphorous-filled weapons are loaded. 2.0 Purpose This project will correct deficiencies and improve the safety of the PBA water system. 3.0 Summary of Work The purpose of this Statement of Work (SOW) is to provide the following services: • Clean, wash out, and remove sediment in the six 200,000 gallon above ground water tanks at PBA. • Lead paint abatement of tank A (53-180) on north end of PBA. • Repaint tank A. • Install keyed locks • Install slider fall protection The activities will be performed in a manner as to NOT negatively impact the operations of PBA. Work shall be done in such a manner that work is performed on one tank at a time and that the tank shall be placed back in service before work begins on the next tank. PBA shall have five water tanks available at all times to supply water to PBA. 4.0 Description of Work Contractor shall provide all necessary labor, personnel, facilities, equipment, transportation, scheduling, supervision, materials and disposal to complete the tasks identified in the SOW. All work shall be performed in accordance with standards established by the American Water Works Association (AWWA). Contractor shall provide and install keyed lock and ‘confined space entry' placards for the 27"-30" steel water access hatches on each of the six water tanks. Contractor shall provide and install slider fall protection for the water access ladders on each of the six water tanks. Contractor shall wash out and clean all six 200,000 gallon elevated tanks at PBA. The six 200,000 gallon storage tanks shall be cleaned to the metal utilizing sand blasting or other approved methods (chemical stripping if environmentally approved). Paint chips shall be recovered and disposed of in accordance with environmental regulations. Sandy silt sediment buildup (generally ranging from 2 to 6 inches) shall be removed from the floor plates of all six tanks. Inspect all cathodic protection systems on each tank prior to draining of tank. After refilling of tank, cathodic protection will be re-started and re-tested for proper operation. A report on the condition of the cathodic protection shall be included in the final report. Contactor shall perform lead abatement on Tank A (53-180) and dispose of all paint chips in accordance with environmental regulations. After the lead abatement, the contractor shall repaint Tank A. PBA conducted a test of lead containing materials (LCM) of the paint on Tanks A, B, and C on 30 Aug 2017. The results are found in the Memo dated 10 Oct 2017 as Attachment B. Tank A had a test result of 6.4% by weight of LCM. Contractor shall supply formal monthly progress reports to Arsenal Project Manager (PM) and Arsenal Point of Contact (POC) in the format specified by the Contracting Officer Representative (COR). These progress reports will include written and verbal communications and document to whom and when the communications were supplied. The Progress Review meetings are defined in Table 1 and will occur every 45 days. The Contractor shall provide an electronic copy of all progress reports to the Contracting Officer (KO), COR and Arsenal Project Manager (PM). All meeting minutes will be taken by the Contractor and distributed to the Arsenal POCs and KO no later than 2 calendar days following meeting dates. The Contractor shall conduct a kick-off meeting no later than 5 days from the Notice To Proceed (NTP). This meeting will include a complete overview of the project and implications and be presented to relevant Arsenal staff and POCs. Contractor shall notify all POCs immediately of any and all issues which may result in a delay of the project and/or impact quality of the work. If any leaks or damage are found and require immediate repairs the Contractor shall contact the COR and report the urgent condition during duty hours; if discovered during off-duty hours, contact the Operations Center at 870-540-2700. 5.0 General Requirements Contractor shall conduct all Progress Review meetings and shall provide an agenda and topics for consideration. Contractor shall be responsible for meeting minutes and distribution of documents to all POCs. Contractor shall perform field reconnaissance, surveys, site investigations, and work required to obtain engineering information, existing utilities and easements, and design data for the accomplishment of the contract documents of the project in accordance with requirements of this SOW. Contractor shall conduct field investigations to verify dimensions for each tank and operations and other information shown on existing record drawings. Contractor shall document all discrepancies found compared to Arsenal utility drawings. Excavation is not necessarily required, but if required, Contractor must obtain appropriate digging permits prior to commencing excavation. All submittals shall be well-prepared, complete, and accomplished in accordance with the best professional practice to show clearly and concisely the type and extent of work to be performed. Submittal package shall be on 8 ½" x 11" paper, arranged by equipment installed, and support all design decisions made throughout the project. The package shall include calculations, material cut sheets, and explanations of any options considered. In general, Contractor should indicate the make, model number, etc., of all equipment to be purchased and installed. All materials, components, and equipment shall be specified for approval by the Government Contracting Officer. 6.0 Government Furnished Material (GFM) Arsenal drawings shall be supplied as requested and upon availability. All GFM utilized during any part of the performance of this project MUST be returned to the Arsenal POC upon completion of this contract. 7.0 Water System Description The utility provides potable water use to the base administration, industrial operations, and emergency support areas within the PBA Federal Reserve. The PBA water system includes facilities for producing, storing and conveying potable water for sanitation and fire support. All components of the system lie within the installation boundaries and rely on Army protective services for site and system security. The system is operated by the Directorate of Public Works. The PBA water treatment plant operates at approximately 0.7 MGD and is rated at 1.4 MGD. The Water Treatment Plant (WTP) is a settling basin-filter plant operation. The plant uses alum and polymer to promote sedimentation. The WTP incorporates a 30-foot aerator to promote reduction of iron. The system uses lime for pH control and injects chlorine gas for disinfection. The WTP uses 8 sand pressure filters for filtering water. There is a meter vault on site. Raw water enters a common header just prior to metering. Isolation of any raw-water pump, and bypass of any operation, either at the meter vault, or at a separate valve vault, is possible. Bypass from the meter vault directly to the sedimentation basin is also possible. There is a 30 foot, 1,200-gpm aerator that provides rapid mix for alum, the polymer, and chlorine gas. Alum, lime, and polymer are housed near the sedimentation basin, and the system uses flow paced metering equipment, within the housing, to supply injectors at the aerator, or at the sedimentation basin. There are 20 each 150-lb, chlorine gas cylinders at the WTP, at any one time. The cylinders, vacuum regulator, and metering equipment are housed in a secured chlorine building. An underground line supplies gaseous chlorine to injectors, at the bottom of the aerator. There is a 47-foot diameter, 12 foot-deep, 168,000 gallon clear well with exposed top, located adjacent to the sedimentation basin. There is a low-level auto-shutoff of service pumps from the clear well, but no low-level alarm at the clear well. There is a 47 foot diameter, 15-foot-deep, 218,000 gallon sedimentation basin with exposed top. Influent enters the center and effluent exits over a perimeter overflow weir. There is a WTP pump and filter building. The building houses two dedicated service pumps, two dedicated filter-backwash pumps, a diesel emergency service pump, and eight pressure filters. There are two 1,200-gpm service pumps. Two 700-gpm pumps remain from the original system, and are now dedicated for filter backwash. The diesel power service pump is rated to 1,200-gpm, and is exercised regularly. Any of the pump-station pumps can be used for service or backwash capabilities. The eight pressure filters, on a common header, are backwashed twice daily. There are three circular chart recorders, one each for the pumping rate, the clear well level, and the south (#3) elevated tank level. There is a wireless digital recorder to monitor the north ("C") elevated tank level. There is a pad-mounted dedicated diesel-powered generator located 100 feet north of the WTP. The generator is exercised regularly, and has been used to run the entire WTP and raw-water wells on numerous occasions, including a 5-day ice storm. The WTP and raw-water wells are located within the production area and are surrounded by an interior guarded perimeter with chain link fence. In the WTP yard, below ground, is an abandoned 7MG reservoir. 8.0 Distribution Systems The looped Production and Depot systems have separate yet similar distribution systems and pressure planes. Each pressure plane (north and south), has three 200,000 gallons elevated tanks. The total elevated tank storage for north and south is 1.2 MG. In the Production area the 3 tanks are on a 16-inch-diameter common header that also connects the WTP. In the Depot area, the northern tank ("C") is connected to a booster pump via a 16-inch line. The booster pump station consists of two 1,060 gpm pumps. Each distribution system has numerous 8- and 10-inch-diamter loops that supply various subareas. The loops and headers have multiple isolation valves, and fire hydrants. In the Depot area, these smaller diameter loops, also supply two of elevated tanks ("A" and "B"). There is a single un-looped 12-inch-daimeter line to the Demilitarization area. The two areas are protected by a backflow preventer. There is a single un-looped, 8-inch-diameter line to the Landfill area. 9.0 Deliverables Period of Performance. Contractor shall begin work as described in the PWS within 5 days of NTP. All meetings and progress reports are due in a timely fashion and will begin no later than 30 days of NTP. The entire project shall be completed with 180 calendar days from NTP. Deliverable Frequency Media POC Final Report 1 time only Electronic, 2 Hard Copy KO, COR, PBA POCs Monthly Reports Monthly Electronic KO, COR, PBA POCs Progress Review Reports As required Electronic KO, COR, PBA POCs Meeting Minutes As required Electronic KO, COR, PBA POCs Progress Review Meetings Meeting Title Performance Threshold 1 Progress Review 1 Within 45 days of NTP 2 Progress Review 2 Within 45 days of Progress Review 1 3 Progress Review 3 Within 45 days of Progress Review 2 Close Out Within 45 days of final scope of work item completion Note: Arsenal POCs should receive the meeting minutes and transmittal cover letter only for all other deliverables. Monthly status reports shall be submitted electronically to the government POCs listed below. 10.0 Government Points of Contact (POC) Contracting Officer (KO): Name: Sean Connelly Title: Mechanical Engineer Address: 10-020 Kabrich Circle Pine Bluff, AR 71602 Comm: 870-540-2927 DSN: Fax: E-mail: sean.m.connelly16.civ@mail.mil Contracting Officer's Representative (COR): Name: Richard Colburn Title: COR Address: 10-020 Kabrich Circle Pine Bluff, AR 71602 Comm: 870-540-3289 DSN: 966-3289 Fax: 870-540-3251 E-mail: Richard.p.colburn.civ@mail.mil Project Manager (PM)/Alternate Contracting Officer's Representative (ACOR) Name: Clayton Ferrell Title: COR Address: 10-020 Kabrich Circle Pine Bluff, AR 71602 Comm: 870-540-3234 DSN: 966-3234 Fax: 870-540-3251 E-mail: clayton.d.ferrell.civ@mail.mil 11.0 Applicable Standards American Water Works Association (AWWA) standards American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) and Sheet Metal and Air Conditioning Contractors' National Association (SMACNA) mechanical systems standards National Electrical Code, National Fire Protection Association (NFPA) No. 70 Institute of Electrical and Electronics Engineers (IEEE) National Electrical Safety Code National Fire Protection Association (NFPA 101) Life Safety Code Uniform Building Code (UBC) Uniform Federal Accessibility Standard (UFAS) Uniform Mechanical Code (UMC) Uniform Plumbing Code (UPC) Applicable state, city and PBA codes and regulations Unified Facilities Criteria (UFC) 3-230-02, O&M: Water Supply Systems UFC 3-230-03A, Water Supply UFC 3-230-04A, Water Distribution UFC 3-230-10A, Water Supply: Water Distribution UFC 3-230-19N, Water Supply Systems UFC 3-420-01, Plumbing Systems 12.0 Additional Information Recognized Holidays. Facilities will be closed on Federal Holidays. If a holiday falls on a scheduled service day, the contractor shall reschedule in the same week to either the workday preceding or following the holiday. The scheduled holidays are: New Year's Day Labor Day Martin Luther King Jr.'s Birthday Columbus Day President's Day Veteran's Day Memorial Day Thanksgiving Day Independence Day Christmas Day Hours of Operation. The contractor is responsible for conducting business between the hours of 7:00 A.M. to 3:30 P.M., Monday thru Thursday. When an unforeseen facility closure, inclement weather, or other event found to be an acceptable delay by the KO precludes completion of services on a regularly scheduled workday, the KO shall have the following options: Reschedule the work to be performed the following day, or other day as determined by the KO; or, forego the work and reduce the contract price to reflect the reduced value of the services performed. Place of Performance. The work to be performed under this contract will be performed at Pine Bluff Arsenal; postal address is U.S. Army, Pine Bluff Arsenal, 10020 Kabrich Circle, Pine Bluff, Arkansas 71602-9500. The Arsenal is located off Interstate Highway 530, about 12 miles west of Pine Bluff and 35 miles southeast of Little Rock. Service locations are across the installation. Physical Security. The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured. Passes and Badges. All contractor employees shall obtain the required employee passes. The contractor shall, prior to the start of the contract, submit to the KO an estimate of the number of personnel expected at any one time on the contract. The Government will issue badges without charge. Each employee shall wear the Government issued badge over the front of the outer clothing. The contractor shall return the employee's pass and badge within five (5) days when an employee leaves the contractor's service. The contractor will be assessed $44.00 for each employee pass and badge not returned to the Government. Passes and badges issued to contractor employees shall not negate the requirement for employee identification required in the "Identification of Contractor Employees" paragraph. The company name shall be displayed on the contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate and shall be maintained in good repair. Privately owned vehicles are allowed at this job site. Anti-Terrorism and Operations Security. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at https://atlevel1.dtic.mil/at. The contractor and all associated subcontractors' employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office or Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees' commencing performance, with the results reported to the COR no later than 40 calendar days after contract award. All technical data included in this solicitation for bid or performance/scope of work is covered under Army Regulation (AR) 530-1, Operations Security (OPSEC) and the Pine Bluff Arsenal (PBA) OPSEC Plan. Information will not be released to additional subcontractors or the general public without prior approval from the applicable PBA OPSEC Action Officer (OAO), the PBA OPSEC Officer and applicable Public Affairs Officer. Contract awardee will be required to submit written documentation explaining procedures to be taken by awardee for the protection of this information. This documentation (titled {Name of Contract Individual/Company} OPSEC Plan for Contract Number: ______) will be submitted through the PBA Contracting Officer or his/her designated representative through applicable OAO, to PBA OPSEC Officer for review and approval. Documentation will be submitted no less than ten (10) working days prior to contractor accessing controlled and/or sensitive information protected under AR 530-1 and the PBA OPSEC Plan. Contract work will not commence until written protective procedures have been approved by PBA OAO and PBA OPSEC Officer. Access by contractor to this protected information prior to approval will be in violation of contract. Post Award Conference/Periodic Progress Meetings. The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The KO, KOs representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the KO/COR will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government. Contracting Officer's Representative (COR). The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assure that the contractor performs the technical requirements of the contract; Perform inspections necessary in connection with contract performance; Maintain written and oral communications with the contractor concerning technical aspects of the contract; Issue written interpretations of technical requirements, including Government drawings, designs, specifications; Monitor contractor's performance and notifies both the KO and contractor of any deficiencies; Coordinate availability of government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. Key Personnel. The Government considers the contract manager and alternate contract manager to be key personnel. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the KO. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager and alternate(s) must be able to read, write, and speak English. Identification of Contractor Employees.. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. All contractor and subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for Arsenal badges. Fire Protection. The contractor and his/her employees shall know where fire alarms are located and how to turn them on. Contractor employees operating critical equipment shall be trained to properly respond during a fire alarm or fire per local activity instructions. Accounting For Contract Services. The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://cmra.army.mil The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including subcontractors); (6) Estimated direct labor dollars paid this reporting period (including subcontractors); (7) Total payments (including subcontractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each subcontractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (11) Locations where contractor and subcontractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website)' (12) Presence of deployment or contingency contract language; and (13) Number of contractor and subcontractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor's systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site. No fire or flame producing device will be used on the Arsenal without prior approval of the KO/COR and the Fire Chief. Smoking will be permitted only in authorized/designated smoking areas with the approval of the KO/COR. Smoking is not permitted inside or within 50 feet of any Arsenal building. Environmental Protection. The contractor shall comply with all applicable federal, state, and local laws, and with the regulations and standards referenced in AR 200-1 and AR 200-2. All environmental protection matters shall be coordinated with the KO/COR. In the event that a regulatory agency assesses a monetary fine against the Government for violations caused by contractor negligence, the contractor shall reimburse the Government for the amount of that fine and all other costs. The contractor shall also clean up any oil spills that result from the contractor's operations. The contractor shall comply with the instructions of the Environmental Protection Coordinator with respect to avoidance of conditions which create a nuisance or which may be hazardous to the health of military or civilian personnel. Safety Requirements. The contractor shall comply with local, state, and Federal Occupational Safety and Health requirements and provide report of accidents and citations to the KO/COR within 72 hours of occurrence. Prior to commencing work, the contractor shall meet with the KO/COR to discuss and develop mutual understandings relative to administration of the Safety Program. All contractor personnel shall receive the Pine Bluff Arsenal General Safety Briefing prior to reporting to work. If proof of briefing attendance cannot be provided for any employee, that employee shall not be available to work until proof of attendance is provided. Time and location of briefing will be provided to the contractor at the Post Award meeting. The contractor shall ensure compliance with PBA Policy Letter 385-3, "Wearing of Safety Clothing and Equipment in Manufacturing Areas of Pine Bluff Arsenal". All contractor personnel will comply with ANSI Z133.1; wear reflective bright orange or lime green vests while conducting operations on roadways. The contractor shall ensure compliance with the Hazard Communication Standard, 29 CFR 1910.1200 and provide the COR with verification that each contract employee has been provided this training prior to beginning work on the installation. The COR will provide site specific hazard communication information as requested by the contractor. The contractor's workspace may be inspected periodically for OSHA and Army violations. Abatement of violations will be the responsibility of the contractor and/or the Government as determined by the KO. The contractor shall provide assistance to the Safety Office escort and the federal or state OSHA inspector if a complaint is filed. Any fines levied on the contractor by federal or state OSHA offices due to safety/health violations shall be paid promptly. Equipment shall be maintained in a safe operating at all times. Equipment shall be stored in the areas so designated. The contractor shall secure vehicles and mobile equipment by removing the keys from key operated ignition or by other physical means when not in use. Electrical equipment must operate using existing building circuits. The contractor shall prevent the operation of electrical equipment which requires power exceeding capacity of existing building circuits. Work sites shall be kept free of debris and material which could cause injury to workmen or others in the area. When deemed advisable by the KO/COR, signs shall be posted to warn of specific hazards. Hoists, cranes, derricks, or similar equipment shall not be operated where it is possible to bring any part of the machine, suspended load or lines closer than ten (10) feet to powerlines unless the lines have been de-energized and grounded. Such other safety measures as the KO/COR may determine to be reasonable and necessary for the protection of personnel and property will be enforced. 13.0 Environmental Requirements 1. Compliance with Environmental Laws and Regulations: The contractor shall comply with all applicable federal, state, and local laws, and with the regulations and standards referenced in AR 200-1 (http://armypubs.army.mil/epubs/pdf/R200_1.pdf) and AR 200-2 (http://www.benning.army.mil/garrison/DPW/EMD/content/PDF/ar2002.pdf). 2. Compliance with Green Procurement Requirements: Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for-Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse. 3. Compliance with License and Certification Requirements: Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award. 4. Notification of Federal and State Regulators: Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival on site of any Federal, State, and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from a Federal or State environmental agency. 5. Inspections of Work Sites: Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality. 6. Reporting Noncompliance: Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and DGR. 7. Verification of National Environmental Policy Act Documents: Contractor shall obtain from the COR or DGR, a copy of AMC's National Environmental Policy Act Policy and 32 CFR 651 which addresses actions to be taken by contractor. These documents include but is not limited to the analysis-associated decision document of an Environmental Impact Statement and Record of Decision; Environmental Assessment and Finding of No Significant Impact or Notice to Proceed; or Record of Environmental Consideration on the proposed contract actions prior to commencement of such actions. 8. Conformance with Environmental Management System: Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment. 9. Assignment of Environmental Compliance Designee (ECD): N/A 10. Competency Training for Contractor Personnel: Contractor shall not allow personnel to perform any activities and/or tasks on AMC installations without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance. 11. Generation of Solid Waste: Contractor shall remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility. 11.1 Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy. 11.2 Prior to removing any waste from the installation for disposal, the Contractor shall coordinate with the installation Qualified Recycling Program (QRP) Manager, DGR, and COR to arrange for recyclable materials to be removed and diverted from the waste stream. 11.1 Submit in writing the quantities of waste removed and recycled to the DGR and/or COR on a monthly basis. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and the quantities of materials disposed/recycled by weight. 11.4 The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials. 11.5 The Contractor shall make maximum effort to reduce and prevent waste. 12. Generation of Hazardous Waste: N/A 13. Use of Hazardous Materials: N/A 14. Prevention of Storm Water Pollution: The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the Pollutant Discharge Elimination System general permit requirements. Applicable permits include: 1) The installation's Small Municipal Separate Storm Sewer System (MS4) Permit; 2) The Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activities (MSGP); and, 3) All Construction Activity Storm Water permits minimum control measures include, but not limited to: • Public Education and Outreach on Storm Water Impacts • Public Involvement and Participation • Illicit Discharge Detection and Elimination • Construction Site Storm Water Run-off Control • Post Construction Storm Water Management in New Development and Redevelopment • Pollution Prevention/Good Housekeeping for Municipal Operations Contractors will comply with the MSGP permit when the activity is identified as a permitted industrial activity. BMPs include, but are not limited to: • Practicing spill prevention and good housekeeping. • Installing and managing erosion and sediment control. • Meeting the requirements of the MS4 permit. • Contractors will obtain permit coverage for construction activities disturbing over one acre of land (total acreage is cumulative across all portions of the project). BMPs include, but are not limited to: • Preparing and implementing a site-specific Storm Water Pollution Prevention Plan (SWPPP) as outlined in the permit and prior to any soil disturbance. • Installing and managing erosion and sediment control. • Make available, upon request, permit associated documentation. • Practicing spill prevention and good housekeeping. • Meeting the requirements of the MS4 permit. • Schedule inspections and provide corrective actions for noted deficiencies. 15. Storm Water Management Low Impact Design/Development (LID): N/A 16. Use of Pesticides: N/A 17. Protection of Work Site Resources: N/A 18. Prevention of Spills: Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department). 19. Protection of Sensitive Areas: Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, foot traffic) are prohibited. The Contractor shall also adhere to the following installation sensitive areas requirements: 19.1. Cultural Resources Sites: Do not excavate, remove, damage, or otherwise deface any archeological resource located on public lands. 19.2 Endangered Species Habitats: Do not initiate any action that may disturb, endanger, or damage to any degree the habitat of a threaten and endangered species. 19.3 Wetlands: Do not excavate or take any action that could fill or damage any wetland unless working under a project specific Corps of Engineers 404 permit. Wetlands include streams, riparian areas, bogs, marshes, and swamps. 20. Corrective Action for Noncompliance: Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken. 21. Noise: Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times. Pile-driving operations shall be coordinated through the DGR and COR. 22. Mercury: Mercury is prohibited, unless specified otherwise, and with the exception of mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers is prohibited. Remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition for disposal as directed. Immediately report to the DGR and COR instances of breakage or mercury spillage. Clean mercury spill area to the satisfaction of the Contracting Officer. Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal. 23. Universal Waste / e-Waste Management: Universal waste including but not limited to some mercury containing building products such florescent lamps, mercury vapor lamps, high pressure sodium lamps, CRTs, batteries, aerosol paint containers, electrical equipment containing PCBs, and consumed electronic devices, shall be managed in accordance with applicable environmental law and installation instructions. 24. Pollution Prevention / Hazardous Waste Minimization: Minimize the use of hazardous materials and the generation of hazardous waste. Consult with the Environmental Office for suggestions and to obtain a copy of the installation's pollution prevention/hazardous waste minimization plan for supporting waste minimization goals. Contractor Management Reporting (CMR). The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor shall report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor shall completely fill in all the information in the format using the following web address https://cmra.army.mil/default.aspx?ReturnUrl=%2F. The required information includes. (1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative (COTR) or also known as the COR; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-contractors); (7) Total payments (including sub-contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor's system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.Clean and Inspect Water Tanks at Pine Bluff Arsenal. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (01-AUG-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/notices/bc6111237c98d6a4eee63e1e01cebfe0)
- Place of Performance
- Address: Pine Bluff, AR
- Zip Code: 71602
- Country: US
- Zip Code: 71602
- Record
- SN05388794-F 20190803/190801230005 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |