Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 08, 2018 FBO #6194
MODIFICATION

20 -- Booster Pump - Salient Characteristics - Package #2

Notice Date
11/6/2018
 
Notice Type
Modification/Amendment
 
NAICS
333914 — Measuring, Dispensing, and Other Pumping Equipment Manufacturing
 
Contracting Office
Department of the Navy, Military Sealift Command, MSC Norfolk (N32205), Building SP-64, 471 East C Street, Naval Station Norfolk, Norfolk, Virginia, 23511, United States
 
ZIP Code
23511
 
Solicitation Number
N3220519Q4362
 
Archive Date
11/28/2018
 
Point of Contact
Samuel N. Queen, Phone: 7574435813
 
E-Mail Address
Samuel.queen@navy.mil
(Samuel.queen@navy.mil)
 
Small Business Set-Aside
N/A
 
Description
Booster Pump Salient Characteristics for Pump QTY: 2: AMPCO ZC2-ZCH2 2" X 2" PUMP OR EQUIVALENTAPPLICATION DATAFLOW RATE: 64GPM. TDH: 205. NRSHR (FT): APPROX 10. SPECIFIC GRAVITY: ASSUME 1.0. TEMPERATURE: 60 DEGRESS F. PUMP SELECTIONMATERIAL: NI/AL/BZ. ASSEMBLY: CLOSE COUPLED. CONNECTION: # 150LB ANSI FLANGES. PORT SIZES: 2" X 2". IMPELLER SIZE: 7.125". SEAL SELECTION TYPE: T21 MECHANICAL SEAL. SIZE: 1.25". SEAT: CERAMIC. ROTATING: CARBON. ELASTOMERS: BUNA. METALLICS: SS. COVER GASKET: LEXIDE. MOTOR SELECTION HP: 15HP. FRAME: 254JM. ENCLOSURE: TEFC. EFFICIENCY: PREMIUMRPM: 3500. PH-HZ-VOLTAGE 3-60-230/460. SF: 1.15 MANUFACTURER: AMPCO (OR EQUIVALENT).ADDITIONAL MOTOR REQUIREMENTS:-SEVERE DUTY FEATURES TO MEET IEEE45-CAST IRON CONSTRUCTION-50 DEGREES C AMBIENT TEMPERATURE (MUST BE ON NAMEPLATE) -CONDUIT BOX EQUIPPED WITH TERMINAL BOARD -CLASS F INSULATION -115V SPACE HEATER WITH LEADS IN MAIN CONDUIT BOX -TEMPERATURE RISE CLASS BADDITIONAL PUMP REQUIREMENTS:-PROVIDE WITH JOHN CRANE MODEL 10 CYCLONE SEPARATOR IN MONEL CONSTRUCTION, AND FLUSH PIPING. CYCLONE SEPARATOR SHALL BE CAPABLE OF 5 MICRONS OR FINER SEPARATION -MOTOR BEARING LIFE EXPECTANCY 20,000 HOURS MINIMUM -MOTOR PROTECTION SHALL BE A MINIMUM OF IP23 -1/4"NPT VENT AND DRAIN CONNECTIONS ARE TO BE INCLUDED, CONNECTIONS SHALL BE DRILLED, TAPPED AND PROVIDED, WITH PLUGS.-1/8" NPT SUCTION AND DISCHARGE PRESSURE GAUGE CONNECTIONS ARE TO BE INCLUDED AT THE NOZZLES. CONNECTIONS ARE TO BE DRILLED AND TAPPED AND PROVIDED WITH PLUGS.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/8182f7ca18759cc1350644a97e730c47)
 
Record
SN05144749-W 20181108/181106231036-8182f7ca18759cc1350644a97e730c47 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.