Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 21, 2018 FBO #6146
DOCUMENT

S -- FY19 New Contract - Cemetery Grounds and Facilities Maintenance Service - Dayton National Cemetery - Attachment

Notice Date
9/19/2018
 
Notice Type
Attachment
 
NAICS
561730 — Landscaping Services
 
Contracting Office
Department of Veterans Affairs;National Cemetery Administration;Contracting Service;75 Barrett Heights Road, Suite 309
 
Solicitation Number
36C78619Q0011
 
Response Due
9/26/2018
 
Archive Date
10/26/2018
 
Point of Contact
John M. Carlock
 
E-Mail Address
6-3863<br
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
Page 1 of 6 36C78619Q0011 Amendment 0004 1. See the attached REVISED Price Schedule 2. Offer due date remains September 26, 2018 at 12;00 noon. 3. All other terms and conditions remain unchanged. SCHEDULE OF UNIT PRICES Base Period: Date of Award through September 30, 2019 CLIN Operation Est. Quantity Unit Unit Cost Total Cost 0001 Camp Chase: Turfgrass - mowing, 2 acres. 39 JB $______ $_________ 0002 Camp Chase: Trim headstones and markers w/ every mowing 39 JB $______ $_________ 0003 Camp Chase: Edging - walks and curbs 9 JB $______ $_________ 0004 Camp Chase: Headstone Raise and Realign. 50 EA $______ $_________ 0005 Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch. 2 JB $______ $_________ 0006 Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June). 2 JB $______ $_________ 0007 Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May). 2 JB $______ $_________ 0008 Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept). 3 JB $______ $_________ 0009 Camp Chase: Turfgrass - aerification (1 x year). 1 JB $______ $_________ 0010 Camp Chase: Turfgrass - overseeding (1 x year). 1 JB $______ $_________ 0011 Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings. 2 JB $______ $_________ 0012 Camp Chase: Sunken grave repair (grade correction and repace turf). 25 EA $______ $_________ 0013 Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings). 52 JB $______ $_________ 0014 Camp Chase: Snow Removal per event. 3 JB $______ $_________ 0015 Camp Chase: POW/MIA Flag raise and lower. 6 JB $______ $_________ 0016 Dayton: Turfgrass - mowing, 107 acres. 39 JB $______ $_________ 0017 Dayton: Trim headstones and markers in conjuction w/ every mowing. 38,959 estimated 39 JB $______ $_________ 0018 Dayton: Edging - walks, curbs. 9 JB $______ $_________ 0019 Dayton: Irrigation system - startup only. 1 JB $______ $_________ 0020 Dayton: Irrigation system: shutdown. 1 JB $______ $_________ 0021 Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June). 2 JB $______ $_________ 0022 Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May). 2 JB $______ $_________ 0023 Dayton: Edging - flat markers 9,896 18 JB $______ $_________ Estimated Total Cost Base Period: $__________             Option Period 1: October 1, 2019 through September 30, 2020         CLIN Operation Est. Quantity Unit Unit Cost Total Cost 1001 Camp Chase: Turfgrass - mowing, 2 acres. 39 JB $______ $_________ 1002 Camp Chase: Trim headstones and markers w/ every mowing 39 JB $______ $_________ 1003 Camp Chase: Edging - walks and curbs 9 JB $______ $_________ 1004 Camp Chase: Headstone Raise and Realign. 50 EA $______ $_________ 1005 Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch. 2 JB $______ $_________ 1006 Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June). 2 JB $______ $_________ 1007 Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May). 2 JB $______ $_________ 1008 Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept). 3 JB $______ $_________ 1009 Camp Chase: Turfgrass - aerification (1 x year). 1 JB $______ $_________ 1010 Camp Chase: Turfgrass - overseeding (1 x year). 1 JB $______ $_________ 1011 Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings. 2 JB $______ $_________ 1012 Camp Chase: Sunken grave repair (grade correction and repace turf). 25 EA $______ $_________ 1013 Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings). 52 JB $______ $_________ 1014 Camp Chase: Snow Removal per event. 3 JB $______ $_________ 1015 Camp Chase: POW/MIA Flag raise and lower. 6 JB $______ $_________ 1016 Dayton: Turfgrass - mowing, 107 acres. 39 JB $______ $_________ 1017 Dayton: Trim headstones and markers in conjuction w/ every mowing. 38,959 estimated 39 JB $______ $_________ 1018 Dayton: Edging - walks, curbs. 9 JB $______ $_________ 1019 Dayton: Irrigation system - startup only. 1 JB $______ $_________ 1020 Dayton: Irrigation system: shutdown. 1 JB $______ $_________ 1021 Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June). 2 JB $______ $_________ 1022 Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May). 2 JB $______ $_________ 1023 Dayton: Edging - flat markers 9,896 18 JB $______ $_________ Estimated Total Cost Option Period 1:   $__________ Option Period 2: October 1, 2020 through September 30, 2021         CLIN Operation Est. Quantity Unit Unit Cost Total Cost 2001 Camp Chase: Turfgrass - mowing, 2 acres. 39 JB $______ $_________ 2002 Camp Chase: Trim headstones and markers w/ every mowing 39 JB $______ $_________ 2003 Camp Chase: Edging - walks and curbs 9 JB $______ $_________ 2004 Camp Chase: Headstone Raise and Realign. 50 EA $______ $_________ 2005 Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch. 2 JB $______ $_________ 2006 Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June). 2 JB $______ $_________ 2007 Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May). 2 JB $______ $_________ 2008 Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept). 3 JB $______ $_________ 2009 Camp Chase: Turfgrass - aerification (1 x year). 1 JB $______ $_________ 2010 Camp Chase: Turfgrass - overseeding (1 x year). 1 JB $______ $_________ 2011 Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings. 2 JB $______ $_________ 2012 Camp Chase: Sunken grave repair (grade correction and repace turf). 25 EA $______ $_________ 2013 Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings). 52 JB $______ $_________ 2014 Camp Chase: Snow Removal per event. 3 JB $______ $_________ 2015 Camp Chase: POW/MIA Flag raise and lower. 6 JB $______ $_________ 2016 Dayton: Turfgrass - mowing, 107 acres. 39 JB $______ $_________ 2017 Dayton: Trim headstones and markers in conjuction w/ every mowing. 38,959 39 JB $______ $_________ 2018 Dayton: Edging - walks, curbs. 9 JB $______ $_________ 2019 Dayton: Irrigation system - startup only. 1 JB $______ $_________ 2020 Dayton: Irrigation system: shutdown. 1 JB $______ $_________ 2021 Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June). 2 JB $______ $_________ 2022 Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May). 2 JB $______ $_________ 2023 Dayton: Edging - flat markers 9,896 18 JB $______ $_________ Estimated Total Cost Option Period 2:       $__________ Option Period 3: October 1, 2021 through September 30, 2022         CLIN Operation Est. Quantity Unit Unit Cost Total Cost 3001 Camp Chase: Turfgrass - mowing, 2 acres. 39 JB $______ $_________ 3002 Camp Chase: Trim headstones and markers w/ every mowing 39 JB $______ $_________ 3003 Camp Chase: Edging - walks and curbs 9 JB $______ $_________ 3004 Camp Chase: Headstone Raise and Realign. 50 EA $______ $_________ 3005 Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch. 2 JB $______ $_________ 3006 Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June). 2 JB $______ $_________ 3007 Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May). 2 JB $______ $_________ 3008 Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept). 3 JB $______ $_________ 3009 Camp Chase: Turfgrass - aerification (1 x year). 1 JB $______ $_________ 3010 Camp Chase: Turfgrass - overseeding (1 x year). 1 JB $______ $_________ 3011 Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings. 2 JB $______ $_________ 3012 Camp Chase: Sunken grave repair (grade correction and repace turf). 25 EA $______ $_________ 3013 Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings). 52 JB $______ $_________ 3014 Camp Chase: Snow Removal per event. 3 JB $______ $_________ 3015 Camp Chase: POW/MIA Flag raise and lower. 6 JB $______ $_________ 3016 Dayton: Turfgrass - mowing, 107 acres. 39 JB $______ $_________ 3017 Dayton: Trim headstones and markers in conjuction w/ every mowing. 38,959 39 JB $______ $_________ 3018 Dayton: Edging - walks, curbs. 9 JB $______ $_________ 3019 Dayton: Irrigation system - startup only. 1 JB $______ $_________ 3020 Dayton: Irrigation system: shutdown. 1 JB $______ $_________ 3021 Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June). 2 JB $______ $_________ 3022 Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May). 2 JB $______ $_________ 3023 Dayton: Edging - flat markers 9,896 18 JB $______ $_________ Total Cost Option Period 3: $__________ Option Period 4: October 1, 2022 through September 30, 2023         CLIN Operation Est. Quantity Unit Unit Cost Total Cost 4001 Camp Chase: Turfgrass - mowing, 2 acres. 39 JB $______ $_________ 4002 Camp Chase: Trim headstones and markers w/ every mowing 39 JB $______ $_________ 4003 Camp Chase: Edging - walks and curbs 9 JB $______ $_________ 4004 Camp Chase: Headstone Raise and Realign. 50 EA $______ $_________ 4005 Camp Chase: Headstones - cleaning and routine alignment correction (bump and run), includes pressure wash wall, columns and arch. 2 JB $______ $_________ 4006 Camp Chase: Turfgrass - pre-emergence herbicide application w/Grub control. (2 acres; April & June). 2 JB $______ $_________ 4007 Camp Chase: Turfgrass - post-emergence herbicide spray. (2 acres; Oct & May). 2 JB $______ $_________ 4008 Camp Chase: Turgrass - fertilization. (2 acres; Oct, June & Sept). 3 JB $______ $_________ 4009 Camp Chase: Turfgrass - aerification (1 x year). 1 JB $______ $_________ 4010 Camp Chase: Turfgrass - overseeding (1 x year). 1 JB $______ $_________ 4011 Camp Chase: Mulch - reapply/refresh mulch in planting beds and tree rings. 2 JB $______ $_________ 4012 Camp Chase: Sunken grave repair (grade correction and repace turf). 25 EA $______ $_________ 4013 Camp Chase: Cemetery cleanup - trash, floral, leaf collection and debris pickup. Mulched bed maintenance - maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings). 52 JB $______ $_________ 4014 Camp Chase: Snow Removal per event. 3 JB $______ $_________ 4015 Camp Chase: POW/MIA Flag raise and lower. 6 JB $______ $_________ 4016 Dayton: Turfgrass - mowing, 107 acres. 39 JB $______ $_________ 4017 Dayton: Trim headstones and markers in conjuction w/ every mowing. 38,959 39 JB $______ $_________ 4018 Dayton: Edging - walks, curbs. 9 JB $______ $_________ 4019 Dayton: Irrigation system - startup only. 1 JB $______ $_________ 4020 Dayton: Irrigation system: shutdown. 1 JB $______ $_________ 4021 Dayton: Turfgrass - pre-emergence herbicide application w/Grub control. (107 acres; April & June). 2 JB $______ $_________ 4022 Dayton: Turfgrass - post-emergence herbicide spray. (107 acres; Oct & May). 2 JB $______ $_________ 4023 Dayton: Edging - flat markers 9,896 18 JB $______ $_________ Total Cost Option Period 4: $__________ Total Aggregate Cost Base Period and All Options       $__________
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VANCA/VANCA/36C78619Q0011/listing.html)
 
Document(s)
Attachment
 
File Name: 36C78619Q0011 0004 36C78619Q0011 0004.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4599310&FileName=36C78619Q0011-0004000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4599310&FileName=36C78619Q0011-0004000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Dayton National Cemeteery;4400 West Third Street;Dayton, OH
Zip Code: 45417
 
Record
SN05096856-W 20180921/180919231258-a76afa4f0f0a18438d84dfbd151553af (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.