SOLICITATION NOTICE
Y -- FSR 49 MP 0.6 (Sloan Creek Rd)
- Notice Date
- 4/17/2019
- Notice Type
- Synopsis
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 2930 Wetmore Avenue Ste 3A Everett WA 98201
- ZIP Code
- 98201
- Solicitation Number
- 1205M619Q0026
- Point of Contact
- Brian A. Johnson, Contract Specialist/Contracting Officer, Phone 4257836056, Fax 4257830129
- E-Mail Address
-
brian.johnson3@usda.gov
- Small Business Set-Aside
- Total Small Business
- Description
- SCOPE OF CONTRACT : The project work includes, but is not limited to: installing and removing traffic control devices, clearing, grubbing, excavation, culvert removal / disposal, placing geotextiles, hauling and placing base and surface course materials as well as riprap, installing a culvert, and seeding & mulching. PROJECT LOCATION : Washington State (Snohomish County). Coordinates: T30N, R11E, Sec10 Lat 48°06'03"N Long 121°22'44"W. Directions: From the Darrington Ranger District office travel East on State Hwy 20 (Moore St) for 16.3 miles. Continue Straight onto Mountain Loop Highway for 15.8 miles. Turn left onto FSR 49 (Sloan Creek Rd) and continue for 0.6 miles to the project site. A district map showing the road system is available for viewing at the district office. MAGNITUDE OF CONSTRUCTION PROJECT : Between $25,000 and $100,000. CONTRACT TYPE : Firm-Fixed-Price (FFP) Construction APPLICABLE WAGE DETERMINATION : Davis-Bacon Act CONTRACT TIMING AND RESTRICTIONS : Noise restriction will be in place from April 1 to September 23. Work activities above 92 decibels shall occur between 2 hours after sunrise and 2 hours before sunset. Road Closures: Any activities requiring road closure shall be part of a Traffic Control Plan. For minor work the Contractor is authorized to close the roadway for up to 1 hour at a time. Major work may require the Contractor to close the roadway for two, 5-day increments on consecutive weeks from Monday at 8:00 AM through Friday at 5:00 PM. Road closures for major work must occur between August 19 and October 11. The roadway must be passable by the public in typical highway vehicles (without delay) on the weekend between these closures from Friday 5:00 PM until Monday 8:00 AM. PROJECT'S PHYSICAL DATA : Weather Conditions varies by season; Rainfall is less during summer months than winter months; Site is typically snowed out from late fall through early spring; Road Access is good; From Darrington the road is initially paved but transitions into gravel surface, yet is relatively easy access; From Granite Falls the road is initially paved but transitions into gravel surface with very narrow traveled way and sharp corners. Not preferred path for larger equipment; Contractors are advised to visit the project prior to submitting a quote; Elevation ~1,600'. GOVERNMENT FURNISHED PROPERTY (GFP) : 18" culvert and bedding material. PERFORMANCE BOND / ALTERNATE FORM OF SECURITY : Is required for all contracts awarded between $35,000 and $150,000. DESIRED START DATE : August 19, 2019 PLANNED COMPLETION DATE OF ALL WORK : October 11, 2019. PRE-QUOTE MEETING : A pre-quote meeting will NOT be held. TECHNICAL POINT OF CONTACT : Cort Anderson, E-mail: c ortanderson@fs.fed.us, Telephone: (360) 854-2621. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (17-APR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/spg/USDA/FS/05M6/1205M619Q0026/listing.html)
- Place of Performance
- Address: USDA Forest Service Mt. Baker-Snoqualmie National Forest 2930 Wetmore Ave., Ste 3A Everett, WA
- Zip Code: 98248-4067
- Country: US
- Zip Code: 98248-4067
- Record
- SN05284246-F 20190419/190417230009 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |