Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 09, 2019 FBO #6315
SOLICITATION NOTICE

Y -- Building 9201 Program Office

Notice Date
3/7/2019
 
Notice Type
Combine Synopsis/Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Attn: USACE, CESWT- CT 2488 E. 81st Street Tulsa OK 74137-4290
 
ZIP Code
74137-4290
 
Solicitation Number
W912BV19R0011
 
Response Due
4/8/2019
 
Point of Contact
Julie S. Hill, Contract Specialist, Phone 9186697699, - Brian Hutchison, Contracting Officer, Phone 9186697426
 
E-Mail Address
julie.s.hill@usace.army.mil, brian.c.hutchison@usace.army.mil
 
Small Business Set-Aside
N/A
 
Description
This project will be a single-phase design-bid-build construction project for the Building 9201 Program Office. The existing building was constructed in approximately 2001, and originally served as a General Motors assembly plant. After sitting vacant for approximately ten years, the building shall be renovated into the program office. The existing three-story building is approximately 875,000 gross square feet; however, the Program Office will only occupy 82,025 square feet and is limited to a portion of the ground floor. The project scope of work is primarily office space, conference rooms, server rooms, a dock/receiving area, and IT-related activities. In addition to meeting the program, security, and acoustic requirements for the project, making repairs and modifications to the existing building shall be undertaken. Modifications to the exterior of the building include new EPDM roofing system over the program office location and metal wall panel repair. Following decommissioning of the automotive assembly plant, a certain amount of material salvage occurred. However, a significant amount of demolition and deconstruction of existing materials, equipment, and framing remains. This includes but is not limited to the ovens and support framing located on the third-floor mezzanine, substantial manufacturing-specific steel apparatuses, and a variety of smaller non-structural items specific to the auto assembly plant. Although the scope of new construction is limited to a portion of the first floor, the demolition scope for phase one shall include all three floors, from column lines 22 to 33. There are multiple locations where large openings in the floors shall require infill. There are also locations where large pits in the ground floor shall be infilled and new slabs poured to create an even and smooth floor surface. There are several locations where small curbs, uneven floors, and protruding bolts can be found on the existing floor. The existing curbs, bolts, uneven locations in the slabs shall be scraped, ground, infilled, patched and leveled to a condition suitable for new flooring materials. In general, all existing materials which are not part of the structural frame, exterior envelope, exit stairs, or are not otherwise noted to be retained or reused, shall be demolished. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (07-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV19R0011/listing.html)
 
Place of Performance
Address: Tinker Air Force Base Oklahoma City, OK
Zip Code: 73145-8106
Country: US
 
Record
SN05243724-F 20190309/190307230105 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.